【正文】
rn sides of the Huahai building foundation education soil nailing wall and its construction and monitoring. Article 2 for the project design, and the design of pile foundation.First there were seven chapters, the fourth chapter, the fifth chapter, the sixth chapter as the main content. Through the analysis of the project profile, the supporting scheme selection principle, basis and method, the soil nailing support scheme. First to determine the specific parameters of soil nailing, including the stability analysis and calculation, the soil nailed soil pressure to decorate, then the stability checking: local stability and overall stability checking. Among them, soil nail specific parameters is the key. Construction scheme and the soil nailing later in order to guarantee the safety in the process of the construction of soil nail and monitoring , therefore, the author has made specific provision for the construction and monitoring program.Article 2 is the project design,Via the studying the knowledge of the pile foundation, and the building codes, the author has pleted the final design.Keywords pit soil nail stability the pile foundation 目錄第一篇 黃島華海大廈基坑土釘墻設(shè)計 1第一章 緒論 1 1 3 5 8第二章 工程概況 10 10 場地水文地質(zhì)條件 11 11第三章 支護方案的選擇 13 1原則和方法 14 18第四章 支護體系具體支護參數(shù)確定 20 20 24: 29: 29 37第五章 施工組織設(shè)計 40 40 40 41 43第六章 基坑監(jiān)測方案設(shè)計 46 46 46 47第七章 施工安全與對策 54 54 54 54第一篇 黃島華海大廈基坑土釘墻設(shè)計第一章 緒論隨著我國經(jīng)濟的迅猛發(fā)展,各個城市的高層建筑大量涌現(xiàn)。摘 要本文共有兩篇,第一篇為主設(shè)計,即華海大廈基坑南北兩側(cè)的土釘墻支護及其施工、監(jiān)測。第二篇是專題設(shè)計,通過對樁基礎(chǔ)的了解和學(xué)習(xí),并結(jié)合建筑規(guī)范,完成了最終的設(shè)計。 (3)在較軟弱的地基上、高水位及其它復(fù)雜場地條件下開挖基坑,很容易產(chǎn)生土體滑移、基坑失穩(wěn)、樁體位移、坑底隆起、支擋結(jié)構(gòu)嚴重漏水、流土以致破損,對周圍建筑物、地下構(gòu)筑物、管線造成很大影響。因此,對這些確定性因素的研究,以減小深基坑工程施工中的事故率,保證周邊環(huán)境的安全成為一個迫切的課題。在安全前提下,設(shè)計要合理,又能節(jié)約造價、方便施工、縮短工期。70年代,產(chǎn)生了相應(yīng)的只靠開挖的法規(guī)。這些經(jīng)驗可能比常規(guī)理論計算方法更為重要。人們將重視發(fā)展考慮空間效應(yīng)和時間效應(yīng)的土壓力理論。將采集的信息作為已知量,通過分析推求較符合實際的土質(zhì)參數(shù),并通過所推球的較符合實際的結(jié)果預(yù)測下一階段支護結(jié)構(gòu)及土體的形狀。這種時空效應(yīng)對于軟土地區(qū)來說更為敏感。 (2)基坑開挖面積大,長度與寬度達到百米的占相當比例,給支護系統(tǒng)帶來困難。基坑工程是系統(tǒng)工程,在施工過程中應(yīng)加強監(jiān)測,力求實行信息化施工。第4層:粉質(zhì)粘土:灰黑色,軟塑~可塑,含大量淤泥和粗砂,具有腥臭味,見少量貝殼碎片。中粗粒結(jié)構(gòu),塊狀構(gòu)造,主要礦物成分分為石英、長石,結(jié)構(gòu)大部分破壞,列細分與,風(fēng)化強烈,干鉆不易鉆進,巖心呈砂狀及碎石狀,巖體破碎,巖石堅硬程度為軟巖,巖體基本質(zhì)量等級為V級。