【正文】
After lime soil backfilling, immediately construct the foundation and above ground structure, backfill the foundation pit to prevent wetness or cracks.灰土地基換填完工后,及時進行基礎(chǔ)及上部工程施工,回填基坑,防止受水浸濕或曬裂;七、 Safety measure安全措施1) Before construction, train relevant staff safety knowledge and have their technology disclosure and all above with signature confirmation. 施工前對相關(guān)施工人員進行安全技術(shù)交底,并全部簽字確認;2)Excavation ticket and hot work ticket should be managed in advance before site earth excavation and ;3)Constructors should wear PPE: Helmet, safety shoes, safety glasses and safety vest and so on. Provide other protective equipment for special type of work according to their work condition. 施工人員佩戴好安全帽、勞保鞋、安全眼鏡、反光背心等個人PPE,特殊工種需根據(jù)工作需要配備好其它防護用具;4)Crane and excavator and other relevant machinery should be qualified before put into practice and relevant operations and supervisors should have valid qualification documents. 挖掘機等相關(guān)機械使用前必須經(jīng)驗收合格,相關(guān)操作及指揮人員持有有效的資格證明文件;5)After one day construction, clean up those remaining materials and rubbish produced from the construction procedure. 當天施工完畢后,及時將剩余的材料及施工過程中產(chǎn)生的垃圾等清理干凈,做到工完場清;6) Project for construction area should be done before, and isolated with warning mark in full position. 進行開挖等作業(yè)時,必須提前規(guī)劃好施工區(qū)域,對施工區(qū)域進行隔離,并在醒目位置處懸掛警示標志;7) During construction procedure, arrange fulltime safety officers to monitor the whole work progress and prevent wrong action.施工過程中,安排專職安全員對施工過程進行全程監(jiān)控,杜絕違章操作。Keep the lime from moisture in the process of packaging,