freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

公寓樓設(shè)計(jì)計(jì)算書-文庫吧在線文庫

2025-07-30 23:53上一頁面

下一頁面
  

【正文】 :GA=縱向框架梁自重及粉刷 縱向框架梁傳來的樓面恒荷載 +(12+)3/2=次梁粉刷、自重及傳來的樓面恒荷載 +=木門自重 2=墻體自重 ()18=墻面粉刷 2()17=框架主自重及粉刷 +=:GB= (5)恒荷載作用下的機(jī)構(gòu)計(jì)算簡圖圖32恒荷載作用下結(jié)構(gòu)計(jì)算簡圖 單位(kN) 活荷載計(jì)算(1)屋面活荷載 kN/m2,按上人的承重鋼筋混凝土屋面活荷載標(biāo)準(zhǔn)值為2 kN/m2,取較大值 (2)樓面活荷載樓面活荷載標(biāo)準(zhǔn)值 kN/m2,== kN/m屋面框架梁線荷載標(biāo)準(zhǔn)值 p5AB===(3)活荷載作用下的結(jié)構(gòu)簡圖圖33活載作用下的結(jié)構(gòu)計(jì)算簡圖 單位(kN)(基本風(fēng)壓= kN/m2)風(fēng)壓標(biāo)準(zhǔn)值計(jì)算公式ωk=βzμsμzω0,30m,, 查荷載規(guī)范,將風(fēng)荷載換算成作用于框架每層節(jié)點(diǎn)上的集中荷載,計(jì)算過程如表31所示表31 框架每層節(jié)點(diǎn)上換算集中風(fēng)荷載層次βzμsZ(m)μzωo (kN/m2)A(m2)Pw(kN)五層四層三層二層一層注:Z為框架節(jié)點(diǎn)至室外地面的高度。 Z3 V33= kNZ4 V34= kN2層 Z1 V21= kN 。m)圖39 底層結(jié)構(gòu)在恒載作用下的彎矩計(jì)算 單位(kNm)圖318 活載作用下底層彎矩計(jì)算 單位(kNm)二三四層結(jié)構(gòu)在重力荷載代表值作用下的彎矩計(jì)算圖331 中間層結(jié)構(gòu)在重力荷載代表值作用下的內(nèi)力計(jì)算 單位(kN177。177。177。177。177。0177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。(1)跨中下部受拉,按T形截面設(shè)計(jì)。 表314梁正截面配筋計(jì)算表樓層截面M(kN?m)ξA’s(mm2)As(mm2)實(shí)配As(mm2)A’s/As五10509329318,7632435218,50930509322318,76340509201218,509517218,509四1760772320,9422634222,76030760715320,94240509404218,5095210218,509三17601059420,12562647222,7603760889420,12564509555220,6285414218,509二17601211420,12562649222,76037601036420,12564628686320,9425586220,628一17601405422,15202739222,76037601086422,15204760773320,9425682222,7602.斜截面受彎承載力計(jì)算承載力抗震調(diào)整系數(shù)γRE=。柱的截面尺寸:底層為650650;其他層為600600。⑥,取Cm=⑦ξ≤2αS/h0,;,具體計(jì)算與配筋過程見下列兩表。通過幾個(gè)月來緊張而有序的設(shè)計(jì),提高了我分析和解決實(shí)際問題的能力,總結(jié)與提高了幾年來所學(xué)知識的,在理論上聯(lián)合了實(shí)際。通過畢業(yè)設(shè)計(jì)的鍛煉也使我明白處理不同難題的方法,在遇到難題時(shí)不能避而遠(yuǎn)之,應(yīng)該通過大量地查找資料、虛心向別人請教來解決。各位老師在繁忙的工作中抽出大量寶貴的時(shí)間對我的設(shè)計(jì)進(jìn)行指導(dǎo),為我提供大量資料參考,在我遇到疑難問題時(shí)及時(shí)給予解答,使我的設(shè)計(jì)能夠順利進(jìn)行。Quan and Brinbaum carried out a 3dimensiona1 puter simulation of impact and collapse of the WTC North Tower using AUT0DYN 3D puter program to numerically reproduce the entire event of impact and collapse of the North Tower of WTC on September model included the entire building of the WTC North Tower and a Boeing 767 passenger jet.The three—dimensional finite element model used in the simulation contained a total of 270000 beam and shell elements.All the columns on the