freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

成套設(shè)備出口合同范本及說(shuō)明(編輯修改稿)

2024-09-04 11:07 本頁(yè)面
 

【文章內(nèi)容簡(jiǎn)介】 ek (c) From the ninth week, the liquidated damages shall be ____ ( ) percent of the value of the delayed portion of Technical Document per week. The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed 20 percent of Technical Document price. The payment of liquidated damages under Articles above shall be in plete satisfaction of the Seller’s obligation. Notwithstanding the Seller makes the payment of the liquidated damages for the Technical Document, the Seller shall not be released obligation to deliver the Technical Document.Article 6 Packing and Marking The Equipment shall be packed to withstand long distance transportation, multiple handling. The Seller shall mark the following on two opposite sides of each package with indelible painted English words: (a) Destination (b) Consignee (c) Contract number (d) Shipping mark (e) Gross/net weight (kg) (f) Case/ bale number (g) Dimensions: L x W x H (cm) Each package shall contain one (1) copy of packing list. The Seller shall mark on the package, if necessary, “Handle with Care, “Right Side Up, “Fragile or other indicative marks according to the characteristics and feature of the goods as well as different requirement for transportation, loading and unloading of the goods. If the goods weigh three (3) or more than three (3) metric tons, gravity, hoisting position and illustrative marks shall be marked so as to facility loading, unloading and handing. All Technical Document provided by the Seller shall be properly packed to withstand long distance transportation and multiple handling. The surface of each package shall be marked with the following words: (a) Destination (b) Consignee (c) Contract number (d) Gross/net weight (kg) (e) Item number (f) Dimensions: L x W x H (cm)Article 7 Standards and Inspection The Seller shall carry out the design, manufacture, inspection and test of the Equipment supplied by the Seller according to the existing standards of the People’s Republic of China, namely GB. It is mutually agreed by both parties that the Equipment supplied by the Seller shall be inspected by the EntryExit Inspection and Quarantine Bureau of the People’s Republic of China and that the Certificate of Inspection shall be deemed as the effective evidence of the quantity and quality of the Equipment. The inspection fee shall be on the Seller’s account. The Buyer should store the Equipment after its arrival at the Job Site in accordance with the storage instruction given by the seller should assistant the Buyer to do this. The opencase inspection of the Equipment shall be performed in the presence of the Seller’s representatives at his own expenses on the Job Site. The Buyer shall inform the Seller of the date one (1) month before the date of open case inspection and shall also render assistance to the Seller’s inspectors in their inspection work. During the joint opencase inspection, a detailed inspection record shall be made and signed by the representatives of both parties. In case the Seller is responsible for any defect or shortage of the Equipment, the inspection record shall be taken as an effective evidence for the Buyer to claim repair, replacement or supplement to the Seller. If any missing, defect of or damage to the Equipment is found in opencase inspection attributable to the Buyer’s responsibility or fault, or any third party39。s (such as carrier39。s or insurer39。s) responsibility or fault, the Seller shall make repair, replacement or supplement at the Buyer’s expenses in accordance with the separate agreement signed by both parties. The Buyer is not entitled to open the case, assemble and/or disassemble the Equipment without the Seller’s prior written consent. If there is not joint open case inspection due to the Buyer’s reason, the quantity and apparent quality of the Equipment shall be deemed correct and in perfect condition. Article 8 Design and Design Liaison The Buyer shall provide to the Seller within 10 days after the Effective Date of the Contract, all the design data which shall be taken as the design basis. A design liaison meeting shall be held in the one month after receiving the basic design information, the Seller will dispatch his technical personnel to the Job Site to participate in the meeting. During the meeting period, the Seller will discuss with the Buyer the relevant design details. Both parties shall sign an agreement outlining the design details. During the design liaison meeting, the Seller and the Buyer shall provide assistance to the other’s dispatched personnel in arranging entry visas to the respective countries. The expense incurred on the dispatched personnel shall be borne by the party respectively. Article 9 Erection, Test Run, Commissioning, Performance Test and Acceptance The Erection, Test Run, Commissioning, Performance Test shall be conducted by the Buyer with the a
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1