freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

焦化廢水處理畢業(yè)設(shè)計(jì)(參考版)

2025-06-24 23:04本頁面
  

【正文】 denswil, 100m far from the bank of the Lake of Zurich. Fig. 4shows the flow diagram. Wwtp Rietliau was missioned in November 2005. The treatment process is subdivided into two lines. Each, the MBR line and the conventional process line, treat half of the ining Wastewater. Sludge of both treatment lines is not mixed. All wastewater is treated by the existing mechanical pretreatment units (screen, grit chamber and grease trap, ). In addition, the inflow from the primary sedimentation to the MBR line is led through a sieve consisting of hole geometry with 1 mm gap size. The MBR line consists of two sublines. Aerobic and anoxic volumes of the MBR process are dimensioned the way, that in times of maximum inflow the minimum HRT within the biological zone prior to the filtration chambers does not fall below 30min. Better effluent quality concerning the conventional process line also is achieved caused by the less hydraulic load of the secondary clarifiers. Thus, the requirements that have to be met by the mixture of both effluent streams can be guaranteed.5. ConclusionsThe presented upgrading concepts raise no claim to pleteness and thus reveal the wide spectrum of supposable measures. Many of them are under investigation and appropriate findings can be expected to be reported soon. However, the chosen upgrading concept must meet the claim to be?demandoriented according the wastewater sided requirements and the load situation,?economical in view of annual costs (operating expenses and net debt service). Besides, various other, not only processrelated, but also nonmonetary and monetary hardly assessable aspects are to be followed and to weigh in each individual case which do not admit a standard。/a. Fig. 3 illustrates the flow diagram.The mechanical pretreatment is pletely renewed consisting of three units: screening (gap size 6 mm), aerated grit chamber and grease trap,sieving (mesh geometry, gap size 1 mm). The existing oxidation ditch furthermore will be used as activated sludge volume. SRT should amount about 25 d, MLSS concentration is dimensioned with only 8 kg/m179。 [2,3] pared with conventional MBR operating circumstances. If such a draught can be realised, the usual disadvantages (sensibility pared to impact load, reduced alpha value) could be overe by MBR process to a great extent. Beside the anyway raised effluent quality other advantages of this upgrading concept can be named:considerable biological reserve capacities for future extension。 to 15 kg/m179。 Upgrading。 感謝同學(xué)們及室友在畢業(yè)論文設(shè)計(jì)過程對(duì)我的幫助,讓我這次完成的順利。在這里感謝我的導(dǎo)師彭新晶老師,感謝您一直以來對(duì)我的教誨與幫助,教會(huì)我很多知識(shí)。 李成平,SBR用于焦化廢水生物處理的試驗(yàn)研究, 環(huán)境廢染治理技術(shù)與設(shè)備, 2005,06[18]孫德智. 環(huán)境工程中的高級(jí)氧化技術(shù)[M]. 北京: 化學(xué)工業(yè)出版社,2002. 277 致謝 時(shí)間飛逝,大學(xué)四年的時(shí)光即將結(jié)束,是校園生活的終點(diǎn)也是人生中又一個(gè)起點(diǎn)。[4]李亞新. 活性污泥法理論與技術(shù). 中國建筑工業(yè)出版社. 2007年8月[5]水污染控制工程. 高廷耀 顧國維 周琪主編 1999[6]錢易, 米有詳主編. 現(xiàn)代廢水處理新技術(shù). 北京: 中國科技出版社, 1993 [7]繆應(yīng)祺,水污染控制工程(M),南京東南大學(xué)出版社,;[8]肖文濤 .污水生物脫氮除磷工藝的現(xiàn)狀與發(fā)展[A]. 中國期刊全文數(shù)據(jù)庫 ,2010.[9]郝曉地. 歐洲城市污水處理技術(shù)新概念——可持續(xù)生物除磷脫氮工藝(上) [J ] . 給水排水,2002.[10]劉俊峰, 易平貴. 過濾一樹脂吸附法處理焦化廢水的研究[J]. 煤化工, 2002, 100(3): 5962[11]黃念東, 夏暢斌. 細(xì)粒焦渣對(duì)廢水中酚的吸附研究[J]. 湘潭礦業(yè)學(xué)院學(xué)報(bào), 2000, 15 (2): 6366[12]劉翠華, 何選明. 絮凝劑在焦化廢水再凈化中的用[J]. 武漢冶金科技大學(xué)學(xué)報(bào), 1999, 22(1): 4245[13]王春敏,李亞峰,周紅星,陳健,王維軍,Fenton混凝法應(yīng)處理焦化廢水的試驗(yàn)研究,環(huán)境廢染治理技術(shù)與設(shè)備,2006,03[14]徐向陽, [J].浙江大學(xué)學(xué)報(bào)(農(nóng)業(yè)與生命科學(xué)版), 2000, 26 (3): 241246[15]賈鵬 牛繼勇 李君敏 A/O2工藝處理焦化廢水,054027[16]李莉, 張寶會(huì)等. SBR工藝處理焦化廢水存在的問題及改進(jìn)措施[J]. , 2: 5354[17]陳雪松。所以,我們還應(yīng)繼續(xù)努力研究對(duì)焦化廢水的處理,力求找到更高效的處理方法。本設(shè)計(jì)通過選用A/O工藝有效的去除水中的氮磷,揮發(fā)酚,有機(jī)物及有毒有害的物質(zhì),使廢水的排放達(dá)到排放標(biāo)準(zhǔn)。焦化廢水是有毒難降解的有機(jī)廢水,若未經(jīng)處理而直接排放會(huì)對(duì)環(huán)境造成很大影響及危害。人工費(fèi):每人每月2000元?jiǎng)t每天需400元。運(yùn)行費(fèi)用包括電費(fèi),人工費(fèi),藥劑費(fèi)及維修費(fèi)。因?yàn)閺S內(nèi)大部分都是自動(dòng)化,所以所需勞動(dòng)力少,大概需要六人,包括配電室,泵房,機(jī)修車間,技術(shù)員,化驗(yàn)員,車間各一人。1000=缺氧池池的高度為6m,=二沉池到反應(yīng)池的距離為12m,則通過二沉池的水力損失為h=12247。1000=調(diào)節(jié)池的高度為4m,所以調(diào)節(jié)池的標(biāo)高為h==事故池到缺氧池的距離取10m,則通事故池的水力損失為h=10247。1000=,通過提升泵房把焦化廢水提升到離地面5m的高度,=隔油池到調(diào)節(jié)池的距離取18m,則通過隔油池的水力損失為h=18247。1000=,所以過細(xì)格柵的標(biāo)高為—=—。減少污泥量的抽動(dòng),關(guān)注污泥水流入干管以及其他構(gòu)筑物的可能。還要考慮不要挖太深,以避免施工困難。2  計(jì)算水頭損失,通常選用最近最大流量(或泵最大流量)作為一種結(jié)構(gòu)和管道的設(shè)計(jì)流量;當(dāng)與遠(yuǎn)期流量有關(guān)時(shí),要按遠(yuǎn)期計(jì)算。2  廢水流經(jīng)量水設(shè)備的水頭損失。減少運(yùn)作費(fèi)用以及維修管理,需考慮重力流。