【正文】
select two different types that are piles adding the support and underground continuous wall adding the support . We use the Equivalent Beam method to calculate the pile internal forces. But we use the Shanjianbangnan method to calculate the underground continuous wall’s internal simplify the internal supports into hinged supports and calculate by the equivalent beam method. we turn out to be a statically indeterminate structure,we can calculate the internal forces and reinforcement. When we calculate by the Shanjianbangnan method, we make slicing excavation. After the first excavation, the first wall’s force and bending moments that the wall will be calculated by torque balance and internal forces balance calculations. We get the biggest bending moment and the biggest force until the last excavation by upper step one by one. After the pletion of the internal force calculation ,antiuplift and the impermeability stability checking should be taken. In the end, we verify the correctness of the results for excavation by using Lizheng software. 目 錄 第一章 工程基本情況 ....................................................1 第一節(jié) 工程概況 ..................................................1 第二章 基坑支護(hù)型式、降水方案確定 ....................................3 第一節(jié) 基坑支護(hù)形式選取 ...........................................3 第二節(jié) 基坑降水方案確定 ..........................................5 第二章 基坑降水計(jì)算 ...................................................6 第一節(jié) 基坑降水井計(jì)算 .............................................6 第二節(jié) 基坑降水井布置 ............................................8 第四章 排樁支護(hù)計(jì)算 .................................................10 第一節(jié) 土壓力計(jì)算 ................................................10 第二節(jié) 排樁設(shè)計(jì) ................................................17 第三節(jié) 冠梁、腰梁設(shè)計(jì) ...........................................27 第四節(jié) 內(nèi)撐、立柱設(shè)計(jì) ...........................................30 第五章 穩(wěn)定性驗(yàn)算 ...................................................31 第一節(jié) 亢隆起穩(wěn)定性驗(yàn)算 ..........................................31 第二節(jié) 地下水滲透穩(wěn)定性驗(yàn)算 ......................................33 第六章 地下連續(xù)墻設(shè)計(jì) ...............................................34 第一節(jié) 地下連續(xù)墻內(nèi)力計(jì)算 ........................................34 第二節(jié) 地下連續(xù)墻計(jì)算 (南 ) .......................................39 第三節(jié) 地下連續(xù)墻墻身設(shè)計(jì) .......................................41 第四節(jié) 冠梁、腰梁設(shè)計(jì) ...........................................43 第五節(jié) 內(nèi)撐、立柱設(shè)計(jì) ...........................................45 第五章 穩(wěn)定性驗(yàn)算 ...................................................46 第一節(jié) 亢隆起穩(wěn)定性驗(yàn)算 ..........................................46 第二節(jié) 地下水滲透穩(wěn)定性驗(yàn)算 ......................................48 致謝 ..................................................................49 參考文獻(xiàn) ..............................................................50 1 第一章 工程基本情況 第一節(jié) 工程概況 貴陽(yáng)影視城及商辦綜合樓位于貴陽(yáng)市小十字富水南路與中山路口50m 處,地上二十四層,裙樓五層,地下室兩層,共二十六層,建筑物高度 93. 60m, 采用鋼筋混凝土框架一剪力墻結(jié)構(gòu),建筑物長(zhǎng) 36. 50m,寬 32. 00m,總建筑面積 18295. 0m2。 4)基巖:是三疊系松子坎組地層 (T2sz),巖性為灰色、淺黃色薄一中厚層泥質(zhì)自云巖、泥質(zhì)灰?guī)r與泥巖互層,未鉆穿,γ =27kN/m3 ,c=,φ =27176。常采用的開挖方式為放坡開挖。 在這些圍護(hù)結(jié)構(gòu)的類型中其各自的優(yōu)缺點(diǎn)為: 1)鋼板樁:鋼板樁由工廠預(yù)制而成,其強(qiáng)度、品質(zhì)、接縫精度 等質(zhì)量保證,可靠性高;具有耐久性,可回?fù)苄拚谶M(jìn)行使用;與多道鋼支撐結(jié)合,適合軟土地區(qū)的較深基坑;施工方便,工期短;施工中須注意接頭防水,以防止樁縫水土流失所引起的地層塌陷及失穩(wěn)問(wèn)題;鋼板樁剛比排樁和地下連續(xù)墻小,開挖后撓度變形較大;打拔樁震動(dòng)噪聲大,容易引起土體移動(dòng),導(dǎo)致周圍地基較大沉陷; 2)預(yù)制混泥土板樁:施工方便、快捷、造價(jià)低、工期短;可與主體結(jié)構(gòu)結(jié)合;打樁振動(dòng)及擠土對(duì)周圍環(huán)境影響較大,不適合在建筑物密集城市使用;接頭防水性差;不適合在地下水較高的地方施工; 3)主樁橫列式板:施工方便,造價(jià)低,適合開挖 寬度較窄深度較淺的市政排管工程;止水性差,軟弱地基施工容易產(chǎn)生坑底隆起和覆土后的沉降;容易引起周圍地基沉降; 4)鉆孔灌注樁:噪聲和振動(dòng) 4 小,剛度較大,就地澆制施工,對(duì)周圍環(huán)境影響??;適合軟弱地層使用;整體剛度較差,不適合兼作主體結(jié)構(gòu); 5)挖孔灌注樁:施工方便,造價(jià)低廉,成樁質(zhì)量容易保證;不能用于地下水位以下和不穩(wěn)定地層; 6)地下連續(xù)墻:施工噪聲低,振動(dòng)小,就地澆制,墻接頭止水效果較好,整體剛度大,對(duì)周圍環(huán)境影響??;適合于軟弱地層和建筑設(shè)施密集城市市區(qū)的深基坑;墻接頭構(gòu)造有剛性和柔性兩種類型;施工的基坑范圍可達(dá) 基地紅線,可提高建筑物的使用面積;泥漿處理,水下鋼筋混泥土澆制的施工工藝較復(fù)雜,造價(jià)較高; 7)水泥攪拌樁:適合于軟土地區(qū)、環(huán)境保護(hù)要求不高的基坑;施工低噪聲、低振動(dòng),結(jié)構(gòu)止水性較好,造價(jià)經(jīng)濟(jì);圍護(hù)擋墻較寬,一般需 3 到 4 m; 8)高壓旋噴樁擋墻:施工低噪聲、低振動(dòng)、對(duì)周圍環(huán)境影響小,止水性好;施工需作排污處理,工藝復(fù)雜、造價(jià)高;作為圍護(hù)結(jié)構(gòu)的止水加固措施、旋噴樁深度可達(dá) 30m;9) SMW 工法:施工低噪聲,對(duì)周圍環(huán)境影響?。