freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

墻體模板安裝施工方案-資料下載頁

2025-04-25 00:56本頁面
  

【正文】 rs drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring ponent leads. blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, pared with the original values confirm the location. lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a pushpull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed . To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
點擊復制文檔內容
公司管理相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1