freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

工程碩士論文格式范例-文庫吧資料

2024-11-24 19:19本頁面
  

【正文】 干預(yù)的經(jīng)濟(jì)領(lǐng)域。 3 ?? 1 Short and Jim W. Preparing a Proposal for BOT Project. Transaction of Annual Meeting, 1998(6) 2 Ngee Loh and Tiong Robet L. K. Automated Approach to Negotiation of BOT Contracts . Journal of Computing in Engineering , 1997(3):121128 3 Prendergast J. Privation Takes Its Toll. Road Financing Strategies in the C. S. World Civil Engineering 1996(1):p63 標(biāo)題:黑體 16 磅 加粗居中,單倍行距,段前 24磅,段后 18 磅, 章序號與章名間空一個漢字符 一級節(jié)標(biāo) 題:黑體 14 磅 加粗 頂左,單倍行距,段前 24 磅,段后 6 磅,序號與題名間空一個漢字符 段落文字:宋體 12 磅(英 文用 Times New Roman 體 12磅),兩端對齊書寫,段落首行左縮進(jìn) 2 個漢字符。 國內(nèi)外研究現(xiàn)狀 BOT 最初產(chǎn)生于國外,許多文獻(xiàn)進(jìn)行了比較深入 的研究。 ?? 另外, BT 項目在深入運用的實踐過程中引發(fā)了相關(guān)問題,項目的建設(shè)費用過大問題、投資方建設(shè)資金不到位、項目回購風(fēng)險問題、項目工程質(zhì)量問題及項目運作的建設(shè)管理方式等問題逐漸暴露出來,目前還沒有較好的解決辦法。 內(nèi)容:宋體 12 磅 ,行距 20磅,段前段后 0 磅 ,首行縮進(jìn) 2 字符 標(biāo)題:黑體 16磅 加粗居中,單倍行距,段前 24 磅,段后 18 磅 宋體 12 磅 ,行距 20 磅,段前段后 0 磅 ,詞與詞間用逗號隔開,“關(guān)鍵詞”三字加粗 頁碼:羅馬 大寫 數(shù)字 ,Times New Roman 9 磅 Abstract II ABSTRACT Public infrastructure facilities is the foundation of national economy. Entering 21 century ,with entering WTO, China bees more international, national economy remains developing rapidly. The level of urbanization raises continually. The bottleneck action of public infrastructure facilities to economic development is outstanding day by day . So, it is a pressing matter of the moment to strengthen the building of public infrastructure facilities. The paper analyses the present situation that the lack of funds for construction on public infrastructure facilities and the inefficiency of management. It points out that general adoption of the market principle reform must be enforced. Introducing theories of project classification and marketability into it, the paper introduces some management models which are used in different kinds of public infrastructure facilities, including BOT model, project acting build model, BT model. The paper analyses the concept, apply scope, basic characters, significance, financing pattern, process, capital management and so on. Meanwhile, it analysis the problems that exists in the use of MT model in China. It points that BT model is not equal to paying before contract, the model that investor is constructor has both advantages and disadvantages. How to control construction cost and quality of projects? How to invade repurchase risk? To deal with the outstanding problems existing, The paper puts forward a proposal of BT financing project acting build model on these questions. ?? Finally, the paper gives the cases of asses project of Shanghai external ring tunne
點擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1