【正文】
2022 Boeing. All rights reserved. NOTICE: NOT EXPORT CONTROLLED Industrial and Regional Benefits (IRBs) $12B Super Hor $4B CF18 $ CH147, ScanEagle Production, upgrades and 20 year InService Support in Canada $ CF18 Modernization $ CC177 172411 Boeing IRB programs deliver 100% Canadian Content Value (CCV) Completed Completed Onschedule Onschedule Copyright 169。 2022 Boeing. All rights reserved. NOTICE: NOT EXPORT CONTROLLED A Long History in Canada…. A Significant Presence ? Canada and Boeing have a long and beneficial IRB History: – CF18 Program (1995) US$ – CF18 Phase 1 Mod (2022) – US$378M (pleted 1 year ahead) – CF18 Phase 2 Mod (2022) – US$138M (pleted ~ 3 years ahead) ? Boeing’s $ in current IRB obligations are all on schedule – MHLH, C17, and SUAV ? Canadian Industry has gained high quality jobs from Boeing’s IRB programs – More than 90,000 man years of work over 25 years – Projects covering all 9 of Industry Canada’s Technology Sectors ? Canadian Industry and Boeing – Canada is Boeing’s second largest global supply base – Boeing currently spends over $1 billion in Canada yearly – More than 200 suppliers spanning each region supply 10 different Boeing platforms Promises Made, Promises Kept 172411 Copyright 169。 2022 Boeing. All rights reserved. NOTICE: NOT EXPORT CONTROLLED Industry Supplier Partner Integration ? Production – Use Best of Industry practices – Benchmarking and sharing of best practices – Increasing capability, while driving affordability ? Support – Integrated Logistics – InService Engineering (Ramp。 2022 Boeing. All rights reserved. NOTICE: NOT EXPORT CONTROLLED Operating Today Electronic Attack Replaces remaining F/A18Cs 2022 2022 2030 2020 2040 Attack/Air Superiority F/A18A/C EA6B Airborne Tanker S3B F14A/D Air Superiority/Strike Super Hor Replaces F35C EA18G F/A18E/F ? Combat proven, multirole fighter aircraft – Provides the full spectrum of tactical missions formerly flown by several aircraft – Operational flexibility to meet diverse mission requirements ? Key element of . Navy force structure beyond 2