【正文】
電力工業(yè)經(jīng)過五年不懈努力取得的相對緩和的平衡仍然是低水平的、脆弱的和暫時的,還應(yīng)考慮到電力結(jié)構(gòu)、備用容量和電力建設(shè)周期等特征,在供需相對緩和的情況下,發(fā)展仍然是我國電力工業(yè)的首要任務(wù),每年都要保持一定的規(guī)模、速度和投資,避免電力發(fā)展。目前,我國人均用電水平仍然較低,適度超前發(fā)展依然是首要任務(wù)。2007~2010年,全社會用電量的年均增速在10%左右。 1.供需仍將繼續(xù)保持旺盛態(tài)勢,電力需要適度超前發(fā)展十一五期間,我國國民經(jīng)濟(jì)繼續(xù)持續(xù)較快發(fā)展,電力需求仍將繼續(xù)保持穩(wěn)定增長的態(tài)勢,電力工業(yè)將迎來更為廣闊的發(fā)展空間。廣東、江蘇、山東三省統(tǒng)調(diào)最高用電負(fù)荷突破3000萬千瓦;上海成為第一個統(tǒng)調(diào)最高用電負(fù)荷突破2000萬千瓦的直轄市;北京的統(tǒng)調(diào)最高用電負(fù)荷也已經(jīng)超過1200萬千瓦;蘇州和深圳成為統(tǒng)調(diào)用電負(fù)荷超過1000萬千瓦的地級城市。各電網(wǎng)最高用電負(fù)荷屢創(chuàng)新高。全國聯(lián)網(wǎng)格局初步形成,對促進(jìn)資源優(yōu)化配置起到了重要作用。到2006年年底,220千伏及以上輸電線路長度增長到28.64萬千米,年均增長10.99%;變電容量增長到96405萬千伏安,年均增長16.29%。4.電網(wǎng)不斷強(qiáng)化和完善電網(wǎng)規(guī)模不斷擴(kuò)大,區(qū)域、省電網(wǎng)主網(wǎng)架得到較大發(fā)展。五年中,水電裝機(jī)容量平穩(wěn)快速增長,年均增加1100萬~1300萬千瓦左右。到2006年年底,全國發(fā)電裝機(jī)容量達(dá)到6.24億千瓦,裝機(jī)容量和發(fā)電量已經(jīng)連續(xù)12年位列世界第二位。四年年均裝機(jī)增長15%,比改革開放以來年均增長率高6.41個百分點。2004~2006年,全國電網(wǎng)事故由196起下降為48起,設(shè)備事故由551起下降為238起,及時避免了可能出現(xiàn)的大面積、長期停電事故。為保證電力安全生產(chǎn)的持續(xù)穩(wěn)定,各電力企業(yè)在加強(qiáng)系統(tǒng)建設(shè)和設(shè)備管理、完善網(wǎng)廠協(xié)調(diào)機(jī)制、制定安全應(yīng)急預(yù)案和定期演練等方面做了大量扎實的工作,進(jìn)一步夯實了電力安全生產(chǎn)管理的基礎(chǔ)。2.電力安全穩(wěn)定運行水平不斷提高。 2004年,全國城市用戶由于缺電原因造成的停電時間平均達(dá)到9小時25分鐘;2005年下降為6小時55分鐘;2006年繼續(xù)降為18分鐘;今年上半年,只有6分鐘。其中,2003年,全國先后共有23個省級電網(wǎng)實施了拉閘限電;2004年,全國先后共有26個省級電網(wǎng)實施了拉閘限電。十六大以來,我國經(jīng)濟(jì)進(jìn)入新一輪增長周期。 又好又快發(fā)展為經(jīng)濟(jì)增長和社會進(jìn)步提供堅實保障 ●用不到三年的時間就扭轉(zhuǎn)了電力供應(yīng)緊張局面; ●保證了安全可靠供電,沒有發(fā)生特大電網(wǎng)事故和特大設(shè)備事故;●電力裝機(jī)實現(xiàn)了4億千瓦、5億千瓦、6億千瓦三次大的標(biāo)志性跨越;●電網(wǎng)不斷強(qiáng)化完善,各電網(wǎng)最高用電負(fù)荷屢創(chuàng)新高;●全國城鄉(xiāng)居民生活用電量不斷提高,呈現(xiàn)出新的態(tài)勢。中國電力行業(yè)五年發(fā)展成就輝煌十六大以來,電力行業(yè)在黨中央、國務(wù)院正確領(lǐng)導(dǎo)下,堅持以科學(xué)發(fā)展觀為指導(dǎo),積極應(yīng)對電力需求快速增長的挑戰(zhàn),搶抓發(fā)展歷史機(jī)遇,加快結(jié)構(gòu)調(diào)整步伐,深化電力體制改革,認(rèn)真履行社會責(zé)任,推進(jìn)和諧社會建設(shè),發(fā)展速度明顯加快,發(fā)展質(zhì)量明顯提高。 ● to adapt national economic development, advance the development of a moderate。 Suzhou EC calls and Shenzhen to bee electric load of more than 10 million kilowatts cities. Development Outlook Beijing39。s second breakthrough in a load of 100 million kilowatts of regional power grids, the North China Power Grid has also been a breakthrough load 100 million kilowatts. Guangdong, Jiangsu, Shandong provinces EC peak load transfer 30 million kilowatts a breakthrough。