【正文】
作出終止執(zhí)行相關(guān)應急預案的決定,宣布應急狀態(tài)解除。8附件某水庫及下游重要防洪工程和重要保護目標位置圖;水庫樞紐平面布置圖;水庫樞紐主要建筑物剖面;水庫水位庫容面積泄量關(guān)系曲線圖水庫洪水風險圖水庫工程技術(shù)特性表水庫下游主要河段安全泄量、相應洪水頻率和水位表水庫險情及搶險情況報告表(2) draw a purge system, confirmed by the supervising principal。 (3) the purging of temporary pipe installation, required support and reinforcement, purge outlet setting a fixed bracket, easy to check。 (4) at the purging outlet cordon, by the person responsible for supervision。 (5) set up a special panel of steam pipe blowing will be attended by a unified mand, assigning their tasks。 (6) steam blowing the steps are as follows: a. open the trap, vent and drain valve。 B. should warmup before purging。 C. check the expansion joints, thermal displacement of the spring hanger and pipe。 D. used to purge the vapor temperature should not exceed the tubing operating temperature。 E. purge steam should be heated → cool → reheating in the order。 F. purge lines should be a blow out after blowing the next。 G. purge purging of the target of export place polishing the quality of checks, no rust, debris on the targets for qualifying. (7) the washing, sweeping, the qualified (confirmed by the Commissioner and owners) after the pipeline, should recover, recovery procedures with the dismantling steps instead, and blanks are removed, should be put on the official gasket, once the recovery is plete, confirmed by the supervision of site, fill out the purge, rinse records. 2. static equipment installation programme installation program setup for static equipment for static equipment, see below. the construction preparation all personnel should be familiar with equipment installation and technical information, including equipment manufacture and Assembly diagrams and ponent diagrams, equipment installation documentation, special tools, manuals, packing list and process installations, equipment certification, the constructionaaBypass, wash downstream parts of the pipeline. (5) take exit of the flushing line with glasses of water, check whether the water color and23