ings or practice instructions, and plete the quality inspection record. Party B must participate in the final pletion acceptance, and prepare the project settlement. Party B must abide by the provisions on the management of the construction sites by the national or local government and related departments, protect the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged. Party B also need to do a good job in such things as the construction site security and garbage disposal, and deal well with the issue of disturbing residents brought about by construction. Without Party A39。s agreement and pay the cost for the measures that Party B takes to crash the schedule. If the project progress is influenced by the delay of Party A39。s responsibility, the practically impacted cycle can not extend accordingly. The project duration shall be prolonged when the downtime is over eight hours (accumulated in one week) caused by the power failure, water failure, gas stop and force majeure factors because of design changes or reasons not related to Party B. 5. Quality Standard and Acceptance Inspection This project takes construction drawings, instructions, design changes and national construction and acceptance specifications such as Construction and Acceptance Standards of Decoration Engineering (JGJ7391), Unified Quality Inspection and Assessment of Architectural Installation Work (GBJ30088) as quality assessment and acceptance standards. Quality of the project should meet the acceptance criterion of national quality assessment. If all or parts of the project reach to the excellent standard, Party A will pay to Party B increased costs. Party A and Party B shall promptly handle the concealed work inspection procedures of preacceptance in the middle of the project. If Party A do not organize covert acceptance in time, Party B can make selfinspection and Party A shall admit the result. If Party A requires the reinspection, Party B shall be in accordance with the requirements for the reinspection. If the reinspection result is acceptable, Party A shall bear the reinspection fee and the project duration can be extended accordingly。s work results in any accidents, liability for such accidents shall be borne by Party B. When the Project is ready for final acceptance, Party B shall submit to Party A the full asbuilt docum