s power grid, and more than 220 kV line length of more than 100,000 km, which is equivalent to the founding of new China since the sum of the previous 45 years. The end of 2006, 220 kV and above transmission line length increased to million meters, the average annual growth rate of %。 biomass power generation to start, as at the end of 2006, the National has built a total of 80,000 kilowatts national demonstration projects generating units straw to fill the gaps in China39。 thermal power reached 484 million kilowatts of electricity supply more obvious role in protection。 to continue in 2006 reduced to 18 minutes。In 2004, National City customers as a result of power blackouts caused the average time for 9 hours and 25 minutes。 power enterprises has accelerated the pace of power construction, increase crossprovincial electricity trade, the demand for active side management measures, with less than three years to reverse the country39。s economy has entered a new round of growth cycle. Associated with this, the rapid growth of the national electricity demand, electricity supply shortages reemerged in 2003 in 2004, gradually developed into a nationwide, continuous power shortage situation. Among them, 2003, a total of 23 provincial power grids implemented。 ● continue to strengthen the power grid to improve the power system peak load record highs。 ● to ensure the safe and reliable power supply, there were no serious accidents and major power grid equipment accidents。 s power industry achievementsNational Congress, the power industry in the CPC Central Committee, under the correct leadership of the State Council, adhere to the guidance of scientific concept of development, and actively respond to the rapid growth of electricity demand challenges, seize the historical opportunity for development to accelerate the pace of structural adjustment and deepen the reform of electricity conscientiously fulfill their social responsibilities and promote the building of a harmonious society, the pace of development significantly accelerated the development of improved quality. Services to the party and the overall situation of the government work, economic and social development services, services of electricity customers the ability to further enhance and protect the economic and social development and people39。