freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

電力管理系統(tǒng)國內(nèi)外現(xiàn)狀(留存版)

2025-06-01 23:28上一頁面

下一頁面
  

【正文】 et stability and power system stability[J]. Automation of Electric Power Systems. 2002,26:16.[7] Amin M.Toward selfhealing energy infrastructure systems [J].IEEE Computer Applications in Power,2001,14(1):2028.[8] C. Rakpenthai. Measurement placement for power system state estimation using deposition technique[J].Electric Power Systems ,75:4149.[9] Y. Zhou . Li. A robust approach for planning electric power systems associated with environmental policy analysis[J]. Electric Power Systems ,95:8488.[10] Silvano Chiaradonna. Definition,implementation and application of a modelbased framework for analyzing interdependencies in electric power systems [J]. International Journal of Critical Infrastructure Protection,2011,14 (1),2440.[11] Diego Malagueta. Potential and impacts of Concentrated Solar Power integration in the Brazilian electric power system[J].Renewable ,68:5761.[12] [J].企業(yè)技術(shù)開發(fā),2012,01:3940.[13] 楊帆. 配電網(wǎng)電力生產(chǎn)管理信息系統(tǒng)[J].高電壓技術(shù),2005,09:7880.[14] 中國電力信息中心. 國家電力公司系統(tǒng)信息化工作現(xiàn)狀及建議[J].中國電力,2001,01:1618.[15] Chen S. Webbased Simulations of Power Systems[J].IEEE Computer Applications in Power,2002,15(1):3540.[16] Liu C C,Jung J,Heydt G T,et al.Conceptual design of the strategic power infrastructure defense(SPID) system[J].IEEE Control System Magazine,2000,20(4):4052.[17] 鄧兆云,[J].電力系統(tǒng)自動化,2003,27( 16):78 801.[18] Hwa Gyoo,Young Nam,Jong object oriented production planning system development in ERP environment[J].Computers amp。在明確各級生產(chǎn)管理部門和運(yùn)行、檢修單位定位的基礎(chǔ)上,建立以設(shè)備管理和運(yùn)行管理為基礎(chǔ),以提高輸變電設(shè)施和供電可靠性為目標(biāo),覆蓋公司系統(tǒng)各級單位調(diào)度、輸電、變電、配電全過程的安全生產(chǎn)管理業(yè)務(wù)應(yīng)用。公司總部制定標(biāo)準(zhǔn)
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1