【正文】
..................54 回采巷道布置 .....................................................................................................64 7 井下運輸 ........................................................................................... 66 概述 .....................................................................................................................66 采區(qū)運輸設備選擇 .............................................................................................67 大巷運輸設備選擇 .............................................................................................71 8 礦井提升 ........................................................................................... 73 概述 .....................................................................................................................73 主、副井提升 .....................................................................................................73 9 礦井通風及安全技術 ........................................................................ 75 礦井通風系統(tǒng)選擇 .............................................................................................75 礦井風量計算 .....................................................................................................79 全礦通風阻力計算 .............................................................................................84 通風機選型 .........................................................................................................93 防止特殊災害的安全措施 .................................................................................97 10 設計礦井基本技術經(jīng)濟指標 ........................................................ 100 專題部分 回采巷道復合頂板破壞機理與支護技術 ............................................. 102 1 引言 ......................................................................................................................102 2 復合頂板巷道變形破壞機理 ..............................................................................102 3 復合頂板巷道控制理論 ...................................................................................... 113 4 復合頂板巷道控制技術 ......................................................................................122 5 主要結論 ..............................................................................................................128 參 考 文 獻 ......................................................................................... 130 翻譯 部分 英文原文 ............................................................................................... 132 中文譯文 ............................................................................................... 155 致 謝 ................................................................................................... 172 一 般 部 分 中國礦業(yè)大學 2021 屆本科生畢業(yè)設計 第 1 頁 1 礦區(qū)概述及井田地質(zhì)特征 礦區(qū)概述 井田位置 木城澗井田的開采所有權屬于北京昊華能源股份有限公司,由中華人民共和國國土資源部授予采礦許可(采礦許可證)。 strip district 。s2/m8, equivalent orifice is m2. The cost of the designed mine is 120 yuan per ton. The monographic study is deformation and failure mechanism and roof timbering technique study on roadway of posite roof. The translated academic paper is about implications for stress measurement programs and numerical stability analysis of faults in mines. Its title is that Triggering of Seismicity Remote from Active Mining Excavations. Keywords: opening up by adits。. The proved reserves of this coal mine are Mt and the minable reserves are Mt, with a mine life of geological condition of the mine is relatively simple. The normal mine inflow is 100 m3/h and the maximum mine inflow is 200 m3/h. It is anthracite coal spontaneous bustion tendency, and it‘s a coal that has no dust explosion. This mine adopts opening up by adits with two mining level. The adopted coal winning method is longwall mining to the dip or to the rise. Main roadway makes use of belt conveyor to transport coal resource, and mine car to be assistant transport. Designed first mining district makes use of the method of preparation in mining area, the length of working face is 195 m, which uses fullymechanized coal mining technology, and fully caving method to deal with goaf. The working system is ―threeeight‖,with two and half teams mining, and the other overhauling. Every mining team makes three working cycle, with seven working cycle everyday. Advance of working cycle is m, and quantity of ton coal is makedeveryday. The mine makes use of diagonal ventilation method. At the easy time of mine ventilation, the total air quantity is 3324 m3 per minute, the total mine ventilation resistance is Pa, the coefficient of resistance is N 翻譯部分是一篇關于 采礦活動容易誘發(fā)礦震 的論文,英文原文題目為:Triggering of Seismicity Remote from Active Mining Excavations。設計礦井的噸煤成本 120 元 /t。 礦井 通風困難時期礦井總風量 3324 m3/min,礦井通風總阻力 1224 Pa,風阻 N 通風容易時期礦井總需風量 3324 m3/min,礦井通風總阻力 Pa,風阻 N 日進 7 個循環(huán),循環(huán)進尺 m,日產(chǎn)量 t。 設計首采區(qū)采用 采 區(qū)準備方 式,工作面長度 195 m, 采用一次采全高采煤法 ,全部跨落法處理采空區(qū) 。 礦井采用 雙 平硐兩水平 開拓 ,采煤方法為 走向長壁采煤法。井田地質(zhì)條件簡單。厚約 m。井田走向(東西)長平均約 km,傾向(南北)長平均約 km,井田水平面積為 km2。 中 國 礦 業(yè) 大 學 本科生畢業(yè)設 計 姓 名: 呂 長 國 學 號 : 01050077 學 院: 礦 業(yè) 工 程 學 院 專 業(yè): 采 礦 工 程 論文題目: 木城澗礦 Mt/a 新井設計 專 題: 回采巷道復合頂板破壞機理與支護技術 指導教師: 鄒 喜 正 職 稱 : 教 授 2021 年 6 月 徐州 中國礦業(yè)大學畢業(yè)論文任務書 學院 礦業(yè)工程學院 專業(yè)年級 采礦工程 05級 學生姓名 呂長國 任 務 下 達 日 期 : 年 月 日 畢業(yè)論文日期: 年 月 日至 年 月 日 畢業(yè)論文題目: 木城澗礦 Mt/a 新井設計 畢業(yè)論文專題題目: 回采巷道復合頂板破壞機理與支護技術 畢業(yè)論文主要內(nèi)容和要求: 院長簽字: 指導教師簽字: 中國礦業(yè)大學畢業(yè)論文指導教師評閱書 指導教師評語 (①基礎理論及基本技能的掌握; ② 獨立解決實際問題的能力;③ 研究內(nèi)容的 理論依據(jù)和技術方法;④取得的主要成果及創(chuàng)新點;⑤ 工作態(tài)度 及工作量;⑥總體評價及建議成績;⑦存在問題; ⑧ 是否同意答辯等):