【正文】
fications, according to the basic information and given the characteristics of concrete face rockfill dam for flood regulating calculation, the total selection in the design of the four kinds of solutions, through the bined with the downstream flood control requirements for flood regulating calculation, and economic factors, finally four options, which chooses the plan of dam is 75 m wide. This design mainly for flood regulating calculation, design, design of spillway, the surface spillway dam partition line, dam seepage analysis and dam body stability calculation. The design and arrangement of the spillway in the Banks of the river on the right bank of the river, spillway was right in the groove. m high dam, the upstream dam slope degree is , the downstream slope dam axis length of m, decorate in the bend. This scheme by the dam seepage calculation, stability analysis and meet the requirements. Keywords: concrete face rockfill dam, flood routing, design of dam body ,seepage calculation, Stability calculation, The bank spillway 目 錄 摘要 ...................................................................................................................... I ABSTRACT...................................................................................................... II 第 1章 工程基本資料 ...................................................................................3 流域概況及樞紐任務(wù) ..........................................................................3 設(shè)計(jì)要求 ..............................................................................................2 樞紐設(shè)計(jì)基本資料 ..............................................................................2 第 2章 調(diào)洪計(jì)算 ............................................................................................8 .................................................................................................8 ...............................................................................................13 第 3章 壩址選擇及樞紐布置 ..................................................................15 壩址及壩型選擇 ..................................................................................15 樞紐總體布置 ......................................................................................15 ...................................................................................16 .......................................................................................16 、趾板設(shè)計(jì) .......................................................................20 .......................................................................................22 第 4章 壩體計(jì)算 ..........................................................................................24 ...............................................................................................24 .......................................................................................30 .......................................................................................37 第 5章 壩基處理 ..........................................................................................39 ...............................................................................................39 細(xì)部構(gòu)造設(shè)計(jì) ......................................................................................39 第 6章 溢洪道設(shè)計(jì) .....................................................................................42 .......................................................................................42 ...........................................................................................42 ...........................................................................................42 ...................................................................................44 結(jié) 語 .................................................................................................................51 參考文獻(xiàn) ..........................................................................................................66 謝 辭 .................................................................................................................67 第 1 章 工程基本資料 流域概況及樞紐任務(wù) 流域概況 虞江位于我國西南地區(qū),流向自東向西北,全長(zhǎng)約 122 公里,流域面積 2558 平方公里,在壩址以上流域面積為 780 平方公里。本設(shè)計(jì)中河岸溢洪道布置在河流右岸,為正槽溢洪道。 1)發(fā)電 裝機(jī) 24MW,多年平均發(fā)電量為 億度。/s。 4)進(jìn)行細(xì)部 構(gòu)造設(shè)計(jì)和地基處理設(shè)計(jì),包括:混凝土標(biāo)號(hào)分區(qū)、分縫、止水、廓道、排水以及開挖、清理、灌漿、斷層處理等,并繪制有關(guān)設(shè)計(jì)圖。附近 A站最豐水年年平均流量為 315m179。/s 4 頻率 設(shè)計(jì)代表年徑流年內(nèi)分配 6月 7 月 8 月 9 月 10月 11月 12月 1 月 2 月 3 月 4 月 5 月 10% 270 578 842 695 416 715 263 162 101 127 25% 353 368 983 494 462 335 220 150 117 50% 277 527 618 510 325 198 168 133 75% 372 348 423 359 192 307 165 100 90% 150 372 501 309 187 115 101 表 15 壩址設(shè)計(jì)洪水成果表 頻率 % 1% 2% 5% 10% 流量( m179。 推移質(zhì)輸沙量按懸移質(zhì)輸沙量的 7%計(jì)為 286 萬噸,則該壩址多年平均輸沙總量為 4370 萬 t。 N14b(Ⅲ線 )以灰?guī)r碎屑為主,以鈣質(zhì)膠結(jié)為主,巖石強(qiáng)度較高:弱風(fēng)化上部( 180m 高程以上)單軸濕抗壓強(qiáng)度 Rb=~ , bR =,軟化系數(shù) ~ ,平均 ,屬偏軟的中硬巖;( 180m 高程以下)弱風(fēng)化下部~微風(fēng)化帶巖石單軸濕抗壓強(qiáng)度 Rb=~ , bR =,軟化系數(shù) ~,平均 ,屬偏硬的中硬巖。/s) 時(shí)間( t) 洪峰流量( m179。/s); 2q ──計(jì)算時(shí)段末的下泄流量( m179。 3.根據(jù)公式即可求得此時(shí)對(duì)應(yīng)的水頭 H 和上游水位 Z。/s,對(duì)應(yīng)上游水位 z=。 壩型選擇 壩型選擇應(yīng)綜合考慮下列因素,經(jīng)技術(shù)經(jīng)濟(jì)比較確定: 1.壩址區(qū)河勢(shì)地形、壩址基巖、覆蓋層特征及地震烈度等地形地質(zhì)條件; 2.筑壩材料的種類、性質(zhì)、數(shù)量、位置和運(yùn)輸條件; 3.施工導(dǎo)流、施工進(jìn)度與分期、填筑強(qiáng)度、氣象條件、施工場(chǎng)地、運(yùn)輸條件和初期度汛等施工條件; 4.壩高:高壩多采用土質(zhì)防滲體分區(qū)壩,低壩多采用均質(zhì) 壩,條件合適時(shí)宜采用混凝土面板堆石壩; 5.樞紐布置、壩基處理以及壩體與泄水、引水建筑物等的連接; 6.運(yùn)行條件:如對(duì)滲漏量要求高低,上、下游水位變動(dòng)情況,分期建設(shè)等; 7.壩及樞紐的總工程量、總工期和總造價(jià)。 2.泄水建筑物 ——河岸溢洪道 泄洪采用 河岸溢洪道方案,溢洪道布置在大壩右岸。 鑒于 該河流 本流域大部分為山嶺地帶,山脈、盆地相互交錯(cuò)于其間,地形變化劇烈,流域內(nèi)支流很多,但多為小的山區(qū)河流, 地表大部分為松軟沙巖、頁巖、玄武巖及石灰?guī)r的風(fēng)化層,汛期河流含沙量較大,沖積層較厚,兩岸有崩塌現(xiàn)象。 RK —— RK 的表達(dá)式如下: QNMthK R )()( ??? ( 35) 2/12/1%121 ??????????????????mmm LHthhLmM ? ( 36) 18 ??????????????mmmmmmLHshLH