【正文】
ame location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poorquality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials sha