【文章內(nèi)容簡(jiǎn)介】
the careful supervision of the professional supervision engineers, i became familiar with the relevant regulations and requirements of some design drawings.in the civil construction of concrete pouring construction, the project involves a number of key parts of the process, once negligence may cause engineering quality accident, so in the next station construction, strengthen the monitoring, strict supervision of various parts of the construction, strengthen the construction process control, construction units in strict accordance with the design requirements, construction plans and acceptance criteria for construction, to ensure the quality of the ision records are an indispensable link in project supervision, in the field inspection, parallel inspection process, i do a detailed record every day, have a plete supervision of the log, as well as next to the station records.in the construction of the bypass station, it is necessary to clarify the location of the casting ponents, the