freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

api機械密封沖洗方案-在線瀏覽

2024-09-04 17:35本頁面
  

【正文】 om of seal chamber to isolate the heat from the impeller end. ? Used on high temperature applications to minimise heat load on the cooler by cooling only small amount of liquid that is recirculated. ? For high temperature boiler feed pump applications ? Other applications * high temperature liquid close to bubble point. API Piping Plans API 沖洗方案 Recirculation from pump discharge through a cyclone separator delivering clean fluid to the seal and fluid with solids back to pump suction line Clean overflow Underflow Inlet API Piping Plans API 沖洗方案 Points to Note for API Plan 32: Chose a proper source of seal flush to eliminate the potential for vaporisation of the injected fluid and to avoid contamination of the fluid being pumped with the injected flush. Install a labyrinth bushing at the bottom of the stuffing box to control the flushing and pressure if necessary. API Piping Plans API 沖洗方案 Single Seal Flushing from External Source 單密封通過外部來源進行沖洗 Throat Bushing Recirculation from pump discharge through a cyclone separator delivering clean fluid through a cooler and then to seal and fluid with solids back to pump suction line Cooling Water Outlet Cooling Water Inlet API Piping Plans API 沖洗方案 Needle valve External reservoir providing a deadended blanket of fluid to the quench connection of the gland. Points to Note for API Plan 51: Dead ended blanket on atmospheric side of seal to prevent freezing of moisture. Seal face will not stick together when the pump started. Typical application : Pump operating below 0176。C API 682 2nd Edition API 682 第二版 New Piping Plans 新的沖洗方案 Plan 53b () ? Arrangement 3, Contacting Wet (CW) Seals ? Dual Pressurised (Double) Seals ? Utilizes bladder accumulator for pressure ? Bladder eliminates nitrogen contact with barrier liquid ? Allows for higher pressure applications Configuration Includes: ? Accumulator ? Pressure Indicator ? Pressure Switch ? Heat Exchanger BI BO TI BI BO F When Specified API 682 2nd Edition API 682 第二版 New Piping Plans 新的沖洗方案 Plan 53c () ? Arrangement 3, Contacting Wet (CW) Seals ? Dual Pressurised (Double) Seals ? Utilizes piston pot for pressure BI BO BI BO F When Specified API 682 2nd Edition API 682 第二版 New Piping Plans 新的沖洗方案
點擊復制文檔內容
環(huán)評公示相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1