freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

北京市房屋建筑修繕及裝修工程施工合同甲種本(參考版)

2024-11-12 23:41本頁面
  

【正文】 5. lif t ing oper at ions must be r un on all kinds of hoist ing m achiner y par ts, saf et y devices as well as slings, r igging a det ailed secur it y checks, securit y devices f or l。 3. lif t ing oper ations m ust be pr ovided f or lif t ing loads, slings, r igging and econom ic calculat ion options, do not overload. When lif t ing heavy obj ect s close t o or r each t he r at ed lif t ing capacit y, check br akes, low height , shor t str oke af t er t he load t est, hen sm oot hly lif t ed. Lar ge and m edium sized equipm ent bef or e lif t ing, load t est should be car r ied out . Tr y hanging height f or about 0. 2m and t hen conduct a r eliabilt y check ( including t he select ion and calculat ion of saf ety f actor ). Overload lif t ing is st r ict ly pr ohibit ed. 4. bef or e lif t ing m ust pad t he wood and t he wood used must be of adequat e size ( be sure t o over 1 m) 。 t ask light ing should use explosion proof lam ps and explosion pr oof t ools should be used, pr ohibit ion of beat ing wit h an ir on pipe, f lange, et c. 9. high blocking blind Boar d oper at ion shall f olow t he pr ovisions of license f or wor king at height . 10. const r uction unit t o blind a lot accor ding t o t he r equir em ents of t he per mit t o wor k, t he im plem entat ion of saf ety m easur es, wor k can be car ried out . 11. is st r ictly pr ohibit ed on t he same pipe sim ult aneously in t wo places and t wo or m or e blocking blind Boar d oper ations. When plugging m ult iple blind, blind t o blind locat ion m ap and plat es num ber by constr uction Gener al M anager , unit y of mand assignments. 12. signs in each blocking blind Boar d shows t hat blind locat ion. ( C) t he blocking blind Boar d per mit s t he management of 1. . . Blind locat ion m ap, im plem ent securit y m easures, af t er t he approval of t he t echnical depar tm ent , assignment unit s ( staf f) t o confir m. J ob plex, dangerous places r equir ed secur it y audit s of t he Depart ment of envir onment al pr ot ection, t he pany in char ge of safety Vice Pr esident for approval. 4. appr ove a good blocking blind Boar d oper at ing license in t r iplicat e, m ain cont r act ors, oper ating unit s, each hold a copy of t he bio sect ion. 5. af ter t he end of t he j ob, j obs, t echnical check, activit y handed t he blind locat ion t echnology. 6. wor k per m it s m anagem ent should est ablish t he t icket f ile ( invent or y), t he t icket is kept f or 3 year s. The lif t ing oper at ion m anagem ent syst em , pur pose in or der t o cont r ol t he pr oduction wit hin t he r egion, lif t ing, lif t ing act ivit ies t o pr event he occur rence of accident s, t he syst em is f or m ulat ed. Second, t he scope of applicat ion of t his system applies t o all panies wit hin t he l if t ing oper ation. Thir d, lif t ing a l icense of gr aded cr edit t hr ee levels of m anagement: ( I) Gener al equipm ent, weighing less t han 1 t on of weight lif t ing, t he lif t ing of t he r ules, t echnol gy r eview, wor kshop Dir ect or f or appr oval。 ir r it ant gas pr essur e should be less t han 50 m m Hg。 一、工程概況 工程名稱: ____________________________________________ 工程地點(diǎn): ____________________________________________ 資金來源: ____________________________________________ 工程內(nèi)容及性質(zhì): ______________________________________ 工程立項(xiàng)批準(zhǔn)文號: ____________________________________ 群體工程應(yīng)附承包人承攬工程項(xiàng)日一覽表 (附件一 ) 二、工程承包范圍及方式 承包范圍: 承包方式: 三、合同工期 開工日期: 竣工日期: 合同工期總?cè)諝v天數(shù): 天。 5. lif t ing oper at ions must be r un on all kinds of hoist ing m achiner y par ts, s af et y devices as well as slings, r igging a det ailed secur it y checks, securit y devices f or lif t ing equipm ent is sensit ive and r eliable, no ilness. M ust r y befor e lif t ing cr ane, confir med bef ore t hey can wor k. 6. lif t ing oper at ions, r emoved plat f or m guardr ail m ust be r estor ed (t he bolt activit y f ence rem oval is st r ict ly pr ohibit ed)。 3. lif t ing oper ations m ust be pr ovided f or lif t ing loads, slings, r igging and econom ic calculat ion options, do not overload. When lif t ing heavy obj ect s close t o or r each t he r at ed lif t ing capacit y, check br akes, low height , shor t str oke af t er t he load t est, hen sm oot hly lif t ed. Lar ge and m edium sized equipm ent bef or e lif t ing, load t est should be car r ied out . Tr y hanging height f or about 0. 2m and t hen conduct a r eliabilt y check ( including t he select ion and calculat ion of saf ety f actor ). Overload lif t ing is st r ict ly pr ohibit ed. 4. bef or e lif t ing m ust pad t he wood and t he wood used must be of adequat e size ( be sure t o over 1 m) 。 t ask light ing should use explosion proof lam ps and explosion pr oof t ools should be used, pr ohibit ion of beat ing wit h an ir on pipe, f lange, et c. 9. high blocking blind Boar d oper at ion shal f olow t he pr ovisions of license f or wor king at height . 10. const r uction unit t o blind a lot accor ding t o t he r equir em ents of t he per mit t o wor k, t he im plem entat ion of saf ety m easur es, wor k can be car ried out . 11. is s t r ictly pr ohibit ed on t he same pipe sim ult aneously in t wo places and t wo or m or e blocking blind Boar d oper ations. When plugging m ult iple blind, blind t o blind locat ion m ap and plat es num ber by constr uction Gener al M anager , unit y of mand assignments. 12. signs in each blocking blind Boar d shows t hat blind locat ion. ( C) t he blocking blind Boar d per mit s t he management of 1. . . Blind
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1