freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

某城鎮(zhèn)污水a(chǎn)ao處理工藝畢業(yè)設(shè)計(jì)(編輯修改稿)

2025-07-14 16:28 本頁面
 

【文章內(nèi)容簡介】 ...............................................................................................................33 水頭損失 ...................................................................................................................................................33 構(gòu)筑物高程布置 .......................................................................................................................................364 經(jīng)濟(jì)核算 .........................................................................................................................................................365 結(jié)語 .................................................................................................................................................................38參考文獻(xiàn) .............................................................................................................................................................39致 謝 .................................................................................................................................................................40武漢理工大學(xué)學(xué)士學(xué)位論文1摘 要本設(shè)計(jì)根據(jù)給定的原始資料及相關(guān)要求,進(jìn)行完整的中國某地區(qū)某城市污水廠工藝設(shè)計(jì)。污水廠設(shè)計(jì)水量為 40000m3/d,考慮總變化系數(shù)(總變化系數(shù)為 ) ,則最大污水量為 53040m3/d。該污水處理廠工程分兩期建設(shè),包括污水的一級(jí)處理階段,廠區(qū)內(nèi)設(shè)有污水二級(jí)處理工藝、及污泥處理工藝。本設(shè)計(jì)對(duì)污水處理廠一級(jí)、 以及以 A2/O 法為主體的二級(jí)處理工藝流程的選擇給予說明,對(duì)具體污水及污泥構(gòu)筑物結(jié)構(gòu)進(jìn)行了詳細(xì)計(jì)算。A 2/O 工藝是厭氧 缺氧好氧生物脫氮除磷工藝的簡稱,一般適用于要求脫氮除磷的大中型城市污水廠。A 2/O 工藝具有流程簡單、投資低、沉淀效果好等優(yōu)點(diǎn) [1]。本設(shè)計(jì)要求處理后的水質(zhì)滿足國家城市污水排放水質(zhì)標(biāo)準(zhǔn)《城鎮(zhèn)污水處理廠污染物排放標(biāo)準(zhǔn)》 (GB 189182022)一級(jí) B 標(biāo)準(zhǔn)。由于污水來源主要為生活污水,氮磷含量較高,由此設(shè)計(jì)中需要考慮到脫氮除磷。該廠二級(jí)生物處理主要采用 A2/O 處理工藝,主要構(gòu)筑物為:粗格柵、集水井、提升泵房、細(xì)格柵、旋流沉砂池、平流式沉淀池、A 2/O 反應(yīng)池、輻流式沉淀池、接觸消毒池。污泥處理構(gòu)筑物有:重力濃縮池、污泥脫水機(jī)房等。污水廠設(shè)計(jì)方案為:污水處理流程:粗格柵 → 污水提升泵房 → 細(xì)格柵 → 旋流沉砂池 →A 2/O 反應(yīng)池→ 消毒接觸池→ 排放;污泥處理流程:剩余污泥 → 濃縮池 → 貯泥池→ 污泥脫水機(jī)房 → 泥餅外運(yùn)。