【文章內容簡介】
an be released for the update of the standard price (in the sequence of there importance and selection within the release):167。 Flagged product costings167。 Future prices from the accounting, maintained on the accounting view of the material master or by means of transaction CKMPRP(N) or CKMLCPThere are the following prerequisites for the successful release of standard prices in the R/3 standard system:1. The current MM period has to correspond to the current FI period. *According to the fiscal year variant from the system or user date(MM會計期和FI會計期一致)2. The period for which the cost estimate was created and flagged has to correspond to the current MM period or the validfrom date of future prices from the accounting must have been reached.(成本視圖中標記的未來價格期間和MM期間一致,或者會計視圖中的未來價格有效日期已經(jīng)到了)3. In the release period, a release of a running cost estimate does not have to be occurred yet.(在發(fā)布期間,沒有已經(jīng)發(fā)布過的估算價格存在)4. Provided that a future price is supposed to be released from the accounting, but a flagged, released or passed cost estimate is anchored on the cost estimate view of the material master, you either have to undo these anchors (REDO or deletion in Transaction CKR1) or you have to override message CKPRCH025 or M8155. When you override the message the program might issue incorrect values in the variance calculation and in the COPA since the standard price might not correspond to the current planned price anymore.(如果會計視圖有一個預想要發(fā)布的價格,但成本視圖中有一個標記的、發(fā)布的或者過去的估算成本,不要嘗試用CKR1中的REDO或“刪除”去撤消這些價格)5. Provided that the Material Ledger (ML) is active, the period status has to permit the release. In this case, you have to consider that a release does not have to basically occur after the end of the prior period (Except