南北兩側(cè)建筑物均為樁基礎(chǔ),南北兩側(cè)地下管線距離基坑變現(xiàn)較近,東側(cè)及西側(cè)環(huán)境較為空曠。(2)實體重力式支護結(jié)構(gòu)。采用土釘墻結(jié)構(gòu),適用性較大,各地已有大量應(yīng)用實體重力式支護結(jié)構(gòu)的工程經(jīng)驗。(4)環(huán)境條件:①基坑周圍的地區(qū)性質(zhì)。(5)建筑的結(jié)構(gòu)(地上及地下)對基坑施工的特殊要求。 支護結(jié)構(gòu)選擇的基本原則我國的東北、華北地區(qū),以及西北的大部分地區(qū)的地基土多為一般黏性土,并且多數(shù)地區(qū)的地下水較深。(4) (5)對基坑邊土體水平位移控制要求較高,或軟塑至流塑狀土質(zhì)不宜采用此方法開挖重力式擋土墻(1) (1)基坑周圍不具備放坡條件,但具備重力式擋墻的施工寬度。(2)土層內(nèi)富含地下水或可塑以下軟弱土層,不宜采用土釘支護。且施工場地狹小。(2)土釘置入現(xiàn)場土體后,如果土體不變形,土釘就不會受力。土體破壞面上的土釘或者受拉屈服,或者被拔出。國內(nèi)的測試結(jié)果也大體相同。:。 ——第j根土釘抗拉承載力設(shè)計值,按 (4—6) 計算。對于第2道土釘承受的土壓力,為第1道土釘與第2道土釘間距一半的位置處到到第2道土釘與第3道土釘間距一半的位置處之間的土壓力之和。(4) 綜上所述,經(jīng)修正后,第一單元土釘如下表:表4—7 土釘分布表序號標高(m)水平間距(m)入射角度直徑(mm)110130210130310130410130長度(m)鋼筋自由段(m)錨固段(m)111φ25101φ25151φ3281φ32(5) 土釘分布如下圖所示:圖4—6:(1) 局部穩(wěn)定性驗算具體計算過程如第一支護單元,結(jié)果見下表: 表4—8 土釘受力表土釘序號(m)(KPa)(m)(m)001234(2) 計算土釘長度:a) 錨固段長度:b)土釘自由鍛長度,根據(jù)幾何關(guān)系可得:=3m===c) 綜上所述,所得結(jié)果見下表:表4—9 土釘長度表土釘序號(m)(m)L(m)13234(3) 驗算土釘局部穩(wěn)定:計算過程與原理同第一支護單元。取=8m(4) 綜上所述,經(jīng)修正后,第二單元土釘如下表: 表4—1 土釘分布表序號標高(m)水平間距(m)入射角度直徑(mm)110130210130310130410130長度(m)鋼筋自由段(m)錨固段(m)3121φ32101φ32131φ3281φ32 (5) 土釘分布如下圖所示:圖4—7:a) 抗滑安全驗算: (4—13)式中:——抗滑穩(wěn)定安全系數(shù); ——圍墻后主動土壓力(KN); ——假設(shè)墻底斷面上產(chǎn)生的抗滑合力(KN)。本次基坑支護范圍為基坑的南北兩側(cè),支護總長度約為400m,根據(jù)場地巖土工程及周邊環(huán)境情況,需要對基坑進行支護及將水。風(fēng)量。微型樁成孔直徑130mm,下置108mm厚6mm無縫鋼管(通常),并在鋼管內(nèi)外均注入純水泥漿液,微型樁樁頂設(shè)置400400mm鋼筋混凝土冠梁,主筋φ22200(HRB235),箍筋φ8200(HPB235),主筋采用單面搭接焊接,焊條型號E4303,焊接搭接長度10d(d為主筋直徑),主筋與箍筋采用綁扎方式固定,混凝土強度C20,鋼管錨入冠梁200mm。集水井集水井布置沿基坑南北兩側(cè)均勻布置,僅靠基坑開挖邊線,按15m間距布置28個,以控制基坑開挖時的地下水。土釘桿件每隔2m設(shè)置一個導(dǎo)正支架,以保證桿件居中。工程集水井兼做施工用水井。(5)開挖過程中若發(fā)現(xiàn)地質(zhì)資料同勘察報告出入較大,或地下管線、尤其是上下水管等情況與設(shè)計條件差異較大時,應(yīng)及時報告設(shè)計人員以便對本設(shè)計做出調(diào)整。兩側(cè)建筑物均為樁基礎(chǔ)地下管線距基坑邊較近。檢測結(jié)果成為確定基坑開挖方案的重要依據(jù)。(2)深層水平位移監(jiān)測孔應(yīng)布置基坑邊坡、圍護墻周邊的中心處及代表性的部位,數(shù)量和間距是具體情況而定,但每邊至少應(yīng)設(shè)1個監(jiān)測孔。(6)基坑底部隆起監(jiān)測點一般按縱向或橫向剖面布置,剖面應(yīng)布置在基坑的中央、距坑底邊約1/4坑底寬度處以及其他能反映變形特征的位置,數(shù)量應(yīng)不少于2個。必要時,應(yīng)擴大監(jiān)測范圍。(b)監(jiān)測點宜布置在管線的節(jié)點、轉(zhuǎn)角點和變形曲率較大的部位,監(jiān)測點平面間距為15—25m,并宜延伸之基坑以外20m。(2) 監(jiān)測基準點設(shè)置3個,均設(shè)置在基坑邊線30m以外,必須可靠、穩(wěn)定、安全。 (7) 上述各種觀測工作均應(yīng)有經(jīng)驗豐富的具備資格的專業(yè)技術(shù)人員完成。 信息反饋通過日報、周報、總結(jié)報告完成。(d)各監(jiān)測項目監(jiān)測值的變化分析、評價及發(fā)展預(yù)測。、地下室施工期間,實現(xiàn)降水連續(xù)作業(yè),現(xiàn)場配備5臺備用潛水泵,以滿足施工需求。