freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

涉外項(xiàng)目電纜橋架安裝施工方案培訓(xùn)資料(參考版)

2025-05-18 01:42本頁面
  

【正文】 Scaffold twist and fall down.3.高空墜落people falls from high4.高空落物,材料滑落,安全帽跌落,腳手架桿滑落,卡扣跌落objects fall from high such as material, helmet, scaffold pipes and clamps.5.桿傾倒 standards are not straight, incline.6.每天進(jìn)到工廠施工點(diǎn)是否有自檢。All working staff should not the emergency procedures and excavation route.4.所有在B204施工人員不得攜帶手機(jī)等電子產(chǎn)品關(guān)閉。interview the workers and hold the technical meetings before starting the work making sure they all know the potential hazards and precautionsSafety educates the workers before starting work.2.在作業(yè)過程中不要動運(yùn)行中的管線,有滴水的地方切勿靠近,以防有害液體。Prior to lifting, check lifting tool and machinery for safety, including abrasive cutting machine, grinding machine ,electric drill, electric hammer, chain block, lifting belt, abrasion, damage, defect and obsolescence, to make sure all tools satisfy safety requirements2.對人員進(jìn)行審核,作業(yè)前對所進(jìn)行的工作進(jìn)行工作技術(shù)交底before starting confirm the qualification of the workers and hold technical meeting1.人員操作不正當(dāng)造成設(shè)備工機(jī)具損傷或人員傷害causing injuries and damages to the equipments by bad operation2.在管廊上作業(yè)時施工人員磕碰運(yùn)行的管線,造成停車或人員傷害When construction people work in the outside pipe rack, pipe and cable damaged by worker and cause injuries equipment not work.1.使用不合格的操作人員unqualified operators2.作業(yè)前沒有進(jìn)行技術(shù)交底,工作盲目造成安全事故Commencing the work without prework technical meeting causes accident.1.工作前對工人進(jìn)行審核,工作前對工作人員進(jìn)行技術(shù)交底。Checking electric power machine and tool, chain block, scaffold tube and clamp1.吊具損壞造成吊物墜落。安裝電纜橋架時需在管廊的鋼平臺上搭設(shè)工作平臺。 the access will be built on the east side of the axis of G36 in the attached diagram 8,see detail diagram as follow:附圖1:(attached diagram 1) 1(JHA)工作安全分析編號No.:工作名稱Work Description:電纜橋架預(yù)制、安裝及腳手架搭設(shè) Cable tray and support fabrication, installation and setting up scaffold 參與分析人員Attendee: 艾祿芳、章新華、宋建平、謝治中等分析日期Date: 審核人Reviewed by:批準(zhǔn)Approved by:必須采取的個人防護(hù)設(shè)備Necessary people protection equipment:1:安全帽Helmet 2:安全眼鏡Safety glass 3:工作鞋Work boot 4:工作手套Work glove 5;安全帶Harness 施工使用主要設(shè)備、工具M(jìn)ain equipments and tools using in construction吊裝帶 lifting belt, 扳子 spanner、腳手架管 scaffold tube, 卡扣 clamp, 跳板sleeper、砂輪切割機(jī)abrasive cutting machine 、磨光機(jī)grinding machine 、電鉆、electric drill 電錘、electric hammer防爆電氣設(shè)施 explosive proof electric appliance.主要工作描述:main job工作地點(diǎn):廠區(qū)的橋架施工,包括管廊橋架的施工、B204區(qū)域橋架施工、B252區(qū)域橋架施工及其它區(qū)域橋架施工。 After scaffold is established, thin wooden board will be applied under cable tray in order to protect existing cable tray and pipe. Please note that not allow people to walk on the scaffold which have been established as a access. G6~G10軸腳手架是從管廊上開始搭設(shè),搭設(shè)距地高度為+;橫向是與原管道鋼梁支架為底面在其上面搭設(shè),縱向固定在管廊的鋼梁上;搭設(shè)時先在管道鋼梁支架上墊上方木塊,再把預(yù)制好的架子管底板放在木板上,用鐵絲捆扎牢固,然后插入架子管,另一端通過架子管固定在鋼梁上; The scaffold which is + from ground is established on the outside pipe rack between at the axis of G6 and G10。 