【正文】
reservoir capacity of 716 million cubic meters of dead storage of 044 million cubic meters, can be flood control, Hennessy39。另對隧洞的總體布置,以及相應(yīng)的水力計算與結(jié)構(gòu)計算在下文明確給出。2.是根據(jù)隧洞的洞線的選擇原則,并結(jié)合本工程的實際條件進行洞線位置的確定,根據(jù)當(dāng)?shù)氐牡刭|(zhì)、地形、水文、施工等條件,并結(jié)合技術(shù)經(jīng)濟的比較,求定出符合當(dāng)?shù)貤l件的洞型及布置方案,最終確定出兩個方案:(1)無壓隧洞方案,(2)有壓隧洞方案。1.隧洞設(shè)計應(yīng)先對基本資料進行分析。本區(qū)構(gòu)造,普遍發(fā)育有兩組構(gòu)造裂隙,一組為走向北東70度左右,一組為走向北西300340度,均為高角度裂隙。可進行防洪、。同意學(xué)校向國家有關(guān)部門或機構(gòu)送交畢業(yè)設(shè)計(論文)原件或復(fù)印件和電子文檔(涉密的成果在解密后應(yīng)遵守此規(guī)定)。畢業(yè)設(shè)計(論文)作者簽名: 指導(dǎo)導(dǎo)師簽名: 簽字日期: 簽字日期: 畢業(yè)設(shè)計(論文)版權(quán)使用授權(quán)書本人完全了解華北水利水電學(xué)院有關(guān)保管、使用畢業(yè)設(shè)計(論文)的規(guī)定。對本文的研究做出重要貢獻(xiàn)的個人和集體,均已在文中作了明確的說明并表示了謝意。 華北水利水電大學(xué)畢業(yè)設(shè)計(論文 ) 存檔編號 華北水利水電大學(xué)North China University of Water Resources and Electric Power 畢 業(yè) 設(shè) 計 題目 片上水庫導(dǎo)流隧洞設(shè)計 學(xué) 院 水利學(xué)院 專 業(yè) 水利水電工程 姓 名 xxx 學(xué) 號 2010021xx 指導(dǎo)教師 xxx 完成時間 教務(wù)處制 獨立完成與誠信聲明本人鄭重聲明:所提交的畢業(yè)設(shè)計(論文)是本人在指導(dǎo)教師的指導(dǎo)下,獨立工作所取得的成果并撰寫完成的,鄭重確認(rèn)沒有剽竊、抄襲等違反學(xué)術(shù)道德、學(xué)術(shù)規(guī)范的侵權(quán)行為。文中除已經(jīng)標(biāo)注引用的內(nèi)容外,不包含其他人或集體已經(jīng)發(fā)表或撰寫過的研究成果。本人完全意識到本聲明的法律后果由本人承擔(dān)。特授權(quán)華北水利水電學(xué)院可以將畢業(yè)設(shè)計(論文)的全部或部分內(nèi)容公開和編入有關(guān)數(shù)據(jù)庫提供檢索,并采用影印、縮印或掃描等復(fù)制手段復(fù)制、保存、匯編以供查閱和借閱。畢業(yè)設(shè)計(論文)作者簽名: 導(dǎo)師簽名:簽字日期: 簽字日期:North China University of Water Resources and Electric Power 1 摘 要 7 第一章 基本資料 9 流域概況 9 9 10 年徑流 10 泥沙 11 11 11 11 11 11 12 汛后最高蓄水位 13 水電站 13 13 14 14 15 庫區(qū)滲漏問題 15 工程地質(zhì)條件 16 17 17 其他建筑物的工程地質(zhì)條件 19 ——付壩 19 19 19 20 20 20 20 其他數(shù)據(jù) 22 22 24 第二章 樞紐布置 25 、壩線選擇 25 主壩壩型選擇 25 付壩壩軸線和壩型選擇 29 溢洪道位置選擇 29 水電站位置選擇 30 樞紐總體布置簡述 32 第三章 洞址的選型 33 隧洞設(shè)計的任務(wù) 33 洞線位置的選擇 33 洞線位置的選擇原則 33 洞線位置的選擇 33 洞身斷面型式的選擇 33 第四章 無壓洞設(shè)計 34 隧洞的總體布置 34 進口建筑物的形式 34 進口段的組成 34 洞身段的選型 37 37 襯砌尺寸的確定 37 38 隧洞進口段尺寸的確定 38 洞身斷面尺寸的確定 40 第五章 水力計算 48 48 48 50 51 51 51 51 52 54 第六章 無壓洞段結(jié)構(gòu)計算 57 57 57 57 57 58 58 68第七章 細(xì)部構(gòu)造設(shè)計 73 襯砌的分縫 73 73 74 隧洞灌漿 74 75 75 隧洞的排水 75附錄1 開題報告 78華北水利水電大學(xué)本科生畢業(yè)設(shè)計(論文)開題報告 78附錄2 設(shè)計任務(wù)書 81 畢業(yè)設(shè)計目 81 81: 81 設(shè)計成果及要求 82 82 設(shè)計圖紙 83 時間安排 83附錄3 畢業(yè)設(shè)計指導(dǎo)書 84 84 泄洪隧洞設(shè)計 84 泄洪隧洞結(jié)構(gòu)布置及水力計算 84 襯砌結(jié)構(gòu)計算 84 隧洞進、出水口設(shè)計 84 隧洞排水、灌漿布置 85附錄4 Gravity Dam 85重力壩 8795 摘 要河海流域大清河北支流拒馬河上的片上水庫是一座大(二)型綜合利用水利工程。庫區(qū)兩岸主要為輝綠巖,輝綠巖分布高程只在局部地段低于庫水位(即沈家閹村西的南水溝一帶),170m以下不存在滲漏問題。導(dǎo)流泄洪洞沿洞線周圍巖石厚度大于三倍的開挖洞徑,出口段已經(jīng)避開塌滑體的東邊界,沿線巖層巖性主要是灰?guī)r(局部變質(zhì)成大理巖)夾絹云母片巖,巖石較為堅硬。對隧洞的任務(wù)及該處的地質(zhì)情況、地形、河流附近的水文氣象特征、材料以及對外交通狀況進行大致分析。本設(shè)計是無壓隧洞方案的設(shè)計。并擬定細(xì)部構(gòu)造。