【正文】
late the shortcircuit electric current, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of shortcircuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of the shortcircuit electric current (4) the design of an electric shock the system design to connect with system and the choice of line project (5) the choice and the settle of the protective facility (6) the contents to defend the thunder and protection of connect the earth. Along with the high and quick development of electric power technique, electric power system then can change from the generate of the electricity to the supply the power. Key words: Substation Load Transmission system Distribution High voltage work Correction equipment. 武漢大學(xué)珞珈學(xué)院本科畢業(yè)論文 目 錄 前 言 ........................................................................ 1 緒 論 ........................................................................ 2 第一章 電氣主接線 主接線的 選擇 ............................................................................................................... 3 110kV電氣主接線 ....................................................................................................... 4 35kV電氣主接線 ........................................................................................................ 5 10kV電氣主接線 ........................................................................................................... 6 站用電接線 ................................................................................................................... 7 第二章 負(fù)荷計(jì)算及變壓器選擇 負(fù)荷計(jì)算 ...................................................................................................................... 9 負(fù)荷分類及定義 ................................................................................................... 9 負(fù)荷組成 ............................................................................................................. 9 主變臺(tái)數(shù)、容量和型式的確定 ...................................................................................... 11 2. 3 變電所主變壓器容量的確定 .......................................................................................12 2. 4 變電站主變壓器型式的選擇 .......................................................................................12 第三章 最大持續(xù)工作電流及短路電流的計(jì)算 各回路最大持續(xù)工作電流 .............................................................................................14 短路電流計(jì)算點(diǎn)的確定 ................................................................................................14 短路電流計(jì)算的目的 ....................................................................................................14 短路電流計(jì)算的步驟 ....................................................................................................15 電流計(jì)算結(jié)果 ..............................................................................................................16 第四章 主要電氣設(shè)備選擇 高壓斷路器的選擇 .....................................................................................................20 隔離開關(guān)的選擇 ...........................................................................................................21 各級(jí)電壓母線的選擇 ..................................................................................................22 絕緣子和穿墻套管的選擇 .............................................................................................22 電流互感器的配置和選擇 .............................................................................................22 電壓互感器的配置和選擇 .............................................................................................23 各主要電氣設(shè)備選擇結(jié)果一覽表 ..................................................................................24 第五章 防雷保護(hù)設(shè)計(jì) 變電站的防雷保護(hù)具有以下特點(diǎn) ...................................................................................26 變電站直擊雷防護(hù) ........................................................................................................26 侵入波過電壓防護(hù) ........................................................................................................26 避雷針保護(hù)范圍的計(jì)算 方法 ..........................................................................................26 第六章 110 kV 變電站設(shè)計(jì)注意事項(xiàng) ....................... 28 武漢大學(xué)珞珈學(xué)院本科畢業(yè)論文 附錄 Ⅰ: 短路電流計(jì)算書 ........................................... 32 附錄Ⅱ主接線圖 ........................................................ 37 10kV 配電裝置 ........................................................... 38 10kV 配電裝置圖 ........................................................ 39 附錄Ⅳ:避雷針保護(hù)范圍計(jì)算 .................................... 40 總 結(jié) ....................................................................... 41 后 記 ....................................................................... 42 參 考 文 獻(xiàn) ............................................................. 43 武漢大學(xué)珞珈學(xué)院本科畢業(yè)論文 1 前 言 隨著我國國民經(jīng)濟(jì)的穩(wěn)步增長,各行各業(yè)對電網(wǎng)安全運(yùn)行的可靠性要求也越來越高,并且供電量保持逐年增長,這對城配網(wǎng)的安全可靠運(yùn)行要求越來越高。 2) 靈活性:其含義是電氣主接線能適應(yīng)各種運(yùn)行方式(包括正常、事故和檢修運(yùn)行方式) 并能方便地通過 操作實(shí)現(xiàn)運(yùn)行方式的變換而且在基本一回路檢修時(shí),不影響其他回路繼續(xù)運(yùn)行,靈活性還應(yīng)包括將來擴(kuò)建的可能性。對比以上三種方案,從經(jīng)濟(jì)性、可靠性等多方面因素考慮,最佳設(shè)計(jì)方案為方案(一)。 圖 35KV 電壓側(cè)接線方案 10kV 電氣主接線 《 35~ 110kV 變電所設(shè)計(jì)規(guī)范》規(guī)定,當(dāng)變電所裝有兩臺(tái)主變壓器時(shí), 6~ 10kV側(cè)宜采用分段單 母線。 圖 1. 6 單母線分段接線 圖 1. 7單母線接線 對圖 及圖 所示方案Ⅰ、Ⅱ綜合比較,見表 12。首先必須要計(jì)算各側(cè)的負(fù)荷,包括站用電負(fù)荷(動(dòng)力負(fù)荷和照明負(fù)荷)、 10kVφ負(fù)荷、35kV 負(fù)荷和 110kV 側(cè)負(fù)荷。 8% 38. 5177。 (2)進(jìn)行網(wǎng)絡(luò)變換。(MVA) f1 三相短路 f2 三相短路 f3 三相短路 f339。接口的絕緣水平應(yīng)按電網(wǎng)中出現(xiàn)的各種過電壓和保護(hù)設(shè)備相應(yīng)的保護(hù)水平來確定。 ,以保證過電壓及相間閃絡(luò)的情況下,不致引起擊穿而危及工作人員 的安全。 電流互感器的配置和選擇 ( 1) 技術(shù)條件 正常工作條件 —— 一次回路電流,一次回路電壓,二次回路電流,二次回路電壓,二次側(cè)負(fù)荷,準(zhǔn)確度等級(jí), 短路穩(wěn)定性 —— 動(dòng)穩(wěn)定倍數(shù),熱穩(wěn)定倍數(shù) 承受過電壓能力 —— 絕緣水平,泄露比 ( 2) 環(huán)境條件 環(huán)境溫度,最大風(fēng)速,相對濕度。 35kV 母線 PT選擇 : 3511KV 配電裝置安裝臺(tái)單相電壓互感器用于測量和保護(hù)裝置。為保護(hù)主 變壓器中性點(diǎn)絕緣,在主變 110KV 側(cè)中性點(diǎn)裝設(shè)氧