【正文】
actory) inspection reports項目名稱Project name 編號serial no. 產(chǎn)品名稱product name:終端箱terminal box 型號規(guī)格model:PZ30 出廠編號serial number:序號No.試驗項目testing items標準要求standards測試設備testing device測試結果Testing results 備注remark1一般檢查General examination電器元件應經(jīng)過檢驗合格,有合格證明書。IP30: with 162。between the main circuit and control circuit.各帶電部件與金屬框架之間。the fastening points between metal mounting structure and frame should penetrate nonconductive insulation, grounding resistance should be ≤ 100mΩ, measuring not less than five points. Test current 10A.測試儀tester7絕緣電阻測量Insulation resistance measurement絕緣電阻應≥1kΩ/V測量部位如下insulation resistance ≥ 1kΩ / V measurement position as follows::主開關電器在斷開位置時兩個斷口之間when the main electrical switch is off, between the two fracture絕緣電阻儀Insulation resistance meter主開關電器在閉合位置時的不同極的帶電部位之間。the insulating material of the shell and handle with live parts and bare conductive parts times the voltage applied6保護電路連續(xù)性試驗protection circuit continuity test金屬安裝結構與框架之間的緊固點應穿透不導電絕緣層,接地電阻應≤100mΩ,測量點不少于5處。parts be manually operated five times, operation flexible, no clamping stagnation. Mechanical electrical chain effective.4通電操作power operation通電操作5次,電器元件動作正常、儀表指示準確,符合裝置的電氣設計要求。any parts can be removed in the same specification of the two isolation rooms inserted and taken out five times, check the exchange situation, inserted and taken out should be flexible.手動操作