freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

國際工程管理作業(yè)(資格預審)-資料下載頁

2025-08-17 09:20本頁面
  

【正文】 projects of a similar magnitude and similar ground? conditions to that of the Work. A list of relevant projects pleted in the past five (5) years shall be presented with the proposal. The list shall incorporate:? Descriptions of the Projects including location and key statistics (. shaft diameter, shaft depth , linear meters of development etc)? Short description of manpower, equipment, and methods used in each project.? Nominal value in US Dollars? Overall schedule achieved? Description of major successes or failures for each project? Project safety records (including manhours worked, number of first aid incidents, number of medical aid incidents, number of losttime accidents, number of fatal accidents (and short description of accident) for each project listed).? Project contact references including name, title, address, telephone number, telefax number and address (if available)? HEALTH AND SAFETY PROGRAM amp。 RECORD? The Contractor shall supply a copy of his standard safety program with the Proposal as well as a summary of the pany’s accident history over the past five (5) years. If the pany is involved in several distinct areas of work, the relevant statistics for the division responsible for shaft sinking and mine development are to be used.? Safety Statistics? 1998 1999 2000 2001 2002? A Hours Worked? B Fatal Accidents? C Total Accidents? D Accidents with Lost Time? E Lost Days? F Lost Time Frequency? G – Severity? H – Compensation Costs? Contractor’s Safety Program:? KEY MANAGEMENT AND FIELD SUPERVISION PERSONNEL? The Contractor shall submit an organization chart for the Work which identifies key personnel and the responsibilities. Resumes of key personnel shall be submitted with the organizational chart.? The proposal shall identify the location of the Contractor’s administration and engineering offices for the Work.? In the event that the Contractor would form a Joint Venture for this project, a list of key personnel from all panies involved in the Joint Venture shall be submitted for the Owner’s review.
點擊復制文檔內(nèi)容
語文相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1