【正文】
a. Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tackwelded junction, and for broken welds.b. 檢查殼體支撐焊縫的蝕損斑,特別是對(duì)于殼板Check support welds to shell for pitting, especially on shell plates.c. 注意是否在殼體上有加強(qiáng)板支撐Note whether supports have reinforcing pads welded to shell. 殼體附屬裝置 人孔和管口a. 檢查管口,人孔,加強(qiáng)板的開裂和泄漏跡象b. 檢查管口四周殼板的窩形,這是由于管子過度偏向造成的c. 檢查法蘭和螺栓四周的泄漏d. 檢查人孔和管口保溫層的泄漏e. Check for inadequate manway ?ange and cover thickness on mixer 罐體的管線 ```,`,`,`,`,`a. 檢查閥和法蘭的泄漏b. 檢查消防系統(tǒng)元件c. 檢查錨定的管線(由于地層位移對(duì)底部或殼體連接的損害)d. 檢查管線有足夠的熱壓力的釋放e. Check operation of regulators for tanks with purge gas systems.f. 檢查取樣口的泄漏和合適的閥門操作條件g. 檢查溫度指示器并測(cè)試h. 檢查殼體上連接6”以上閥的吊柱的焊縫 自動(dòng)標(biāo)尺系統(tǒng)a. 檢查自動(dòng)標(biāo)尺帶的導(dǎo)向器和下滑輪箱(浮動(dòng)擺桿)的泄摟Inspect autogauge tape guide and lower sheave housing (?oating swings) for leaks.b. 檢查自動(dòng)標(biāo)尺頭的損壞Inspect autogauge head for damage.c. 撞擊標(biāo)尺頭的檢測(cè)器看帶有無(wú)合適的位移Bump the checker on autogauge head for proper movement of tape.d. Identify size and construction material of autogauge tape guide (?oating roof tanks).e. Ask operator if tape tends to hang up during tank roof movement (?oating roof tanks).f. Compare actual product level to the reading on the autogauge (maximum variation is2 in.).g. 對(duì)于浮頂罐,當(dāng)浮頂在最低位置時(shí),檢查暴露在帶導(dǎo)向器上的帶子不超過2英尺On ?oating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide.h. Inspect condition of board and legibility of boardtype autogauges.i. 測(cè)試標(biāo)識(shí)器和浮動(dòng)自由度Test freedom of movement of marker and ?oat. ShellMounted Sample Stationa. Inspect sample lines for function of valves and plugging of lines, including drain or returntotank line.b. 檢查循環(huán)泵的泄漏和操作問題Check circulation pump for leaks and operating problems.c. 測(cè)試樣品線和設(shè)備的支柱和支撐Test bracing