【文章內(nèi)容簡(jiǎn)介】
g組裝后間隙(mm)Clearance afterassembling日 期Date注:間隙測(cè)量部位另附圖 (如果需要)。Note: Clearance measured location has diagram attached(if necessary).檢查員Inspector施工人Operator表H-206電機(jī)空氣間隙測(cè)量記錄Air gap measurement record for motor項(xiàng) 目:Project裝 置:Unit工 號(hào):Section位 號(hào)Location No.名稱(chēng)Name執(zhí)行標(biāo)準(zhǔn)Standard for execution按定子上標(biāo)定的一點(diǎn)盤(pán)車(chē)檢查空氣間隙 單位:(mm)Inspection of air gap at specified point on the stator by idle rotating Unit:部位Location12345678910 111213141516171819實(shí)測(cè)值Measured value按轉(zhuǎn)子上標(biāo)定的一點(diǎn)盤(pán)車(chē)檢查空氣間隙 單位:(mm)Inspection of air gap at specified point on the rotor by idle rotating Unit:部位Location12345678910實(shí)測(cè)值Measured value監(jiān)理單位檢查員Inspector施工人Operator表H-128機(jī)組對(duì)中記錄Alignment record of machine set項(xiàng) 目:Project裝 置:Unit工 號(hào):Section位 號(hào)Location No.名稱(chēng)Name執(zhí)行標(biāo)準(zhǔn)Standard for execution允許偏差允許偏差聯(lián)軸器編號(hào)Coupler No.徑 向Radial軸 向Axial端面間隙Clearance at end百分表固定位置Fixed position of dial indicatorTolerancea1a2a3a4 Tolerance b1b2b3b4規(guī)定值Stipulated value實(shí)測(cè)值Measured value 備注:Remarks監(jiān)理單位代表施工單位Subcontractor施工人Operator建設(shè)單位代表Owner representative檢查員Inspector表H-208____透平運(yùn)轉(zhuǎn)報(bào)告 Testrun report for_______ turbine項(xiàng) 目:Project裝 置:Unit工 號(hào):Section位 號(hào)Location No.機(jī)組名稱(chēng)Name of machine set功 率Power介質(zhì)名稱(chēng)Name of medium介質(zhì)壓力Pressure of mediumMpa介質(zhì)溫度Temp. Of medium℃額定轉(zhuǎn)速Rated rotational speedr/min試車(chē)類(lèi)別Type of test run試車(chē)日期Date of test run執(zhí)行標(biāo)準(zhǔn)Standard for execution危急保安器試驗(yàn)Test of emergency protection device手動(dòng)Manual自動(dòng)Automatic時(shí) 間轉(zhuǎn) 速軸振動(dòng)(mm)軸位移 (mm)備 注TimeSpeed介 質(zhì)Medium潤(rùn)滑油Lubricant軸承溫度Bearing temp(℃)Shaft vibrationShaft displacement Remarks流量Flow rate溫度Temp(℃)壓力Pressure(Mpa)溫度Temp(℃)壓力Pressure(Mpa)前Front后Rear進(jìn)In出out 進(jìn)In出out 進(jìn)In 出out 進(jìn)In出out