【正文】
各類運(yùn)輸車輛在施工區(qū)域通行時(shí),均需配備專門指揮人員。Avoid construction in rainy days. (If impossible to avoid, make preparation to protect from rain and discharge water in advance). 避免雨天施工,(若無法避免,應(yīng)提前做好防雨排水準(zhǔn)備);Rainy season construction, material requirements, strictly control the moisture content to prevent rain, to prepare the materials used shall be covered with plastic cloth, and some have good mixing lime soil finished for the day, it is strictly prohibited to use the night lime soil the next day. 雨季施工時(shí),材料要求嚴(yán)格控制含水率,防止雨淋,對于準(zhǔn)備使用的材料應(yīng)采用塑料布進(jìn)行覆蓋,已經(jīng)拌和好的灰土當(dāng)天用完,嚴(yán)禁過夜次日使用。Ingredients, mixing are under supervision by the site test lab technician, strictly control the proportion of the lime soil is not beyond the acceptance standard. Mix evenly with the same color. 配料、拌合由試化驗(yàn)員現(xiàn)場監(jiān)督,嚴(yán)格控制灰土的比例不超出驗(yàn)收標(biāo)準(zhǔn)。According to the size of the design elevation invisible in situ soft soil, in accordance with the relevant standards for selfchecking, after passing inspection, the supervision engineer to have the acceptance, before being lime soil embankment construction 按設(shè)計(jì)標(biāo)高尺寸挖除原地面軟質(zhì)土后,按照有關(guān)標(biāo)準(zhǔn)進(jìn)行自檢,合格后報(bào)監(jiān)理工程師檢查驗(yàn)收,驗(yàn)收合格后,方可進(jìn)行灰土填筑施工。 Bearing Capacity Test for the Lime Soil 灰土承載力檢測After the lime soil backfilling construction, there will be a bearing capacity test to see if it meet the requirement. If not, do the work again to reach the standard.灰土換填施工完畢后,應(yīng)進(jìn)行地基承載力檢測,達(dá)到設(shè)計(jì)要求規(guī)定的承載力為宜。Lime Soil Compacted灰土夯實(shí)The scope of soil lime backfilling of the two units’ foundation is 1m beyond the foundation. Since this is a relat