【文章內(nèi)容簡(jiǎn)介】
to master the standard pronunciation. as a linguistic phenomenon applied to the public, mandarin is closely related to people 39。s daily social life and is widely used in real life. so in order to better adapt to our society in the future, the time in the university should strive to improve their mandarin level.5 continuous selfevaluationcorrect selfevaluation is the condition that helps us to make the right direction of struggle, through two channels: direct selfevaluation and indirect selfevaluation. first of all, to recognize their own natural conditions, including health, mental state, emotional characteristics, interest, knowledge, professional expertise, intelligence, ability characteristics, and so on, followed by their own in different areas in practice to achieve the different results pared to find their own strengths, to determine the goal of struggle. indirect selfevaluation method, refers to the behavior of others and the contrast of the situation and found that the dislocation of selfknowledge.time flies, in a blink of an eye we in the beautiful campus of agricultural university ushered in the sophomore of the second semester, each new start is a challenge, i believe that in this new semester, we can continue to challenge yourself, continuous progress, the pursuit of a more exciting life!測(cè)量員員工自我評(píng)價(jià)篇四blink of an eye 10 years have gone, we ushered in a new year. summing up the work of the past year, from a personal point of view about the measurement of awareness.quality is the life, quality is the fundamental guarantee for enterprise development. in the fierce petition in the construction market today, how to improve the construction quality management level is every enterprise managers must think about. factors affecting the quality of construction in all aspects. from the engineering measurement point of view, analyze the work of measuring the payoff to ensure and improve the quality of the construction of an important role, and simply how to strengthen the management of measurement work to improve the quality of construction.it is a very important technical work of municipal road engineering that the measuring and measuring line is an important technical work. it is inseparable from the whole process of construction, from the preparation before construction to the pletion of the construction, to the final acceptance after construction. how to do a quick and good measurement of the line, is a basic technical skills and test the basic requirements.do the measurement before the mencement of the endbefore the start of the project, the survey and design units shall be responsible for onsite surveying and settlement according to the design documents, and the site standard point, conductor piles and crossing point piles shall be clearly identified according to the design drawings. within the measurement of signs, must take appropriate protection measures. on the measurement of the end, it is necessary to emphasize the protection of pile position, that is, in the design unit after pile, should be timely use of brick piers or pouring cement pier and other methods to be protected, so as not to lose. these piles are generally farmland or residential areas, it is easy to be manmade destruction, and once destroyed, let the survey and design units to fill test, then delay the construction, but also increase the cost.midline retest and edge loftcenter line measurement is based on the alignment measurement, the road center line plane position on the ground marked in detail. it is the difference with the alignment measurement is: alignment measurement, but the intersection of the road and the straight line segment of the necessary turning point marked out, and in the midline measurement, according to the intersection and the turning point with a series of stakes will road straight segment and curve segments are specified in detail on the ground.the alignment survey is usually carried out by the survey and design units, and then the pile and measurement results to the construction side, the construction unit by the middle line and construction measurement.subgrade construction should be fully restored before the center line, according to the restoration of the pile in the road and the relevant provisions of the roadbed side of the pile. on the midline remeasurement and edge lofting, should pay attention to the following points。one should pay attention to the distance between the intersection, the direction is consistent with the drawings。 such as an engineering project has several tenders, should pay attention to the center of the adjacent tenders are closed, midline measurements should be indepth adjacent tenders 50 ~ 100 m。 attention should be paid to the center of the structure such as bridge and culvert is closed。 should pay attention to the relative position of the building and other buildings and drawings are consistent. if you find problems in a timely manner to identify the reasons for the design unit.second, retaining pile set. it is very important to set up pile protection pile in the middle of the road, but these piles are easy to be destroyed during the construction. therefore, it is necessary to carry out the restoration and surveying work of the middle pile during the construction of the roadbed. in order to quickly and accurately restore the center pile in the original position, must be on the road before the construction of the main control point of the pile such as the intersection point, turning point, curve control points set up retaining pile. the socalled retaining pile, is outside the scope of the construction is not easy to be destroyed where some stakes set ing to these pile, with simple methods (such as the intersection point, range, etc.), you can quickly restore the original pile point.set the pile should pay attention to the following aspects: in each straight section of the road, at least three control piles to set up ret