【文章內(nèi)容簡(jiǎn)介】
aterial var ieties and specif icat ions tr ongly ban f or t he engineer ing in t he, Af t er passing inspection inf ormed t he wor kshop of pr oduct ion of t im ber accor ding t o st rict pr oduction details of production, wor kshop or ganized by t he Gener al M anager before t he pr oduct ion t ec hnology and secur it y sect or t echnical saf et y t r aining, safety educat ion pany t o st rict ly t hr eelevel disclosur e, t r aining of qualif ied per sonnel is st rict ly pr ohibit ed t o post pr oduction, pr oduct ion per sonnel m ust be lis t ed t o wor k, you m ust have t he cor responding certif icate. Road wor ker s m ust have t he cer tif icat e, and r egular assessm ents should be car ried out, not a skiled oper at or post s i st rictly pr ohibit ed. Pr oduct ion of various it ems of equipm ent , appliances and other, non pr of essional is st rict ly prohibit ed act ions and st rict r egulat ions, st rong r ewar ds, be elim inat ed. Pr oduction line set on person, t it le, r esponsibilt ies, and per form ance and safet y prehensive assessment . Mater ial procur ement pr ocess str ictly handling t he 3 五、電氣設(shè)備的試、檢驗(yàn)憑單和調(diào)試記錄 ; 六、接地電阻測(cè)定記錄表; 七、定期檢(復(fù))查表; 八、電工維修工作記錄。 第 。其中《電工維修工作記錄》可指定電工代管,并于臨時(shí)用電工程拆除后統(tǒng)一歸檔。 第 :施工現(xiàn)場(chǎng)每月一次;基層公司每季一次?;鶎庸緳z查時(shí),應(yīng)復(fù)查接地電阻值。 第 、分項(xiàng)工程進(jìn)行,對(duì)不安全因素,必須及時(shí)處理,并應(yīng)履行復(fù)查驗(yàn)收手續(xù)。 第三章施工現(xiàn)場(chǎng)與周圍環(huán)境 第一節(jié)在建工程與外電 線路的安全距離 第 、低壓線路下方施工,高低壓線路下方,不得搭設(shè)作業(yè)棚、建造生活設(shè)施,或堆放構(gòu)件、架具、材料及其它雜物等。 第 (含腳手架具)的外側(cè)邊緣與外電架空線路的邊線之間必須保持安全操作距離。最小安全操作距離應(yīng)不小于表 。 第 ,架空線路的最低點(diǎn)與路面的垂直距離應(yīng)不小于表 。 第 10kV 以下的架空線路邊線最小水平 距離不得小于 2m. 第 . 第二節(jié)外電防護(hù) 第 ,必須采取防護(hù)措施,增設(shè)屏障、遮欄、圍欄或保護(hù)網(wǎng),并懸掛醒目的警告標(biāo)志牌。 在架設(shè)防護(hù)設(shè)施時(shí),應(yīng)有電氣工程技術(shù)人員或?qū)B毎踩藛T負(fù)責(zé)監(jiān)護(hù)。 第 ,必須與有關(guān)部門協(xié)商,采取停電、遷移外電線路或改變工程位置等措施,否則不得施工。 第 外電架空線路附近開挖溝槽時(shí),必須防止外電架空線路的電桿傾斜、懸倒?;驎?huì)同有關(guān)部門采取加固措施。 第 ,集聚在機(jī)械設(shè)備上的靜電,應(yīng)采取接地泄漏措施。 第四章接地與防雷 第一節(jié)一般規(guī)定 Folowing par ts of or dinar y bolt conect ion: wall beam s, purlins, knee. Design of dr ainage, elect rical, heating, vent ilat ion, air condit ioning, power should be subj ect o saf et y r equir em ent s f or steel st r uct ur es of ot her pr ofessions, it is f or bidden t o weld hanging load and increased r oof and columns. Constr uction pr epared and t he constr uction layout f ir st ection mat erial pr epar ed and t he processing pr oduction pr epared accor ding t o Zhejiang mor e Palace steel im it ed and Wuhan int eligent elevat or lim it ed by signed of contr act f ile and t he I nsti ut e pr ovides of st eel design blueprint , I pany and t he Or ganization Technol gy Departm ent , pr oduct ion departm ent, pr ocur em ent Departm ent, bid do Engineer ing Departm ent, r elat ed pr oduct ion sect or f or dr awings t riage, and accor ding t o owner s r equir em ents t imely design out pr oduction and t he pr ocessing detail and f or has r elat ed pr of essional sect or of strictly triage, specific work process folowing: Bid do bid notice → Technol gy Department → add up do → procurement department → production department → quality Department → Engineering