s adjustment capacity of 672 million cubic meters. Reservoir area of crossstrait mainly diabase, diabase distribution of elevation just below the reservoir water level in the local section, 170m below the leakage problem. Construct of the area, widely developed in the two sets of tectonic fissures, a group toward the northeast about 70 degrees, a group of 300340 degrees toward the northwest, are highangle cracks.Diversion spillway tunnel along the tunnel line of the surrounding rock thickness greater than three times the excavation hole diameter and outlet sections to avoid the eastern boundary of the landslide body, along the rock lithology is limestone (local metamorphism into marble) folder sericite schist, rock hard. 1 The tunnel design should be the basic data for analysis. Roughly analyze the task of the tunnel and the department39。s hydrological and meteorological characteristics, materials and external transport situation. 2. According to the principle of selection of the hole in the line of the tunnel, bined with the actual conditions of the project to determine the location of the hole line, according to local conditions, such as geology, topography, hydrology, construction, bined with the technical and economic parison, find the prescribed in accordance with local conditions hole type and layout programs, and ultimately identified two options: (1) freeflow tunnel program, (2) the pressure tunnel program. This design is the design of freeflow tunnel program.The overall arrangement of tunnel, and the corresponding hydraulic calculation and structural calculation as expressly stated below. And for detail structure. To ensure design pletedKeywords: reservoir hydraulic calculation calculation of the structure The detailed structure第一章 基本資料 流域概況 片上水庫是河海流域大清河北支流拒馬河上的一座大(二)型綜合利用水利工程。 拒馬河發(fā)源于河北省淶源縣,流經(jīng)淶源、易縣、淶水山峽地區(qū),至北京房山縣張坊鎮(zhèn)流入平原,并分南北兩支。拒馬河位于太行山東麓,流域面積約10000km2。山區(qū)多為石質(zhì)山區(qū),植被較少,坡度較陡。平原河槽較窄,坡度很緩。本工程可為東部平原房、淶、涿灌區(qū)的一百多萬畝農(nóng)田灌溉、北京生活及工業(yè)用水提供水源。附近張坊站平均年降雨量740mm,℃,年內(nèi)氣溫變化較大,℃,最低溫度26℃。由于天氣系統(tǒng)及地形抬升的相互影響,張坊上游的紫荊關(guān)一帶極易形成暴雨,如1950年8月上旬、1955年8月中旬、1956年、1963年8月上旬均出現(xiàn)日降雨量大于100mm的暴雨。本流域洪水均為暴雨洪水,主要發(fā)生在七、八月份,一次洪水歷時5天左右。據(jù)實測20年資料統(tǒng)計,洪峰流量最大為9920m3/s(1963年),最小洪水為45m3/s(1965年)相差220倍。本流域調(diào)查到的最大洪水為1801年,經(jīng)計算得洪峰流量為20000m3/s。洪水實測資料中,以1963年最大,1956年次之,洪峰流量分別為9920m3/s和4200m3/s,以1963年、1956年的的平均概化過程線為典型,按洪峰流量比值放大計算得設(shè)計洪水、校核洪水過程線()。年徑流按紫荊關(guān)張坊站區(qū)間的徑流量計算,(19561957年),(19651966年),相差11倍。據(jù)實測資料計算,紫張區(qū)間多年平均輸沙量為46萬噸,推移質(zhì)占總沙量的20%??紤]到本水庫應(yīng)有一定的防洪庫容以攔蓄洪水,若降低洪水位對防洪、興利效益大為不利,而若提高洪水位,可能降低京原鐵路標(biāo)準(zhǔn)或進行局部改建,協(xié)調(diào)二者,(P=1%)??紤]在校核洪水時不影響鐵路正常通車,(P=%),(僅供設(shè)計參考)。工業(yè)給水保證程度要求較高,本水庫電站擬采用的抽水蓄能機組,水輪機最小工作水頭為28m,灌溉用水,為了盡量利用水庫水量,希望取水口高程低些。遇1955年洪水限泄1300m3/s時,洪水不漫灘;遇1963年洪水限泄3000m3/s,不超過現(xiàn)有河道行洪能力;遇到校核洪水時,限泄最大流量7000m3/s;當(dāng)水位達(dá)到190m時,相應(yīng)最大泄量為18000m3/s。因此,相應(yīng)汛限水位為168m。防洪、考慮淤積后,汛期興利庫容為3億立米。農(nóng)業(yè)灌溉毛定額按400m3/畝計算。徑流調(diào)節(jié)依據(jù)紫張區(qū)間多年實測徑流量(),加上紫荊關(guān)水電站汛期棄水量(),進行調(diào)節(jié)計算。 片上水庫流量保證率曲線 調(diào)節(jié)流量表標(biāo)準(zhǔn)