freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

單體土方開挖及換填施工方案-wenkub.com

2025-04-19 23:10 本頁面
   

【正文】 After lime soil backfilling, immediately construct the foundation and above ground structure, backfill the foundation pit to prevent wetness or cracks.灰土地基換填完工后,及時進行基礎(chǔ)及上部工程施工,回填基坑,防止受水浸濕或曬裂;七、 Safety measure安全措施1) Before construction, train relevant staff safety knowledge and have their technology disclosure and all above with signature confirmation. 施工前對相關(guān)施工人員進行安全技術(shù)交底,并全部簽字確認;2)Excavation ticket and hot work ticket should be managed in advance before site earth excavation and ;3)Constructors should wear PPE: Helmet, safety shoes, safety glasses and safety vest and so on. Provide other protective equipment for special type of work according to their work condition. 施工人員佩戴好安全帽、勞保鞋、安全眼鏡、反光背心等個人PPE,特殊工種需根據(jù)工作需要配備好其它防護用具;4)Crane and excavator and other relevant machinery should be qualified before put into practice and relevant operations and supervisors should have valid qualification documents. 挖掘機等相關(guān)機械使用前必須經(jīng)驗收合格,相關(guān)操作及指揮人員持有有效的資格證明文件;5)After one day construction, clean up those remaining materials and rubbish produced from the construction procedure. 當天施工完畢后,及時將剩余的材料及施工過程中產(chǎn)生的垃圾等清理干凈,做到工完場清;6) Project for construction area should be done before, and isolated with warning mark in full position. 進行開挖等作業(yè)時,必須提前規(guī)劃好施工區(qū)域,對施工區(qū)域進行隔離,并在醒目位置處懸掛警示標志;7) During construction procedure, arrange fulltime safety officers to monitor the whole work progress and prevent wrong action.施工過程中,安排專職安全員對施工過程進行全程監(jiān)控,杜絕違章操作。Keep the lime from moisture in the process of packaging,
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1