【正文】
Tyre plant. The scheduling was designed for the rubbermaking process that covered not only discrete but also continuous circumstances. To make a balance point between optimization quality and time cost I proposed a Dynamic layered Scheduling method based on hybrid Petri Nets. The practical application showed that the average makespan was shortened by a large scale. I also publicized two papers in core journals with this idea. Recently I am doing research in the Composite Predict of the Electrical Power system assisted with the technology of Data Mining for Bao Steel. I try to bine the Decision Tree with Receding Optimization to provide a new solution for the Composite Predictive Problem. This project is now under construction. Besides In July 2000 I got the opportunity to give a lecture in English in Asia Control Conference (ASCC) which is one of the toplevel conferences among the w