【正文】
拼一個(gè)春夏秋冬!贏一個(gè)無悔人生!早安!—————獻(xiàn)給所有努力的人.。不奮斗就是每天都很容易,可一年一年越來越難。是狼就要練好牙,是羊就要練好腿。也可根據(jù)用戶需要特殊設(shè)計(jì)制造。Contactor power of signal switch should ply with the valves in Table Ⅵ.表6 Table Ⅵ電壓種類kind of voltage supply電壓Vvoltage電阻負(fù)載AResistance load感性負(fù)載Ainductance load交流AC22053(cosφ= )直流DC(T = 7ms)6. 到貨驗(yàn)收注意事項(xiàng)及故障處理方法 Arrival acceptance notice and fault treatment 檢查運(yùn)輸過程中壓力釋放閥是否有破損 Check whether there is damage during transport 文件是否丟失Whether the files are missing 螺紋安裝的釋放閥閥座是否丟失Whether the pressure release valve seat for screw installation is missing 壓力釋放閥不動作,檢查鎖帽是否拿掉 Pressure relief valve does not move, check whether the lock nut is removed 壓力釋放閥動作后沒有信號輸出,應(yīng)檢查接線盒及其線路是否正確連接 After the pressure release valve movements no signal output, should check the wiring box, whether the wiring is connected firmly。 ScrewAll of the products equipped with lock nut, 閥座but when seal test of the transformer, Valve seatthe lock should be in its place, when 密封膠墊transformer put into use, it should be Sealing gaskettaken away. Otherwise the release valve 閥托will not act when the transformer takes place Valve caretrouble, which will cause serious result. 圖 二 Picture II (例如 .: YSF835,55/50KJT):取下鎖帽后必須確認(rèn)防雨帽是否完好地安裝在標(biāo)示桿上,并將保護(hù)套帶上,否則下雨時(shí)雨水浸入釋放閥,將引起電器部分損壞。 防雨帽Turn the release valve with the sealing Rain shieldrubber ring into the screw of the valve seat. 標(biāo)示桿 Pay attention to the installation quality of Indicator the sealing rubber ring and there should be 閥蓋Valve lidno oil leakage. 閥罩 每臺產(chǎn)品均配套有鎖帽,但它僅是 Valve cover便于用戶在做變壓器整體密封試驗(yàn) 接線盒時(shí)使用,變壓器運(yùn)行前必須其取下。Tighten the connection bolts. 螺紋連接的釋放閥,在變壓器箱蓋上開孔尺寸見表4,然后將產(chǎn)品配備的閥托焊上即可。 Tighten the installation bolts. 將壓力釋放閥噴口法蘭、變壓器本體排油管法蘭及中間密封墊孔對齊。The flange seat should be provided for mounting pressure release valves. 將變壓器本體上的安裝法蘭,蝶閥,壓力釋放閥的安裝螺栓孔對齊(蝶閥兩端的密封膠圈要放平