關(guān) 鍵 詞 : 城市污水; A2/O 工藝; 深度處理武漢理工大學(xué)學(xué)士學(xué)位論文2AbstractThis design mainly elaborate on the drainage works and the technology of sewage plant in China, the region based on the first hand materials and relevant requirements. Design of water, sewage plant 40000m3/d, consider the consumption of water (water factor of ),the largest amount of sewage to 53040m3/d.This Sewage Treatment Plant project is divided into two phase of construction, includes a sewage treatment stage, there existing sewsge secondlevel processing craft, water reuse process and sludge treatment process. The design reasons the choice of primary and secondary treatment process—A2/O process,the calculation of constructing process.A 2/O is short for AnaerobicAnoxicOxic, which is one of many biological nitrogen processes.It is adaptative in some large and mediumsized sewage treatment plants. I found that the A2/O has the following advantages:simple process,low investment and good sedimentation,so I choose A2/O for the treatment of wastewater.After this design requirements processing water quality satisfies the country urban sewage emissions water standard Cities Sewage treatment plant Pollutant discharge Standard (GB 189182022) the firstlevel B standard. Because the sewage originates is mainly the sanitary sewage, the nitrogen phosphorus content is high, from this designs needs to consider the denitrogenation eliminates the phosphorus. This factory secondlevel biological treatment mainly uses A2/O processing craft, the main construction is: the grill, the catchpit ,promotes the pump house, the thin grill, the eddy sand collector, the advection type sedimentation pond, A2/O response pond, the spoke class type sedimentation pond, the disinfecting tank. The sludge treatment construction includes: Gravity concentration basin, sludge dewatering engine room and so on. The process of the wastewater plant that the wasterwater treatment plant adopted is as following:Wastewater treatment process: coarse screens → pump station → fin bar screen → aeration desilting tank → A 2/O process→ disinfection of contact pool→measurement groove → drain。Sludge handling and disposal process: excess activated sludge → concentrated pool → sludge tank → machine dewatering → disposal of sludge cake.Key words: Urban sewage。 A2/O craft。 Advanced treatment武漢理工大學(xué)學(xué)士學(xué)位論文31 設(shè)計(jì)概論 項(xiàng)目概況某小城鎮(zhèn)隨著工業(yè)化的迅速發(fā)展,水環(huán)境污染日趨嚴(yán)重,擬建設(shè)城鎮(zhèn)污水處理廠,項(xiàng)目一期建設(shè)規(guī)模確定為處理水量 40000 m3/d ,污水處理廠進(jìn)水水質(zhì)指標(biāo)如下表,水溫10~25℃。污水處理廠出水就近排入附近水域,該水域?yàn)榈乇硭箢惞δ芩?,?zhí)行《城鎮(zhèn)污水處理廠污染物排放標(biāo)準(zhǔn)》 (GB189182022)中的一級(jí) B 類標(biāo)準(zhǔn)。