Department Technol gy Department production and t he pr ocessing detail pr oposed Hou, by add up do coor dination t he sector of supor ting wor k, and by figur e line by variet ies, and specif icat ions, and qualit y f or classif ied, and notif ication Pr ocurem ent Departm ent f or material of m ar ket sur vey and pr ocur em ent, by qualit y Depart ment according t o by purchased mat erial of specif icat ions variet ies f or qualit y r eview and t est, not qualif ied of material var ieties and specif icat ions tr ongly ban f or t he engineer ing in t he, Af t er passing inspection inf ormed t he wor kshop of pr oduct ion of t im ber accor ding t o st rict pr oduction details of production, wor kshop or ganized by t he Gener al M anager before t he pr oduct ion t echnology and secur it y sect or t echnical saf et y t r aining, safety educat ion pany t o st rict ly t hr eelevel disclosur e, t r aining of qualif ied per sonnel is st rict ly pr ohibit ed t o post pr oduction, pr oduct ion per sonnel m ust be lis t ed t o wor k, you m ust have t he cor responding certif icate. Road wor ker s m ust have t he cer tif icat e, and r egular assessm ents should be car ried out, not a skiled oper at or post s i st rictly pr ohibit ed. Pr oduct ion of various it ems of equipm ent , appliances and other, non pr of essional is st rict ly prohibit ed act ions and st rict r egulat ions, st rong r ewar ds, be elim inat ed. Pr oduction line set on person, t it le, r esponsibilt ies, and per form ance and safet y prehensive assessment . Mater ial procur ement pr ocess str ictly handling t he 第 TN—S 接零保護(hù)系統(tǒng)。電氣設(shè)備的金屬外殼必須與專用保護(hù)零線連接。專用保護(hù)零線(簡(jiǎn)稱保護(hù)零線)應(yīng)由工作接地線、配電室的零線或第一級(jí)漏電保護(hù)器電源側(cè)的零線引出。 第 、人防、隧道等潮濕或條件特別惡劣施工現(xiàn)場(chǎng) 的電氣設(shè)備必須采用保護(hù)接零。 第 ,電氣設(shè)備應(yīng)根據(jù)當(dāng)?shù)氐囊笞鞅Wo(hù)接零,或作保護(hù)接地。不得一部分設(shè)備作保護(hù)接零,另一部分設(shè)備作保護(hù)接地。 第 ,必須同時(shí)作重復(fù)接地。同一臺(tái)電氣設(shè)備的重復(fù)接地與防雷接地可使用同一個(gè)接地體,接地電阻應(yīng)符合重復(fù)接地電阻值的要求。施工現(xiàn)場(chǎng)的電氣設(shè)備和避雷裝置可利用自然接地體接地,但應(yīng)保證電氣連接并校驗(yàn)自然接地體的熱穩(wěn)定。 第 ,因條件限制接地有困難時(shí),應(yīng)設(shè)置操 作和維修電氣裝置的絕緣臺(tái),并必須使操作人員不致偶然觸及外物。 第 50V以上的接零保護(hù)系統(tǒng)供電,二次側(cè)為 50V及 50V以下電壓的降壓變壓器,如采用雙重絕緣或有接地金屬屏蔽層的變壓器,此時(shí)二次側(cè)不得接地。如采用普通變壓器,則應(yīng)將二次側(cè)中性線或一個(gè)相線就近直接接地?;蛲ㄟ^專用接地線與附近變電所接地網(wǎng)相連。 第 。 第 。 第 (見 表 ),接地電阻值在四季中均應(yīng)符合本章第三節(jié)的要求,但防雷裝置的沖擊接地電阻值只考慮在雷雨季節(jié)中土壤干燥狀態(tài)的影響。 第 ,不作它用。重復(fù)接地線應(yīng)與保護(hù)零線相連接。 第 ,應(yīng)不小于工作零線的截面,同時(shí)必須滿足機(jī)械強(qiáng)度要求。保護(hù)零線架空敷設(shè)的間距大于 12m 時(shí),保護(hù)零線必須選擇不小于 10mm2的絕緣銅線或不小于 16mm2的絕緣鋁線。 第 。保護(hù)零線的統(tǒng)一標(biāo)志為 綠燉黃雙色線。在任何情況下不準(zhǔn)使用綠燉黃雙色線作負(fù)荷線。 第二節(jié)保護(hù)接零 第 ,下列電氣設(shè)備不帶電的外露導(dǎo)電部分,應(yīng)做保護(hù)接零: 一、電機(jī)、變壓器、電器、照明器具、手持電動(dòng)工具的金屬外殼; 二、電氣設(shè)備傳動(dòng)裝置的金屬部件; 三、配電屏與控制屏的金屬框架; 四、室內(nèi)、外配電裝置的金屬框架及靠近帶電部分的金屬圍欄和金屬門; 五、電力線路的金屬保護(hù)管、敷線的鋼索、起重機(jī)軌道、滑升模板金屬操作平臺(tái)等; 六、安裝在電力線路桿(塔)上的開關(guān)、電容器等電氣裝置的金屬外殼 及支架。 第 ,下列電氣設(shè)備不帶電的外露導(dǎo)電部分,可不作保護(hù)接零: Folowing par ts of or dinar y bolt conect ion: wall beam s, purlins, knee. Design of dr ainage, elect rical, heating, vent ilat ion, air condit ioning, power should be subj ect o saf et y r equir em ent s f or steel st r uct ur es of ot her pr ofessio