freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

20xx年建設工程設計合同范本最新版(12篇)-資料下載頁

2025-08-06 19:14本頁面
  

【正文】 方可簽訂補充協(xié)議,有關協(xié)議及雙方認可的來往電報、傳真、會議紀要等,均為本合同組成部分,與本合同具有同等法律效力。甲方名稱: 乙方名稱:法定代表人:(簽字) 法定代表人:(簽字)委托代理人: 委托代理人:建設工程設計合同范本最新版篇七design contract for construction project (ii)(專業(yè)建設工程設計合同)(design contract for professional construction project)工 程 名 稱: 10kv變電所新建工程project name:10kv substation new construction工 程 地 點:project site:合 同 編號:contract no.:(由設計人編填) (filled in by designer)設計證書等級: 設證甲級a121001826design certification rank: design certificate class a 121001826發(fā) 包 人:employer:設 計 人: 電力勘察設計院designer: electric power survey design institute簽 訂 日 期:date:中華人民共和國建設部國家工商行政管理局supervised and manufactured byministry of construction of people’s republic ofchina and the state administration of industry and merce發(fā)包人:employer:設計人:電力勘察設計院 designer: electric power survey design institute發(fā)包人委托設計人承擔 10kv變電所新建工程設計,工程地點為 ,經(jīng)雙方協(xié)商一致,簽訂本合同,共同執(zhí)行。the employer entrusts the designer to undertake 10kv star mall plaza 1 substation new construction。 the project site is , bei’er zhong road, tiexi district, shenyang city. upon agreement by both parties through consultation, the two parties shall sign and implement the contract jointly.第一條 本合同簽訂依據(jù) article 1: this contract is signed in accordance with:《中華人民共和國合同法》、《中華人民共和國建筑法》和《建設工程勘察設計市場管理規(guī)定》。 contract law of the people’s republic of china, construction law of the people39。s republic of china and market regulations of construction survey and design.。 laws and regulations of the related state and local construction survey and design management.。 documents of approval for construction.第二條設計依據(jù)article 2 design basis the trust deed or design documents of the tender accepted provided to the designer by the employer。 fundamental materials submitted by the employer。: the major technical standards adopted by the designer are:b01r5sj0220xx標準、規(guī)程、規(guī)范b01r5sj0220xx standards, procedures, norms第三條合同文件的優(yōu)先次序article 3 priority of contract document構成本合同的文件可視為是能互相說明的,如果合同文件存在歧義或不一致,則根據(jù)如下優(yōu)先次序來判斷:the documents consisting of this contract may be deemed as demonstrating mutually。 if there is any ambiguity or discordance in the contract document, the following priority shall be followed to judgment, the contract。(文件) letter of acceptance (document)。 requirements of the employer and letter of authority。 the tender第四條 本合同項目的名稱、規(guī)模、階段、投資及設計內(nèi)容(根據(jù)行業(yè)特點填寫)article 4 name, scale, phase, investment and design content for the contract items (fill in based on industry characteristics)10kv星摩爾購物廣場1變電所新建工程10kv star mall plaza 1 substation new construction變電所電氣及10kv進線electric and 10kv inlet wire of the substation變電所設在地下,內(nèi)設6臺1600kva變壓器及2臺1250kva變壓器。the substation is underground, with six 1,600kva transformers and two 1,250kva transformers inside.10kv電源分別由勸工變、歷工變電所各新出電纜新路徑電纜敷設至用戶變電所。the 10kv power line is laid along the new cable roads of quangong substation and ligong substation respectively, toward the customer substation with cables.第五條 發(fā)包人向設計人提交的有關資料、文件及時間article 5 relevant materials, documents and time submitted to the designer本工程供電方案 1份 20xx225power supply scheme of this project 1 25 february, 20xx用電負荷資料 1份 20xx225by the employerelectricity load data 1 25 february, 20xx第六條 設計人向發(fā)包人交付的設計文件、份數(shù)、地點及時間article 6 documents, number of copies, location and time submitted to the employer by the designer設計圖紙 8份 20xx0415design drawing 8 copies 15 april, 20xx概算書 6份 20xx0415book of estimates 6 copies 15 april, 20xx注:待發(fā)包人結(jié)清全部設計費后,由設計人將設計文件交付沈陽供電公司客戶工程部note: after the party issuing contract settles up the total design fee, the above design documents will be submitted to the project spanision of shenyang power supply pany by the designer.第七條費用article 7 expenditure,本合同的設計費為設計費按設計價格(20xx)10號文計取 萬元。收費依據(jù)和計算方法按國家和地方有關規(guī)定執(zhí)行,國家和地方?jīng)]有規(guī)定的,由雙方商定。 it is agreed between both parties that the design fee under this contract is calculated and charged according to the document (20xx) design prices. the charging basis and method are in accordance with relevant national and local provisions, and will be determined by both parties through negotiation, if there is no relevant national or local provision. 如果上述費用為估算設計費,則雙方在初步設計審批后,按批準的初步設計概算核算設計費。工程建設期間如遇概算調(diào)整,則設計費也應做相應調(diào)整。 if the above expense is estimated design fee, both parties shall check the design fee as per the approved budgetary estimate of the preliminary design, after the examination and approval of preliminary design. during the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly.第八條支付方式article 8 form of payment,發(fā)包人支付設計費總額,計 16 萬元作為定金(合同結(jié)算時,定金抵作設計費)。 the party issuing contract shall pay the total design fee, within three days after the execution of this contract, that is, 160000 rmb as a deposit (the deposit will be seen as a part of design fee, at the time of contract settlement). 全部 設計文件之前,發(fā)包人結(jié)清設計費,不留尾款。 before the designer submits all design documents. the design charge is all squared by the employer, and no final payment left.。 both parties mission bank to pay and collect related fees.第九條雙方責任article 9 responsibility of two parties responsibility of the employer,在規(guī)定的時間內(nèi)向設計人提交基礎資料及文件,并對其完整性、正確性及時限負責。發(fā)包人不得要求設計人違反國家有關標準進行設計。發(fā)包人提交上述資料及文件超過規(guī)定期限15天以內(nèi),設計人按本合同第六條規(guī)定的交付設計文件時間順延。發(fā)包人交付上述資料及文件超過規(guī)定期限15天以上時,設計人有權重新確定提交設計文件的時間。 the employer shall deliver basic materials and documents to the designer within the specified time in accordance requirements stipulated in article 5, and shall be responsible for their pleteness, correctness and time limit. the employer shall not request the designer to design by violating the concerned national standards.if it exceeds the prescribed time limit within fifteen (15) days when the employer delivers above materials and documents, the designer can postpone accordingly the time of delivering the design documents in accordance with article 6 in the contract。 if it exceeds the prescribed time limit over fi
點擊復制文檔內(nèi)容
環(huán)評公示相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1