【文章內(nèi)容簡(jiǎn)介】
he munist party, thanks to the electric power enterprise, what is a positive energy , this is the positive energy, we further deep mountains, families are selfprovided power shaft, no electricity, we could not survive, let alone life . on may 28, jinzhou city tower ditch villagers representatives zhang weiji zhong tun township building, jinzhou city beiputuo mountain scenic area management office deputy director of the side line of six people, such as liu wei will pennants and a piece of red paper letters into the hands of taihe district power supply branch leadership, while the excited said thank you.beiputuo mountain scenic spot to daxing ditch village, rolling mountains, lush trees, the line was built in the 1960 s, due to the old, the wire already aging, the wind in the rain often power outages, and easy to cause fire, the villagers life is affected by a lot, because history and funds, has not been solved.at the beginning of the year, in order to solve this problem, we ensured the safe and stable electricity consumption of the national scenic spots and users of daxing valley village. the branch has promoted the hidden trouble of the line in this area to the hidden danger of urgent solution. the branch has opened the green channel in accordance with the principle of special operation, and has overe many difficulties and challenges. we will convene a meeting of leading groups to study and solve and formulate reform plans. in order to ensure the smooth transformation of the line, on january 12, branch manager to lead relevant personnel to the scene of the circuit transformation and the scenic area leadership and village cadres field office, field survey, onsite coordination design on the line, along the direction of the ground environment, cross across conditions, transport equipment and construction process of rock excavation, above the permafrost, stud, such as difficulty and the safe hidden trouble, make exploration and analysis of the field, to develop a detailed security risk prevention and control plan, organization, technology, safety measures, for the engineering safety, high quality pletion laid a solid foundation. branch in order to ensure construction safety, asked the more workers in the construction of the environment, the difficulty is to strictly implement the work plan, strictly implement standardized operation process, strictly implement the two ticket sanzhi, put an end to no ticket assignments, illegal behavior, put an end to ten ki