(5)熔斷器作用:在電路中作過載和短路保護(hù)作用。避雷器既可用來保護(hù)大氣過電壓,也可用來防護(hù)操作過電壓。(2)互感器作用:測量交流電路中的電壓和電流。不積跬步何以至千里,各位任課老師認(rèn)真負(fù)責(zé),在他們的悉心幫助和支持下,我能夠很好的掌握和運用專業(yè)識,并在設(shè)計中得以體現(xiàn),順利完成畢業(yè)論文參考文獻(xiàn)[1] 劉介才.《工廠供電》(第三版).北京:機(jī)械工業(yè)出版社, 117—119,150—160[2] 王士政.《電力工程類專題課程設(shè)計與畢業(yè)設(shè)計指導(dǎo)教程》.北京:中國水利水電出版社,2007 40—44[3] 劉介才.《工廠供電設(shè)計指導(dǎo)》.北京:機(jī)械工業(yè)出版社,1999 8—21,112—131[4] 王榮藩.《工廠供電設(shè)計與實驗》.天津:天津大學(xué)出版社,2002 84—97 [5] 吳靚.《發(fā)電廠及變電站電氣設(shè)備》.北京:中國水利水電出版社, 91—114[6] 杜文學(xué).《電力工程》.北京:中國電力出版社,2006[7] 焦留成.《實用供配電技術(shù)手冊》.北京:機(jī)械工業(yè)出版社,[8] 劉介才.《工廠供電簡明技術(shù)手冊》.北京:機(jī)械工業(yè)出版社,1993[9] 劉介才.《供電工程師手冊》.北京:機(jī)械工業(yè)出版社,1998[10] 國家標(biāo)準(zhǔn)GB 50053—94,:中國計劃出版社,1994[11] 國家標(biāo)準(zhǔn)GB 6988—86,:中國標(biāo)準(zhǔn)出版社,1987[12] 金續(xù)曾.《實用電氣控制線路圖冊》(第二版).北京:中國電力出版社,1999[13] 朱英浩.《新編變壓器實用技術(shù)問答》.沈陽:遼寧科學(xué)技術(shù)出版社,1999[14] 張朝英.《供電技術(shù)》.北京:機(jī)械工業(yè)出版社,2005 20—55[15] 王曉麗.《供配電系統(tǒng)》.北京:機(jī)械工業(yè)出版社,2004 99—253[16] 蘇文成. 《工廠供電》.北京:機(jī)械工業(yè)出版社,2003 45—80附 錄附錄Ⅰ部分電氣元件的功能附錄Ⅱ車間負(fù)荷表附錄Ⅲ側(cè)一次設(shè)備的選擇校驗表 (1)斷路器作用:正常情況下接通和斷開高壓電路中的空載及負(fù)荷電流。本次設(shè)計在老師的指導(dǎo)下就要結(jié)束了,對我來說,這不僅僅是對我所學(xué)過的知識的一次考察和整理,而且是對我們即將走向社會的所有畢業(yè)生的一次考驗,那就是是否能夠做到學(xué)以致用。在以后的日子里,隨著設(shè)計的不斷深入,我的知識面不斷的擴(kuò)展,認(rèn)識問題的方法與方式也在逐步的成熟。面對題目時,我無從下手。本設(shè)計中還有許多不足之處需要修改,如:變壓器主接線在實際中是否采用設(shè)計中的接線方法,主要電氣設(shè)備選擇及校驗是否還有其它更好更實用的校驗方法等,都需要繼續(xù)查閱相關(guān)資料并和老師溝通!謝 辭通過本次畢業(yè)設(shè)計,我受益非淺。在這次設(shè)計過程中用需要系數(shù)法進(jìn)行負(fù)荷計算,進(jìn)行了無功補(bǔ)償、變壓器選擇、主接線設(shè)計、短路計算、主要電氣設(shè)備的選擇和校驗(包括電壓互感器、電流互感器、斷路器、高壓熔斷器)以及防雷設(shè)計。為了避免這種情況發(fā)生,被保護(hù)物體與避雷針間在空氣中以及地下接地裝置間應(yīng)有足夠的距離。如果這一距離不夠大,則有可能在它們之間發(fā)生放電,這種現(xiàn)象稱避雷針(線)對電氣設(shè)備的反擊或閃絡(luò)。裝設(shè)避雷針(線)應(yīng)該使變電所的所有設(shè)備和建筑物處于保護(hù)范圍內(nèi)。對雷電侵入波的防護(hù)的主要措施是閥式避雷器限制過電壓幅值,同時輔之以相應(yīng)措施,以限制流過閥式避雷器的雷電流和降低侵入波的陡度[10]。變電所的雷害事故來自兩個方面:一是雷直擊變電所,二是雷擊輸電線路產(chǎn)生的雷電波沿線路侵入變電所。一些重要設(shè)備如變壓器等,多半不是自恢復(fù)絕緣,其內(nèi)部絕緣如故發(fā)生閃絡(luò),就會損壞設(shè)備。由第4章算出的電壓和電流, 側(cè)避雷器選, 側(cè)避雷器選型。 校核陡波沖擊電流下的殘波避雷器應(yīng)滿足截斷雷電沖擊耐受峰值電壓的配合:式中 避雷器陡波沖擊電流下的殘壓(峰值),單位為kV; 變壓器類設(shè)備內(nèi)絕緣截斷雷電沖擊耐受電壓(峰值),單位為kV; 各類設(shè)備額定雷電沖擊耐受電壓,單位為kV; 雷電沖擊絕緣配合系數(shù),取。 按標(biāo)稱放電電流選擇10kV配電設(shè)備過電壓保護(hù)選用的氧化鋅標(biāo)稱放電電流一般選擇5A;35kV的一般選用5kA、10kA;110kV的一般選用5kA、10kA;220kV的一般選用10kA。 按雷電沖擊殘壓選