【正文】
allation supplied by Shanghai Project Engineering Department。——《大型設(shè)備吊裝工程施工工藝標(biāo)準(zhǔn)》SHJ 51590; Technics Standards for Construction of Suspending and installing heavy facilities, SHJ51590 ——《石油化工施工安全技術(shù)規(guī)程》SH 35051999; Safety technology regulations for construction of Petrochemichal, SH35051999;——《建筑地基基礎(chǔ)規(guī)范選編》中國(guó)建筑工業(yè)出版社1993年版; Chapters from architecture groundwork basic regulations, China architecture industry publishing pany, 1993 edition——《起重工操作規(guī)程》SYB411280;Operation regulations for craneman, SYB411280;2) SECCO IPMT提供的設(shè)備規(guī)格表(4月23日)及相關(guān)圖紙,詳見設(shè)備表; Specification form and related drawings of facilities supplied by SECCO IPMT (April,23), see equipments table for details;3) 上海項(xiàng)目工程部提供的50萬噸/年乙苯/苯乙烯裝置安裝工程施工投標(biāo)文件; Tender documents, construction of 500,000t/y installation for Ethylbeneze amp。This scheme is applicable to suspending heavy facilities, which involved 17sets over 100 ton each, with installation of 500,000t/y for Ethylbeneze amp。 The underground pipeline influenced by the crane station will construct after exit of crane, the North: November 24, 2003。 Construct the basic from February 20, 2004.4) 吊車站位影響的地下管道在吊車退場(chǎng)后開始施工。 Construct the basic from November 24, 2003. 3) 吊車站位3: Z600X60P601P6016A/B;基礎(chǔ)04年2月20日后施工。Construct the basic from November 24, 2003. 2) 吊車行走: D600P601P6004 and P6006;基礎(chǔ)03年11月24日后施工。 Excellent lifting of super lifting 600t and the most semidiameter is 25meter.6. 吊車組裝位置和移動(dòng)位置以及各吊裝作業(yè)位置: Coordinate of the CC8800 pedrail suspending station車位序號(hào)Crane Station No.E坐標(biāo)Cooperate EN坐標(biāo)Cooperate N所吊設(shè)備位號(hào)Lifted equipment No.13433T4003 T4001 236443432T2001 T2003 E2001A/B336703351R3001 R3002 E3004/3006/3007E4003A/B/C E3009A/B7. 吊車站位及移動(dòng)對(duì)場(chǎng)地的要求: Requirements for lifting site by crane standing position and moving: 影響吊車占車及行走的設(shè)備基礎(chǔ)及施工時(shí)間要求: Requirements for facilities basic and construction time of influencing crane by being occupied and moved: 1) 吊車站位1: 裝置北界區(qū)外管廊、P4013A/B/C、P4016;基礎(chǔ)03年11月24日后施工。 吊車的機(jī)動(dòng)性能好,可載重行走; Good flexibility of crane, which can walk with loading as well。● According to the conditions supplied to Shanghai medicament industry academy of design, perform the places and directions of main suspending and trail hole. 其它設(shè)備Other facilities抬尾吊耳在正上方Suspending trail hole in the median above place按現(xiàn)場(chǎng)平面圖位置擺放Put as the ichnography place on site方向按現(xiàn)場(chǎng)平面圖位置擺放。Use the deliverying bicycle saddle of the facilities to support the saddle. 設(shè)備擺放要求 Requirements for putting the facilities T4001● 抬尾吊耳在正上面● Suspending trail hole in the median above place●主吊耳在水平位置●The main suspending hole in the horizontal place●主吊耳位置運(yùn)到基礎(chǔ)中心位置,方向按現(xiàn)場(chǎng)平面圖位置擺放。每個(gè)支撐面積9平方米(每個(gè)支撐垛下面鋪設(shè)δ30~40mm鋼板)。 