【正文】
Components (Shanghai) Co., Ltd. – AV FMEA Implementation 2 One of the most important factors for the successful implementation of an FMEA program is timeliness. It is meant to be a “beforetheevent” action, not an “afterthefact” exercise. To achieve the greatest value, the FMEA must be done before a design or process failure mode has been unknowingly designed into the product. Up front time spent in doing a prehensive FMEA well, when product/ process changed can be most easily and inexpensively implemented, will alleviate late change crises. An FMEA can reduce or eliminate the chance of implementing a corrective change which could create an even larger concern. Properly applied, it is an interactive process which is never ending. Philips Electronic Components (Shanghai) Co., Ltd. – AV What’s Process FMEA? A Process potential FMEA is an analytical technique utilized by a Manufacturing Responsible Engineer/ Team as a means to assure that, to the extent possible, potential failure modes and their associated cause/ mechanisms have been considered and addressed. In its most rigorous form, an FMEA is a summary of the engineer’s/ team’s thoughts (including an analysis of items that could go wrong based on experience and past concerns) as a process is developed. This systematic approach parallels and formalizes the mental discipline that an engineer normally goes through in any manufacturing planning process. Philips Electronic Components (Shanghai) Co., Ltd. – AV The Process potential FMEA ? Identifies potential product rela