【正文】
季施工時(shí),材料要求嚴(yán)格控制含水率,防止雨淋,對(duì)于準(zhǔn)備使用的材料應(yīng)采用塑料布進(jìn)行覆蓋,已經(jīng)拌和好的灰土當(dāng)天用完,嚴(yán)禁過(guò)夜次日使用。After lime soil backfilling, immediately construct the foundation and above ground structure, backfill the foundation pit to prevent wetness or cracks.灰土地基換填完工后,及時(shí)進(jìn)行基礎(chǔ)及上部工程施工,回填基坑,防止受水浸濕或曬裂;七、 Safety measure安全措施1) Before construction, train relevant staff safety knowledge and have their technology disclosure and all above with signature confirmation. 施工前對(duì)相關(guān)施工人員進(jìn)行安全技術(shù)交底,并全部簽字確認(rèn);2)Excavation ticket and hot work ticket should be managed in advance before site earth excavation and ;3)Constructors should wear PPE: Helmet, safety shoes, safety glasses and safety vest and so on. Provide other protective equipment for special type of work according to their work condition. 施工人員佩戴好安全帽、勞保鞋、安全眼鏡、反光背心等個(gè)人PPE,特殊工種需根據(jù)工作需要配備好其它防護(hù)用具;4)Crane and excavator and other relevant machinery should be qualified before put into practice and relevant operations and supervisors should have valid qualification documents. 挖掘機(jī)等相關(guān)機(jī)械使用前必須經(jīng)驗(yàn)收合格,相關(guān)操作及指揮人員持有有效的資格證明文件;5)After one day construction, clean up those remaining materials and rubbish produced from the construction procedure. 當(dāng)天施工完畢后,及時(shí)將剩余的材料及施工過(guò)程中產(chǎn)生的垃圾等清理干凈,做到工完場(chǎng)清;6) Project for construction area should be done before, and isolated with warning mark in full position. 進(jìn)行開(kāi)挖等作業(yè)時(shí),必須提前規(guī)劃好施工區(qū)域,對(duì)施工區(qū)域進(jìn)行隔離,并在醒目位置處懸掛警示標(biāo)志;7) During construction procedure, arrange fulltime safety officers to monitor the whole work progress and prevent wrong action.施工過(guò)程中,安排專職安全員對(duì)施工過(guò)程進(jìn)行全程監(jiān)控,杜絕違章操作。各類運(yùn)輸車(chē)輛在施工區(qū)域通行時(shí),均需配備專門(mén)指揮人