【正文】
第 :給水管道的下列部位應(yīng)設(shè)置閥門(mén):①小區(qū)給水管道從城鎮(zhèn)給水管道的引入管段上:②小區(qū)室外環(huán)狀管網(wǎng)的節(jié)點(diǎn)處,應(yīng)按分隔要求設(shè)置;環(huán)狀管段過(guò)長(zhǎng)時(shí)宜設(shè)置分段閥門(mén);③從小區(qū)給水干管上接出的支管起端或接戶(hù)管起端;④入戶(hù)管、水表前和各分支立管;⑤室內(nèi)給水管道向住戶(hù)、公用衛(wèi)生間等接出的配水管起端;⑥水池(箱)、加壓泵房、加熱器、減壓閥、倒流防止器等處應(yīng)按安裝要求配置;第 :減壓閥的設(shè)置應(yīng)符合下列要求:①減壓閥的公稱(chēng)直徑宜與管道管徑一致;②減壓閥前應(yīng)設(shè)閥門(mén)和過(guò)濾器;需拆卸閥體才能檢修的減壓閥后,應(yīng)設(shè)管道伸縮器;檢修時(shí)閥后水會(huì)倒流時(shí),閥后應(yīng)設(shè)置閥門(mén);③減壓閥節(jié)點(diǎn)處的前后應(yīng)裝設(shè)壓力表;④比例減壓閥宜垂直安裝,可調(diào)式減壓閥宜水平安裝;④設(shè)置減壓閥的部位,應(yīng)便于管道過(guò)濾器的排污和減壓閥的檢修,地面宜有排水設(shè)施。第 :高層建筑生活給水系統(tǒng)應(yīng)豎向分區(qū),豎向分區(qū)應(yīng)符合:①各分區(qū)最低衛(wèi)生器具配水點(diǎn)處的靜水壓不宜大于 ,特殊情況下不宜大于 ;②水壓大于 (或配水橫管),宜設(shè)減壓或調(diào)壓設(shè)施;③各分區(qū)最不利配水點(diǎn)的水壓,應(yīng)滿(mǎn)足用水水壓要求。第 :建筑物內(nèi)的給水系統(tǒng)宜按下列要求確定:①應(yīng)利用室外給水管網(wǎng)的水壓直接供水。建筑內(nèi)部給水系統(tǒng)一般由引入管、給水管道、給水附件、給水設(shè)備、配水設(shè)施和計(jì)量?jī)x表共同構(gòu)成。(5)電源為雙電源 主要設(shè)計(jì)文獻(xiàn)[1].太原工業(yè)大學(xué)等編 《建筑給水排水工程》(第五版),中國(guó)建筑工業(yè)出版社,;[2].楊文玲主編 《高層建筑給水排水工程》,重慶大學(xué)出版社,1996 年;[3].張智等主編 《給水排水工程專(zhuān)業(yè)畢業(yè)設(shè)計(jì)指南》,中國(guó)水利電力出版社,2022重慶大學(xué)本科學(xué)生畢業(yè)設(shè)計(jì)(論文)12年 3 月;[4].耀宗等主編 《建筑給水排水設(shè)計(jì)手冊(cè)》,中國(guó)建筑工業(yè)出版社,1992 年;[5].姜文源主編 《建筑滅火設(shè)計(jì)手冊(cè)》,中國(guó)建筑工業(yè)出版社,1997 年;[6].核工業(yè)部第二研究設(shè)計(jì)院主編《給水排水設(shè)計(jì)手冊(cè)》第 11 冊(cè),中國(guó)建筑工業(yè)出版社,2022 年;[7].《全國(guó)通用給水排水標(biāo)準(zhǔn)圖集》,S1,S2,S3;[8].《建筑給水排水設(shè)計(jì)規(guī)范》(GB500152022),中國(guó)計(jì)劃出版社;[9].《高層民用建筑設(shè)計(jì)防火規(guī)范》(GB5004595),2022 年版,中國(guó)計(jì)劃出版社;[10].《建筑設(shè)計(jì)防火規(guī)范》(GB500162022),中國(guó)計(jì)劃出版社。給水要求安全可靠。熱水要求全天供應(yīng),熱水系統(tǒng)最不利點(diǎn)設(shè)計(jì)水溫不低于 50℃。該部分由動(dòng)力專(zhuān)業(yè)設(shè)計(jì)。(3)熱源本地區(qū)無(wú)城市熱力管網(wǎng),加熱方式由設(shè)計(jì)確定。要求生活污水經(jīng)無(wú)害化處理后排入市政排水溝,生活廢水直接排入市政排水溝。城市給水管網(wǎng)不允許直接抽水。 城市給水排水設(shè)計(jì)資料(1)給水水源建筑以城市給水管網(wǎng)為水源,在大樓北面、東面及西面道路上有給水管道通過(guò),其公稱(chēng)直徑為 300 mm,管中心標(biāo)高比地面低 ,城市給水管網(wǎng)常年可保證的資用水頭為 45mH2O。餐 廳 每 日 就 餐 人 數(shù) 為 1500 人 次 , 整 幢 大 樓 工 作 人 員 共 有 200 人 。 每 套 客 房 均 有 衛(wèi) 生 間 , 設(shè) 蹲 式 大 便 器 、 洗 臉 盆 、 浴盆 及 淋 浴 器 各 一 件 。1~3 層均有公共衛(wèi)生間,內(nèi)設(shè)蹲式大便器、洗臉盆、污水盆等;4~12 層為商務(wù)客房(標(biāo)間),共 180 套;13層設(shè)有商務(wù)餐廳、客房、小會(huì)議室及閱覽室,其中 9 套標(biāo)間,2 套二套房;14 層客房設(shè)有單間 7 套,二套房 4 套,四套房 1 套;15 層客房設(shè)有 8 個(gè)單間,二套房設(shè)計(jì)資料114 套,三套房 1 套;16 層設(shè)有二套房 4 套,標(biāo)間 1 套,豪華套房 1 套。3層為廚房、多功能廳及棋牌室等。底層為大堂、總服務(wù)臺(tái)、商場(chǎng)、餐廳及廚房等。 