Use 250ton pedrail crane Model 250 to delivery or suspend directly after the smaller facilities being deliveried on site.4) 如果設(shè)備卸于臨時(shí)庫房,則根據(jù)設(shè)備重量、規(guī)格尺寸等條件采用KMK5160型160噸汽車吊單車或160噸汽車吊與TG1300型130噸汽車吊雙車抬吊的方法將設(shè)備裝車,封車后運(yùn)輸至現(xiàn)場(chǎng),采用160噸汽車吊單車或160噸汽車吊與130噸汽車吊雙車抬吊的方法卸車。 Consider the logical relationship of entering onsite and suspending time for facilities sufficiently, try best to use CC8800 to unload and suspend directly from the trailer.2) 大型設(shè)備根據(jù)合同由運(yùn)輸方直接運(yùn)輸至現(xiàn)場(chǎng)指定位置?!?Exit from the oil pressure plank. 支撐處理 Supporting disposal設(shè)備下由2個(gè)支撐點(diǎn)4個(gè)支撐垛受力,每個(gè)支撐垛應(yīng)滿足受力要求,支撐垛與地接觸面積為9平方米(每個(gè)支撐垛下面鋪設(shè)δ30~40mm鋼板,支撐垛由鋼結(jié)構(gòu)支架或道木垛組成)?!?降下油壓板車,將設(shè)備落到卸車鞍座上;● Down the oil pressure plank and let the facilities on the unload’s bicycle saddle。● 啟動(dòng)油壓板車升降千斤頂,將設(shè)備頂起;● Startup the lifting and droping jack of oil pressure to peak up the facilities。● 油壓板車進(jìn)入指定位置;● Enter the oil pressure plank machine to the appointed place。 NO 8 Road: install 1250t crane from February 1st to 9, 2004. 設(shè)備卸車配合及支撐 Cooperating and supporting of unloading facilities 卸車 Unloading● 預(yù)搭設(shè)支撐垛。 Supply pricipal purvey equipments with quality and quantity in time according to the project requirement, and organize to check and accept the received facilities. 2.運(yùn)輸路線: (運(yùn)輸公司編制)Transportation route: (workout by transport pany)3.運(yùn)輸車輛的性能特點(diǎn)(運(yùn)輸公司編制) Functions and features of vehicles (workout by transport pany)4.卸車位置及方位 Unloading places and orientation 、吊裝順序(詳見大型設(shè)備吊裝運(yùn)行計(jì)劃) Unloading and suspending orders of heavy facilities (see running plan of suspending heavy facilities) 設(shè)備擺放所占的道路及時(shí)間: Road and time occupied by putting the facilities:1)10路:擺放T400T4003安裝平臺(tái)、保溫、管線 03年10月15日11月6日;2月1日2月9日 NO 10 Road: put T4001 during October 15 to November 6, 2003。 Facility pricipal take charge of vertify and affirm the conditions of construction facilities on site, daily maintaining and management of facilities and attending risk evaluating. 安全負(fù)責(zé)人負(fù)責(zé)提出HSE實(shí)施計(jì)劃,監(jiān)督HSE管理的實(shí)施。 Quality pricipal charge in examination and affirm the special worker mooount guard with certification, he also attend in checking and accept the received facilities, organize to check and accept the facilities basic, check and affirm the construction quality.設(shè)備負(fù)責(zé)人負(fù)責(zé)對(duì)進(jìn)場(chǎng)施工設(shè)備的狀況進(jìn)行核實(shí)確認(rèn)。 Suspending mander on site take charge of organizing to practice the suspending scheme.技術(shù)負(fù)責(zé)人負(fù)責(zé)編制吊裝方案,參加技術(shù)交底,參加技術(shù)攻關(guān)工作,參與風(fēng)險(xiǎn)評(píng)估和吊裝前的檢查確認(rèn)。1. 組織管理體系:Organization management system 現(xiàn)場(chǎng)吊裝組織機(jī)構(gòu)Suspending organization on site 吊裝總指揮技術(shù)供應(yīng)質(zhì)量安全吊裝顧問組抬尾指揮主吊指揮起重班機(jī)械操作員測(cè)量人員其他工種設(shè)備鉚工班現(xiàn)場(chǎng)吊裝指揮 Suspending advisor team Chief mander of suspending Technology supply facility quality safety Suspending mander on site Main suspending mander lifting trail mander Lifting team