【文章內(nèi)容簡介】
s with last calibration and calibration due date must be affixed to each instrument. 使用的所有設(shè)備都必須以一年的基準(zhǔn)進(jìn)行調(diào)校, 其調(diào)校日期和調(diào)校周期必須用黏紙黏固在每一個儀表上. The leakage current is to be measured between the (deadmetal parts)/(metal foil with an area of 10 by 20 cm in contact with the thermoplastic surfaces of the sample) and the grounded side of the supply source, and the control switch of the sample in “ON” position. 泄漏電流將在不帶電金屬零部件/馬達(dá)殼表面和地線之間測量, 在整個過程中, 樣機(jī)之開關(guān)應(yīng)保持在 “ON”amp。2. Before the test, leakage test switching box’s all switches must be in “OFF” position. 測試前,檢查測試盒的所有開關(guān)應(yīng)是在OFF檔. For this test, the sample must be isolated from the ground. 本測試,樣機(jī)必須于地板絕緣. Procedure/步驟: Obtain relevant number of samples of the appliance to be tested. 依據(jù)樣機(jī)適用條件準(zhǔn)備有代表性的樣機(jī)數(shù)量來進(jìn)行測試. Obtain Test Results Form TTR1006 and pletely fill in the information describing the sample and the equipment used prior to running the test. 用TTR1006測試結(jié)果的表格, 在測試操作前完整地填入樣機(jī)和使用的設(shè)備的情況. Abnormal con