【文章內(nèi)容簡介】
de by the horizontal loads is calculated by Dvalue method.Critical materials : Concrete: Foundationbed C10 Foundation, foundation beams, beams, boards and column C30 Steel: Reinforcing steel bar is HRB335( fy =300N/mm2) Stirrup is HPB235 ( fy =210N/mm2) Reinforcement in girder and shear wall should overlap, which must meet the design requirements. Welding position and anchorage length must conform to what is prescribed in design plan. Reinforcement cover: Beam 35mm。 Column 40mm。 Board 20mm. Load: Basic wind pressure 。 Basic snow pressure 。 Live load of roof 。 Live load of floor and hallway 4. Specification of construction organizationUtilization of water and electricity at the construction site can be connected from circuit and water pipe net that have existing consummately nearby. Preparation of everything