【正文】
ccurate poor finishing as top priority, continued to pay special attention to livestock, fruits, vegetables and other leading industry based on adjusting measures to local conditions to develop the oil with peonies and mountain Walnut 7800 acres, formed a dominant, diverse patterns of industrial development to increase and broaden the way of mass poverty. Im2proved basic conditions. Implementation heihe southern and jade are North mountain masses overall relocation, construction placed District 5 a。 implementation black lianghe SHC tablets with two longitudinal two cross Road Engineering km, built pass Xiang pass village oil (cem2ent) 21 Article 132 km, formed has five longitudinal six cross of County Xiang network system。頂板采用碗式扣件支撐體系100*100與100*50方木及竹膠板搭設。廠家設計、制作了定型大鋼模板、陰陽角模板、防護支掛架、穿墻螺栓與支腿,具體設計詳見廠家設計圖。每層分為四個施工段:基本上以本工程南北與東西中心線為界設置,西南方為I段、西北方為II段、東南方為III段、東北方為IV段。,臂長50m,滿足施工高度和樓層吊裝要求。:2003年12月2004年6月,地上21層。二、吊裝施工方案、資質、塔吊驗收與年檢、拆裝資質證件齊全,塔司取得上崗證的單位承擔吊運施工。、施工方負責基礎施工。,塔吊單位負責安裝和拆卸?!八狡鹬貦C安全規(guī)程”GB51441994。一般情況下,限重為 2T。:10層以下為≥φ16,10層上為φ20。螺栓桿、鋼筋頭、砂漿、砼、施工渣土等散物料都要放在牢固結實的容器內。≤2m鋼??梢噪p塊同吊運行,其他物資要單塊單堆、單容器吊運。:① 安裝時吊運。經(jīng)檢驗,吊索勾掛牢固,吊勾閉鎖到位,