唤Y(jié)構(gòu)止水性好結(jié)構(gòu)強(qiáng)度可靠,適合于各種土層,配以多道支撐,可適用于深基坑; 10)灌注樁與攪 拌樁結(jié)合:灌注樁作受力結(jié)構(gòu),攪拌樁作止水結(jié)構(gòu);適用于軟弱地層中的挖深小于等于 12m,當(dāng)開挖深度超過(guò) 12m 且地層可能發(fā)生流砂時(shí),要慎用;施工低噪聲,低振動(dòng),施工方便,造價(jià)經(jīng)濟(jì),止水效果好; 11)預(yù)制樁與錨桿結(jié)合、預(yù)制樁與內(nèi)撐結(jié)合、預(yù)制樁與土釘結(jié)合、地下連續(xù)墻與內(nèi)撐結(jié)合等等這些組合式圍護(hù)結(jié)構(gòu)他們兼具有兩種結(jié)構(gòu)的特點(diǎn),并且可支護(hù)基坑的深度較其中任何一種深,且安全系數(shù)高。綜上所述,在本基坑中不能采用放坡開挖,不能采用土釘、錨桿的圍護(hù)結(jié)構(gòu),也不能采用單一的圍護(hù)結(jié)構(gòu)而要采用組合式圍護(hù)結(jié)構(gòu),故采用地下連續(xù)墻加二至三到內(nèi)支撐 其中地下連續(xù)可做永久結(jié)構(gòu)或者采用灌注樁與攪拌樁結(jié)合,設(shè)二至三道內(nèi)撐。因此我們采用坑內(nèi)降水,在坑外設(shè)置幾口觀測(cè)井。 基坑的長(zhǎng)寬之比: 基坑的長(zhǎng): a= m,基坑的寬: b= m。, 飽和重度 γ sa t =20kN/m3.基巖,厚度未鉆穿,天然重度 γ =27kN/m3,c=, Φ = 2 7 176。, 飽和重度 γ sat =20kN/m3.淤泥質(zhì)土,厚度h 1 = 4 m ,天然重度 γ =,c=, Φ = 6 176。, 飽和重度 γ sat = 1 8 . 5 k N / m 3 .紅粘土,厚度h 1 = 3 m ,天然重度 γ = 1 7 . 8 k N / m 3 ,c = 1 6 . 0 k P a , Φ = 1 0 176。,飽和重度 γ sat =20kN/m3.基巖,厚度未鉆穿,天然重度 γ =27kN/m3,c=, Φ =27176。, 飽和重度 γ sat =2 7k N/ m3 .q= 20 kP a q=100 k P a圖八 基坑南側(cè)超載圖 15 如上圖所示超載,其在 8m 處開始影響土壓力分布,其轉(zhuǎn)化為標(biāo)準(zhǔn)值時(shí),2 kpa? ? 。 17 第二節(jié) 排樁設(shè)計(jì) 將排樁直徑取為 800mm,排樁間距為 ,混凝土采用 C30 混凝土,縱筋采用 HRB335 鋼筋,箍筋采用 HPB235 鋼筋。 : 支護(hù)樁沿周邊均勻配筋,則其應(yīng)符合下列規(guī)定: 3 s i n s i n2 s i n3 tc y s sM f A r f A r ? ? ? ????? ??? s in 21 ( ) 02c t y sf A f A??? ? ?????? ? ? ????? 2t???? 式中: M— 樁的彎矩設(shè)計(jì)值( KN 箍筋配置: 箍筋采用 HPB235 級(jí)鋼筋 每根樁所受到的剪力為: 1 .6 3 2 6 .1 5 2 1 .8kV kN? ? ? 所受到的剪力設(shè)計(jì)值為: 0 1 . 1 1 . 2 5 5 2 1 . 8 6 5 2 . 2 5FkV V k N??? ? ? ? ? 驗(yàn)算截面尺寸: 圓形截面根據(jù)《建筑基坑支護(hù)技術(shù)規(guī)程》 JGJ1202020 所規(guī)定,應(yīng)代為有效矩形計(jì)算,則截面寬度( b)為 和截面有效高度( h0)為 。當(dāng)嵌入深度大于 時(shí),基巖層才給于排樁主動(dòng)土壓力。 m 支護(hù)樁截面面積: ? 計(jì)算時(shí)先假設(shè)鋼筋根數(shù)為 8 根,鋼筋直徑為 25,則鋼筋截面面積為: 23927sA mm? 。 冠梁鋼筋應(yīng)符合現(xiàn)行國(guó)家標(biāo)準(zhǔn)《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》 GB50010 對(duì)梁的構(gòu)造配筋要求。 其內(nèi)撐、角撐布置如下圖: 28 內(nèi)撐布置 圖 如上圖可知,腰梁的最大間距 ,則所受到的最大彎矩:21 1 . 2 5 4 0 7 8 . 1 2 7 8 212M k N m? ? ? ? ? 采用全封閉鋼圍檁 HW300 300 10 15( Q235)。 (公式 ) ( 1) / tancqNN ??? (公式 ) 式中: Khe—抗隆起安全系數(shù);安全等級(jí)為一級(jí)、二級(jí)、三級(jí)的支護(hù)結(jié)構(gòu), Khe分別不應(yīng)小于 、 、 ; γ m1—基坑外擋土構(gòu)件底面以上土的重度( KN/m3);對(duì)地下水位以下的砂土、碎石土、粉土取浮重度;對(duì) 多層土取各層土按厚度加權(quán)的平均重度; γ m2—基坑內(nèi)擋土構(gòu)件底面以上土的重度( KN/m3);對(duì)地下水位以下的砂土、碎石土、粉土取浮重度;對(duì)多層土取各層土按厚度加權(quán)的平均重度; D—基坑底面至擋土構(gòu)件底面的土層厚度( m); h