設(shè)計(jì)資料 建筑設(shè)計(jì)資料洪林賓館建于重慶市,是集賓館、商貿(mào)、娛樂(lè)等為一體的綜合大樓。其中手繪圖不得少于 2 張,其他采用計(jì)算機(jī) CAD 繪制。設(shè)計(jì)應(yīng)符合國(guó)家現(xiàn)行規(guī)范的規(guī)定。即室內(nèi)外給水及消防給水工程設(shè)計(jì),室內(nèi)外排水工程,室內(nèi)熱水及開(kāi)水供應(yīng)。地下 1層,地上 16層。 由于本次設(shè)計(jì)時(shí)間緊、任務(wù)重,成果中存在的不足與紕漏之處,懇請(qǐng)各位老師給予批評(píng)斧正。通過(guò)畢業(yè)設(shè)計(jì)我了解了建筑給水排水方案比較原則和方法,掌握冷水、熱水、消防給水、排水的計(jì)算方法以及設(shè)計(jì)說(shuō)明書(shū)的編寫(xiě)和施工圖設(shè)計(jì)與繪制方法。通過(guò)本課題的設(shè)計(jì)實(shí)踐,訓(xùn)練學(xué)生綜合應(yīng)用所學(xué)基礎(chǔ)課、技術(shù)基礎(chǔ)課和專(zhuān)業(yè)課理論知識(shí)的能力,熟悉和了解建筑給排水工程的一般設(shè)計(jì)原則、步驟與方法,了解建筑給水排水方案比較的原則和方法,培養(yǎng)學(xué)生獨(dú)立分析和解決工程實(shí)際問(wèn)題的能力,使其在踏上專(zhuān)業(yè)崗位前提前接受工程師的基本訓(xùn)練。畢業(yè)設(shè)計(jì)是實(shí)現(xiàn)高等工科院校培養(yǎng)目標(biāo)不可缺少的教學(xué)環(huán)節(jié),是教學(xué)計(jì)劃中的有機(jī)組成部分,是培養(yǎng)學(xué)生綜合運(yùn)用所學(xué)基礎(chǔ)理論、基本知識(shí)和技能,解決實(shí)際問(wèn)題的重要環(huán)節(jié),它是對(duì)學(xué)生四年學(xué)習(xí)的綜合演練。作為建筑給排水設(shè)計(jì)人員,應(yīng)本著技術(shù)、安全、美觀、實(shí)用、經(jīng)濟(jì)的原則,在實(shí)踐中努力創(chuàng)新,尋求最佳的設(shè)計(jì)方案,適應(yīng)建筑設(shè)計(jì)發(fā)展的新要求,滿(mǎn)足人民群眾不斷提高的物質(zhì)文化和生活要求。給排水設(shè)計(jì)的好壞不但直接影響到整個(gè)給排水系統(tǒng)施工的質(zhì)量,而且關(guān)系著建筑整體的質(zhì)量和安全。 4to 16 floor are high zones, supplied by pond ,pumps and perch water tank as a downfeed system. The consist of the total system are: inlet pipe, water meter node, water supply work, underground water reservoir, domestic feed water pump and perch water tank, etc. 1. Cold water system, mostly including the interior and exterior supply of cool (2)Hot water system: including water distribution system and the return water system, due to the low of the hot water demand is not large, so only in high area 4 ~ 16F, supply hot water.(3)Fire water supply system: including the interior and exterior fire hydrant system and automatic sprinkler system. The interior fire hydrant system is consist of hydraulic giant, water hose, fire plug, fire hose reel, firefighting pipe, fire reservior, fire pump and fire water tank, etc. The design adopts wet automatic sprinkler systems which includes sprinkler head, wet alarm valve, signal valve, pipe system and other water supply facility. (4)Gas extinguishing system: fixed in switch board room and diesel generator shelter. (5)Drainge system: including interior and exterior drainge system of sewage, waste water and storm water. Inorder to lighten the processing quantity of local sewage treatment structure, the project adopts bined system, After