廢水處理廠廢水處理流程高程布置的主要任務(wù)是:計(jì)算構(gòu)筑物和泵房的高度,明確連接構(gòu)筑物的灌渠尺寸,高度以及水位高度。2  廢水中最高水位為起點(diǎn),沿逆廢水方向向上計(jì)算。在高程布置上,以處置以后的廢水可以順利排放為前提,讓進(jìn)水泵房揚(yáng)程最小,減少費(fèi)用。倉庫位于處理廠的正南方,全廠的行政管理中心辦公樓則位于廠區(qū)的南側(cè), 表52 附屬構(gòu)筑物構(gòu)筑物名稱數(shù)量平面尺寸(m)綜合辦公樓1105食堂154澡堂154休息室148化驗(yàn)室1105維修工具間185倉庫185變電間158門衛(wèi)133根據(jù)當(dāng)?shù)氐牡乩項(xiàng)l件,進(jìn)出水方向等合理布局。 廢水處理廠平面布置本廢水處理廠包括:配電室、鼓風(fēng)機(jī)室、化驗(yàn)室、綜合辦公樓、食堂、浴室、倉庫、加藥間、維修工具間、各泵房、隔油池、氣浮間、調(diào)節(jié)池、生化反應(yīng)池、二沉池、混凝沉淀池、污泥濃縮池等。水區(qū)布置: 選用“一”型布置,這樣可以節(jié)省占地面積,同時(shí)對(duì)輔助構(gòu)筑物的布置比較好。廠子的前區(qū)布局:力求營造一個(gè)舒適、安全、便利的條件,以方便員工的活動(dòng),包括食堂,車庫等。安排位置時(shí)要符合方便,安全的要求。它們是必須有的一部分,具體面積大小依據(jù)實(shí)際情況而定。圍墻選用花池式樣。每棟大樓的外圍設(shè)置道路。(4)廠區(qū)道路以及圍墻設(shè)計(jì)為方便交通和設(shè)備的安裝和維護(hù),主路面積8米,寬6米,其他為3到4米之間,道路轉(zhuǎn)彎半徑一般為6米以上。沖洗構(gòu)筑物的水經(jīng)深度處理排出。3  雨水管道為避免產(chǎn)生積水,影響生產(chǎn),在廠區(qū)設(shè)雨水排放管,廠區(qū)雨水直接排至水渠。 2  污泥管道主要包括二沉池,混凝沉淀池,集泥井等出泥管。(2)管,渠的平面布置 里面有廢水管,污泥管,雨水管還有供水管等,主要如下:1  廢水管道 連接各個(gè)處理廢水的設(shè)備所用的管道在安排上要符合線路短,埋的深的要求。廠區(qū)內(nèi)設(shè)計(jì)不僅要考慮以上幾點(diǎn),還要參考當(dāng)?shù)刂饕L(fēng)向,進(jìn)水方向,工藝流程的需要以及當(dāng)?shù)氐刭|(zhì)條件等因素合理安排。7  內(nèi)部綠化面積要大于30%,整體設(shè)計(jì)要符合消防標(biāo)準(zhǔn)。5  變配電間要安插在電負(fù)荷大的構(gòu)筑物及廢水廠附近,減少損耗。3  要設(shè)定長短期計(jì)劃,方便規(guī)劃管理。要考慮以下幾點(diǎn):1  各個(gè)部分劃分明確,管理,廢水處理,污泥處理都相對(duì)獨(dú)立。污泥脫水機(jī)及攪拌機(jī)選型,選擇LXDCP—2型螺壓脫水機(jī),其性能為:混合反應(yīng)池采用ZJ470型折板漿式攪拌機(jī),H=1100mm。聚丙烯酰胺(PAM):選擇HJY100這種加藥裝置,配套裝置隔膜計(jì)量泵為:Q=1,H=40m,N=。PFS:選擇HJY100這種加藥裝置,配套裝置隔膜計(jì)量泵為:Q=1 ,N=。 第四章 設(shè)備選型根據(jù)本工程的水質(zhì),水量,選取人工格柵。=污泥濃縮池總高:H=h+h+h+h=2+++=濃縮后污泥量計(jì)算:濃縮池后剩余污泥流量:Q= Q(1-)/(1-)= (1-99%)/(1-97%)= 脫水后污泥餅含水率:P=80%尺寸 R=3m H=脫水后污泥餅量:Q= Q(1-p)/(1-p)= (1-)/(1-)=在二沉池與好氧池之間設(shè)置1個(gè)回流水井,二沉池回流的上清液流至這里,再由提升泵送至缺氧池。C/M=5/30=濃縮池直徑:D=S/==3m工作部分高度:h=TQ/24S=8(24)=2m超高:h=緩沖層高:h=圓截錐部分尺寸:設(shè)圓截錐下底直徑為1m則其高度為:h=(R-r)tan50176。污泥量:混凝污泥按生化水量的3%:p=99%污泥量:Q=污泥總量:Q總=9+= m/d設(shè)計(jì)參數(shù):污泥池固體通量M=30kg/m/2=混凝沉淀池總高:H=h+h+h+h=+++=混凝沉淀池尺寸R= H= 污泥濃縮池濃縮池將對(duì)混凝沉淀池污泥以及二沉池剩余污泥進(jìn)行進(jìn)一步的濃縮。h,停留時(shí)間1h。混凝沉淀池采用豎流式沉淀池,中間進(jìn)水周邊出水堰出水,設(shè)一座沉淀池。池容:V=Qt/S=15/60=池長為2m,。攪拌勻稱之后到混凝沉淀池進(jìn)行混凝沉淀,混合池池底設(shè)置ZJ470型折板漿式攪拌機(jī)一臺(tái),使廢水勻稱攪拌。四臺(tái)污泥泵。沉淀池總高度:式中: 該池采用鋼混結(jié)構(gòu),池壁為鋼筋混凝土,混凝土厚度250mm,I、II級(jí)鋼筋現(xiàn)澆,C30混凝土,池壁采用C25防水混凝土,抗?jié)B標(biāo)號(hào)S6。加藥量:G
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1