進(jìn)出水水質(zhì)情況:表 1 進(jìn)水水質(zhì)水質(zhì)指標(biāo) 原水水質(zhì)COD(mg/L) 320BOD(mg/L) 200SS(mg/L) 170總氮 25總磷 5pH 6~9表 2 出水水質(zhì) [2]水質(zhì)指標(biāo) 出水水質(zhì)COD(mg/L) ≤60BOD(mg/L) ≤20SS(mg/L) ≤20總氮 ≤20總磷 ≤pH 6~9 設(shè)計(jì)任務(wù)按照給定的水量、水質(zhì)指標(biāo)設(shè)計(jì) A/A/O 處理工藝。要求設(shè)計(jì)應(yīng)達(dá)到初步設(shè)計(jì)的深度。應(yīng)有設(shè)計(jì)說明書(含工藝說明、主要構(gòu)建筑物和處理設(shè)備說明、配套設(shè)施明細(xì)以及污水處理站投資和運(yùn)行成本的估算等內(nèi)容)和設(shè)計(jì)計(jì)算書,計(jì)算書要求計(jì)算正確、內(nèi)武漢理工大學(xué)學(xué)士學(xué)位論文4容完整、條理清楚。圖紙部分要求繪制廢水處理站的總平面布置圖(含站內(nèi)管道布置) 、高程布置圖和主要構(gòu)筑物的平、剖面圖。 設(shè)計(jì)依據(jù)及標(biāo)準(zhǔn) 《污水綜合排放標(biāo)準(zhǔn)》 (GB89781996) 《給水排水工程結(jié)構(gòu)設(shè)計(jì)規(guī)范》 (GBJ7987) 《室外排水設(shè)計(jì)規(guī)范》 (GBJ1487) 《中華人民共和國環(huán)境保護(hù)法》和《水污染防治法》 《建筑給排水設(shè)計(jì)規(guī)范》(GBJ12589) 《污水泵站設(shè)計(jì)規(guī)程》(DBJ082391) 《地表水環(huán)境質(zhì)量標(biāo)準(zhǔn)》 (GHZB11999 ) 《 污 水 綜 合 排 放 標(biāo) 準(zhǔn) 》 ( DB89781996) 《城市污水處理工程項(xiàng)目建設(shè)標(biāo)準(zhǔn)》( 建標(biāo)【2022】77 號(hào)) 《城市給水工程規(guī)劃規(guī)范》(GB5028298)1 《城鎮(zhèn)污水處理廠附屬建筑和附屬設(shè)備設(shè)計(jì)標(biāo)準(zhǔn)》(CJJ3189)1 《城市污水處理廠污水污泥排放標(biāo)準(zhǔn)》(CJ302593) 設(shè)計(jì)原則及范圍 設(shè) 計(jì) 原 則(1)嚴(yán)格按照國家關(guān)于污水處理的有關(guān)設(shè)計(jì)規(guī)范的要求進(jìn)行設(shè)計(jì),采用先進(jìn)、成熟的處理工藝及設(shè)備。(2)本著安全可靠、管理簡便、經(jīng)濟(jì)合理的原則,力求做到管理方便、運(yùn)行費(fèi)用低、易于操作、便于維修、處理運(yùn)行穩(wěn)定可靠 [3]。 設(shè)計(jì)范圍從污水處理站納污口至污水處理后排放口之間的設(shè)備、構(gòu)筑物、管道。2 工藝流程的確定 工藝流程的比較城市污水處理廠的方案,既要考慮有效去除 BOD5 又要適當(dāng)去除 N,P 故可采用 SBR或氧化溝法,或 A/A/O 法,以及一體化反應(yīng)池即三溝式氧化溝得改良設(shè)計(jì) . SBR 法武漢理工大學(xué)學(xué)士學(xué)位論文5工藝流程:污水 → 一級(jí)處理→ 曝氣池 → 處理水工作原理:流入工序:廢水注入,注滿后進(jìn)行反應(yīng),方式有單純注水,曝氣,緩速攪拌三種,曝氣反應(yīng)工序:當(dāng)污水注滿后即開始曝氣操作,這是最重要的工序,根據(jù)污水處理的目的,除 P 脫 N 應(yīng)進(jìn)行相應(yīng)的處理工作。沉淀工藝:使混合液泥水分離,相當(dāng)于二沉池,排放工序:排除曝氣沉淀后產(chǎn)生的上清液,作為處理水排放,一直到最低水位,在反應(yīng)器殘留一部分活性污泥作為種泥。待機(jī)工序:工處理水排放后,反應(yīng)器處于停滯狀態(tài)等待一個(gè)周期 [4]。特點(diǎn):(1)大多數(shù)情況下,無設(shè)置調(diào)節(jié)池的必要。(2)SVI 值較低,易于沉淀,一般情況下不會(huì)產(chǎn)生污泥膨脹。(3)通過對(duì)運(yùn)行方式的調(diào)節(jié),進(jìn)行除磷脫氮反應(yīng)。(4)自動(dòng)化程度較高。(5)得當(dāng)時(shí),處理效果優(yōu)于連續(xù)式。(6)單方投資較少。(7)占地規(guī)模大,處理水量較小。 厭氧池+氧化溝工作流程:污水→中格柵→提升泵房→細(xì)格柵→沉砂池→厭氧池→氧化溝→二沉池→接觸池→處理水排放工作原理:氧化溝一般呈環(huán)形溝渠狀,污水在溝渠內(nèi)作環(huán)形流動(dòng),利用獨(dú)特的水力流動(dòng)特點(diǎn),在溝渠轉(zhuǎn)彎處設(shè)曝氣裝置,在曝氣池上方為厭氧池,下方則為
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1