treatment, discharged to municipal sewage pipe. The system contains sanitary ware, drainage pipe, inspection 重慶大學(xué)本科學(xué)生畢業(yè)設(shè)計(jì)(論文)IIport, cleanout, interior and exterior sewage pipe sump, drainage pump, inspection, septic tank, etc. Besides, the engineering uses both indoor and outdoor rainwater system.Keywords:Tall Building with Multifunction, Water supply system,Hot water supply system,Water supply system of fire fighting, Drainge system設(shè)計(jì)資料III目 錄摘 要 ....................................................................................................................IABSTRACT .................................................................................................................III引 言 .....................................................................................................................11第一篇 設(shè)計(jì)任務(wù)及設(shè)計(jì)資料 ............................................................................12 ..............................................................................................................12 ..............................................................................................................12 ..............................................................................................................12 設(shè)計(jì)資料 ..............................................................................................................12 建筑設(shè)計(jì)資料 ...............................................................................................12 城市給水排水設(shè)計(jì)資料 ...............................................................................13 主要設(shè)計(jì)文獻(xiàn) ......................................................................................................13第二篇 設(shè)計(jì)說(shuō)明書(shū) .................................................................................................151 . 給水系統(tǒng)設(shè)計(jì) ....................................................................................................15 室內(nèi)給水系統(tǒng)的選擇 ..........................................................................................15 室內(nèi)給水系統(tǒng)供水方式技術(shù)比較 ..............................................................16 方案比選 .....................................................................................................18 設(shè)計(jì)方案比較結(jié)論 .....................................................................................20