【正文】
168陀螺定向測量gyrostatic orientation survey 169粗略定向rough orientation 170精密定向precise orientation 171逆轉(zhuǎn)點法reversal points method 172懸掛帶零位觀測tape zero observation 173陀螺方位角排gyro azimuth 174陀螺儀子午線gyro meridian 175陀螺定向誤差gyro orientation error 176導(dǎo)入高程測量induction height survey 177通過立井導(dǎo)入高程測量induction height survey through shaft 178井下測量(又稱“礦井測量”)underground survey 179井下水平控制測量underground horizontal control survey 180井下交叉閉合導(dǎo)線underground closed traverse with overhead crossing 181陀螺定向光電測距導(dǎo)線gyro EDM traverse 182方向附合導(dǎo)線directionannexed traverse 183頂板測點roof station 184底板測點floor station 185井下高程測量underground height mersurement 186點下對中centring under point 187采區(qū)測量mining panel survey 188采區(qū)聯(lián)系測量connection survey in mining panel 189巷道碎部測量detail survey of workings 190采場測量stop survey 191井下空硐測量underground cavity survey 192露天礦測量opencast survey 193采掘場驗收測量checkacceptance survey of open pit 194技術(shù)境界標(biāo)定settingout of technical edge 195露天礦爆破工作測量blasting survey of open pit 196墾復(fù)測量reclamation survey 197礦場標(biāo)定setting一out of mining yard 198井筒中心標(biāo)定setting一out of shaft center 199井筒十字中線標(biāo)定setting—out of cross line through shaft center 200普通鑿井法施工測量construction survey for conventional shaft sinking method201邊垂線標(biāo)定settingout of side plumb—bob 202豎井激光指向laser guide of vertical shaft 203井筒延伸測量shaftdeepening survey 204特殊鑿井法施工測量construction survey for special method of shaft sinking 205凍結(jié)法施工測量construction survey for freezing method of shaft sinking 206凍結(jié)壁交圈圖closure plan of ice wall 207鉆井法施工測量construction survey for shaft drilling 208沉井法施工測量construction survey for deep shaft sinking 209礦井提升設(shè)備安裝測量survey for shaft winding plant installation 210巷道中線標(biāo)定setting—out of center line of workings 211巷道坡度線標(biāo)定settingout of workings slope 212激光導(dǎo)向儀給向settingout of driving workings direction by laser guide instrument 213交叉點放樣(又稱“頒岔放樣”)settingout of junction 214巷道驗收丈量footage measurement of workings 215貫通測量holing through survey breakthrough survey 216礦床幾何[學(xué)]mineral deposits geometry 217礦體幾何制圖geometrisation of ore body 218礦產(chǎn)性質(zhì)幾何制圖geometrisation of mineral property 219井下勘探測量underground prospecting survey 220礦層要素測定determination of seam elements 221儲量管理reserve management 222開采沉陷觀測mining subsidence observation 223開采沉陷預(yù)計prediction of mining subsidence 224地表移動觀測站observation station of surface movement 225移動角angle of critical deformation 226邊界角boundary angle, limit angle 227邊坡穩(wěn)定性觀測observation of slope stability 228礦山測量圖mining map 229井田區(qū)域地形圖topographic map of mining area 230礦場平面圖mining yard plan 231井底車場平面圖shaft bottom plan 232采掘工程平面圖mining engineering plan 233主要巷道平面圖main workings plan 234井上下對照圖surfaceunderground contrast plan 235露天礦礦圖opencast mining plan 236采剝工程斷面圖striping and mining engineering profile 237采剝工程綜合平面圖synthetic plan of striping and mining 238排土場平面圖waste dump plan 239防排水系統(tǒng)圖water