the horizontal tube be fixed on the existing steel partition board and vertical tube be fixed on the beam of pipe rack. when scaffold established on the steel partition board, the scaffold will be close to north side as possible as we can ,but not allow to touch existing cable tray, then wooden board will be put in the north side in order to separate existing cable tray。 precaution will be noted than not allow to hit and damage existing equipment, pipe and equipment when scaffold to be established. G9~G12軸腳手架是從管廊上開始搭設(shè),搭設(shè)距地高度+;橫向是與原鋼隔板為底面在其上面搭設(shè),縱向固定在管廊的鋼梁上,在鋼隔板上搭設(shè)的腳手架,架子管盡量靠北但不得觸及原有橋架,然后在靠近北面橋架一側(cè)的腳手架上鋪設(shè)木板與原有橋架隔離;通過鋼梁固定的架子管,在架子管與鋼梁間應(yīng)墊層木板,用鐵絲綁扎結(jié)實(shí);整個腳手架搭設(shè)完后,應(yīng)在安裝橋架的下方也鋪層薄木板,達(dá)到保護(hù)原有的橋架及管線,安裝完的橋架人不能在上面行走,不得把安裝完的橋架作為人行通道。在B204一期工程C軸~D軸間需搭設(shè)腳手架,腳手架操作平臺搭設(shè)區(qū)域見附圖7,樣式圖見附圖8;Cable tray will enter into room of B204 between axis c and d from No. bracket of pipe rack down to after finishing installation of outside pipe rack. The cable tray will be installed from to up inside B204 room, we will use exist steel beam as support and avoid to make hole on the wall of building. When electrical appliance to be used in construction, explosion proof equipment will be adopted and power cable will not touch any exist cable and pipe, fire proof cloth will be put under cable tray when installation. Scaffold have to be set up at axis CD in the B204 area of first term project , Operation platform position of scaffold see attached diagram7, pattern see attached diagram 8. 進(jìn)入B204一期生產(chǎn)區(qū)作業(yè)施工時,應(yīng)在施工區(qū)域內(nèi)拉上警戒線,并搭設(shè)防護(hù)欄;安裝橋架時,橋架應(yīng)從里往外安裝,以原預(yù)留的橋架連接;搬運(yùn)時首先把橋架放至+,并在原預(yù)留的支架上鋪上層防火布,然后沿著支架平拉至原預(yù)留橋架接口處,再取下墊著的防火布,固定橋架;在建筑屋內(nèi)施工采用移動式腳手架;When construction to be done in first term project area of B204, pull guard line and set up safety rail in construction area;when cable tray to be connected from inside room to outside room, method is from inside room to outside room in order to connect to existing cable tray。安裝時先沿著NO. ,再從G10軸線處爬至頂層,從G9軸線用直角彎敷設(shè)至NO. ,再降至NO. ;在吊裝前應(yīng)在需安裝橋架的上層橋架底處鋪設(shè)層薄木版,避免在吊裝及運(yùn)輸時損傷原宥電纜,并且在管廊上運(yùn)輸、安裝橋架過程中,施工人員必須帶好安全帶, 安全帶卡扣不得掛在管線、橋架、閥門等設(shè)備上。When construction made in the production area, power cable for temporary construction can not touch operation equipment and pipe. Leased clamp be used for hanging the temporary power cable and can not hang on the equipment and pipe. 在對有電纜在內(nèi)的橋架開槽時,應(yīng)把運(yùn)行電纜隔離開,嚴(yán)禁損壞一期原有電纜,采取的防護(hù)措施如下:在需切割的部位事先放上C形狀的薄鐵板,然后用防火布覆蓋,并且在橋架下方鋪設(shè)一層防火布,再用砂輪切割機(jī)切割,切割后清除毛刺,并打磨光滑;When we need to make duct in the cable tray with living cable, cable with electricity will be unplugged and not allowed to damage existing cable, measure will be taken as follow: the places we need to cut should put a pieces of C type thin steel plate in advance, then cover a piece of fire proof cloth on the steel plate and put fire proof cloth under cable tray at the same time, then we can cut hole with abrasive cutting machine , after cutting, remove burry and make it smooth. 從B196至B204廠房間的橋架都位于室外管廊上,且屬于高空作業(yè), 除了遵守相應(yīng)的高空作業(yè)規(guī)定外,霧天、雨天應(yīng)禁止在管廊上施工作業(yè);Some installation from B196 to B204 in the outside pipe rack is aloft work, except following relevant regulation of aloft work, it should be pro
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1