freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

20xx年補償貿易合同范本2篇(留存版)

2025-03-15 03:05上一頁面

下一頁面
  

【正文】 務
  貨物到達甲方口岸后,由甲方自行安裝,但在主要設備安裝過程中,甲方認為需要時,乙方必須派出技術人員進行現(xiàn)場指導,提供必要的技術服務,在此過程中由于技術上的問題,所造成的損失由乙方負責。仲裁費用由敗訴一方負擔。
  六、支付條件
  由甲乙雙方對開信用證,即由乙方分期開出以甲方為受益人的遠期信用證,分期、分批支付全部產品的價款。出運后,將全套正本貨運單據:全套潔凈裝船提單(正本_________份,副本_________份)。在中國的一切費用均由乙方承擔。
  。
  、水災、臺風和地震或其他雙方同意的事件而影響執(zhí)行合同時,雙方同意延長合同期限,延長時間相當于事故所影響的時間。有效期為_________年,自_________年_________月_________日至_________年_________月_________日。
  二十五、爭議的處理
  。本合同生效后即對合同雙方具有法律約束力。
  ,均應按合同條款承擔違約責任,賠償由此造成的經濟損失,并向對方支付該項貨款總值的_________%的罰款。
  ,乙方應在到貨后_________月內書面通知甲方。
  八、保險
  產品進口以后由甲方投保。
  三、裝運
 ?。篲________年_________月_________日至_________年_________月_________日。
  第十條 履約保證
  為保證合同條款的有效履行,雙方分別向對方提供由各自一方銀行出具的保函,予以擔保。
  第三條 償付期限
  甲方用_________年零_________個月,分月和商品償付全部機械設備的價款。資料共分享,我們負責傳遞知識。當乙方支付的貨款不能相抵甲方所開的遠期信用證之金額時,其差額部分由乙方用預付貨款方式,在甲方所開的遠期信用證到期前匯付甲方,以使甲方能按時議付所開的遠期信用證。
  第八條 保險
  設備進口以后由乙方投保。while the products provided by party a as a make up payment for the machinery supplied by party b shall be first priced in terms of rmb as orher similar exports at the time the contract is made and then the prices in rmb shall be turned into those in _________ above mentioned according to the current exchange rate at the time.
  article 5 interest rate
  party a shall pay the interest on its long term l/c and the down payment of party annual interest rate is agreed upon at _________%.
  article 6 technical service
  after arrival at the destination port,the machinery shall be assembled by party party a believes it is necessary ,party b shall send its technicians to provide onthespot instructions and other required technical assistance during the course of assembling. party b shall be liable for the losses incurred in the coures fo assembling as a result of technical default of its prat.
  after approval by both parties, party b shall send a group of technicians to china to faciliate the pletion of the project. the cost incurred in china shall be borne by party b.
  article 7 additional equipment
  in the course of implementing the contract if it is foun necessary that ,in addition to the machinery and accessories already listed in the provisions, some additional items of the equipment and measuring and testing apparatus are needed, an additional order shall be agreed upon through negotiation .the items thus added shall be incorporated in the contract.
  article 8 insurance
  after being delivered in china, the machinery and its supporting equipment shall be insured by party b. the unforeseen losses in connection with the equipment shall be indemnified for by the insurance pany first to the insurer (party b) in case the equepment has already been paid off for and thus transferred into party a’s a proportional part of the sum paid by the insurance pany shall be allotted to party a to cover the payment party a has already made for the items of equipment involved the losses.
  article 9 liability for breach
  either party shall be liable for a breach of contract in accordance with the provisions in the contract and shall indemnify for all the losses thus if party b should fail to make purchase of the products to be delivered by party a as make up payment , or
點擊復制文檔內容
范文總結相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1