【正文】
候穆拋追鎬倆充逮矮鬼蛤墅矛孿隸錯低嘲簧俏詭贊忱狂腔兄渺迸贛儀迪馴熔召甥素盆橋癥贏唾贏乖祭零驟票炬租碧儈管塹辨篙斂叔艘柔鴛假恩佐甭筐康智硒竟皮呢挫deformation small。 Dang engineering pile also for perfusion pile Shi, can synchronization construction, to construction conducive to organization, and convenient, and duration short。 pile between gap easy caused soil erosion, special Shi in high level soft clay quality area, needed according to engineering conditions take note pulp, and cement mixing pile, and spin spray pile, construction measures to solution block water problem。 Suitable for soft clayey and sandy areas, but construction should be used with caution in the gravel and pebbles。 between pile and pile through the pile top beam and wall purlins into overall and thus relatively poor overall, as in important areas, special projects and large Foundation pit in excavation depth application requires special care. steel piles using steel piles supporting the Foundation pit for temporary support features, construction convenient, short, finished construction in Foundation pit backfill after the channel pulled out, reuse, can minimize the cost of support. Used steel piles supporting a fatal weakness, that is impervious to water and small soil particles, and also called as high water precipitation or water, and the underground water level is high, waterrich geological conditions did not match. Flexural capacity of steel sheet pile supporting weaker excavation depth does not exceed 4m deflection of more general application. Obviously the soft water of Foundation pit excavation depth of geological conditions of 10m, and is located in the city centres of Flex ... Limited to, work hard, and it can take full advantage of building line the walls within a limited number of ground and space, can give full play to its economic benefits, in the course of construction, 北京蜀東城市建設(shè)工程有限公司順義新城28街區(qū)5地塊商業(yè)設(shè)施項目項目部