(1)在開(kāi)始裝運(yùn)月份前_________天,甲方應(yīng)以電報(bào)通知乙方當(dāng)月裝運(yùn)數(shù)量和裝貨船名,乙方應(yīng)在接到甲方上項(xiàng)電報(bào)通知_________天內(nèi)電復(fù)甲方。 二、品質(zhì)規(guī)格 甲方提供設(shè)備質(zhì)量、規(guī)格,有關(guān)技術(shù)資料,技術(shù)保證,圖紙,詳見(jiàn)合同附件。while the products provided by party a as a make up payment for the machinery supplied by party b shall be first priced in terms of rmb as orher similar exports at the time the contract is made and then the prices in rmb shall be turned into those in _________ above mentioned according to the current exchange rate at the time. article 5 interest rate party a shall pay the interest on its long term l/c and the down payment of party annual interest rate is agreed upon at _________%. article 6 technical service after arrival at the destination port,the machinery shall be assembled by party party a believes it is necessary ,party b shall send its technicians to provide onthespot instructions and other required technical assistance during the course of assembling. party b shall be liable for the losses incurred in the coures fo assembling as a result of technical default of its prat. after approval by both parties, party b shall send a group of technicians to china to faciliate the pletion of the project. the cost incurred in china shall be borne by party b. ar