freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

補償貿(mào)易合同精選5篇(編輯修改稿)

2024-10-06 22:34 本頁面
 

【文章內(nèi)容簡介】 rm l/c in favour of party b to pay in install ments the entire cost of the machinery and its support sight l/c infavour of {arty a as a payment for the cost of the products to be delivered by party a shall pay for the total cost of the machinery and its supporting equipment with the sum of money which party b shall pay the products to be delivered by party a as a maketerm l/c is determined by the atrp payment on a monthmonth basis,and pay is off within a preriod of _________ years and _________ payment shall start approximately _________months after the first delivery of the machinery is principle,the sum to be paid per month shall be _________ percent of the total amount due to be paid for the machinery party a can make its payment ahead of schedule with a notice given to party b _________ months in the pensation period,party b shall open a l/c in favour of party b,covering the total amount,at sight,irrevocable,divisible and assignable,in accordance with the relevant provisions in the buysell contract on pensation 4 currency for pricingproducts provided by either party shall be priced in terms the items supplied by party b,including machinery,the required apparatus,accessories and spare parts shall be priced directly in terms of _________ above mentioned。while the products provided byparty a as a maketerm l/c and the down payment of party annual interest rate is agreed upon at _________%.article 6 technical serviceafter arrival at the destination port,the machinery shall be assembled by party party a believes it is necessary,party b shall send its technicians to provide onthespot instructions and other required technical assistance during the course of b shall be liable for the losses incurred in the coures fo assemblingas a result of technical default of its approval by both parties,party b shall send a group of technicians to china to faciliate the pletion of the cost incurred in china shall be borne by party 7 additional equipmentin the course of implementing the contract if it is foun necessary that,in addition to the machinery and accessories already listed in the provisions,some additional items of the equipment and measuring and testing apparatus are needed,an additional order shall be agreed upon through items thus added shall be incorporated in the 8 insuranceafter being delivered in china,the machinery and its supporting equipment shall be insured by party unforeseen losses in connection with the equipmentshall be indemnified for by the insurance pany first to the insurer(party b)in case the equepment has already been paid off for and thus transferred into party a’s a proportional part of the sum paid by the insurance pany shall be allotted to party a to cover the payment party a has already made for the items of equipment involved the 9 liability for breacheither party shall be liable for a breach of contract in accordance with the provisions in the contract and shall indemnify for all the losses thus if party b should fail t
點擊復制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1