perimeter wall as well as inside the central core were simplified,being modeled by beam elements instead of using solid elements or shell elements.Floors and roof were modeled by the AUTODYN shell solver.The Boeing 767 airplane was also modeled in detail using AUTODYN shell solver and Lagrange solver.In this section,the current methods for analyzing structural progressive collapse available in the literature are presented in two major categories,namely the direct simulation method and the alternative load path method. Direct simulation method For the direct simulation method,the building structures,air,and explosive are all modeled in detail.Explosion,blast wave propagation and its interaction with structures all need to be simulated,if not,blast and impact loads acting on the building structure should be derived and directly applied to structural ponents.The material nonlinear behavior and dynamic effects and damage due to blast or impact are mostly included in the simulation.This section will list typical applications of direct simulation method in progressive collapse analysis of building structures recently,each with its own characteristic. of building collapse under blast loads在此,請各位老師,專家給予批評指正。從中,我進(jìn)一步理解民用建筑設(shè)計(jì)原理和構(gòu)造的基礎(chǔ)知識,掌握建筑施工圖的設(shè)計(jì)方法和步驟,提高繪制和識別建筑施工圖的基本技能。④當(dāng)N≤;當(dāng)N>。② ea取20mm和h/30兩者中的較大值。BC跨梁 故截面尺寸滿足要求。因?yàn)?,故屬第一類截面?)構(gòu)造要求(1)承載力抗震調(diào)整系數(shù)γRE=(2)三級抗震設(shè)防要求,框架梁的混凝土受壓區(qū)高度x≤則x1≤=765=x2≤=565=(3)梁的縱筋最小配筋率:支座:%300765=(55) %300765=%300565=(55) %300565=所以:As1min=As2min=跨中:%300765=459mm2(45) %300765=%300565=339mm2(45) %300565=所以:As1min=459mm2As2min=339mm2(4)箍筋的配箍率箍筋的配筋率ρsvmin=ft/fyv=4)配筋計(jì)算因結(jié)構(gòu)、荷載均對稱,故整個(gè)框架采用左右對稱配筋。177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。177。m) 圖335 底層結(jié)構(gòu)在重力荷載代表值作用下的彎矩圖 單位(kNm)圖322 框架在活載作用下彎矩圖單位(kNm)圖313 框架在恒載作用下的彎矩圖 單位(kN Z3 V13= kNZ4 V14= kN計(jì)算結(jié)果見圖36圖36 地震作用下框架內(nèi)力 單位(kN Z4 V54=D54/D5= kN同理,4層 Z1 V41= kN 。1. 構(gòu)件截面假定及荷載計(jì)算;2. 變形驗(yàn)算。 屋面做法(瀝青卷材防水屋面)1. 瑪諦脂粘貼綠豆沙保護(hù)層2. 冷底子油一遍三氈四油防水層一道3. 20厚1:3水泥砂漿找平層4. 1:6水泥焦渣找2%坡度,最薄處30厚或結(jié)構(gòu)找坡5. 180厚水泥石板6. 鋼筋混凝土基層 外墻面做法1.20厚1:3水泥砂漿2.10厚1:1(重量比)水泥專用膠粘劑刮于板背面3.50厚聚苯板加壓粘牢,版面打磨成細(xì)麻面4.5.,并用抹刀將網(wǎng)壓入膠泥中6.一底二涂高彈丙烯酸涂料 內(nèi)墻做法1. 刷內(nèi)墻涂料2. 5厚1:,壓實(shí)趕光3. 5厚1:1:6水泥石灰膏砂漿掃毛4. 6厚1::4水泥石灰膏砂漿打底掃毛5. 刷加氣混凝土界面處理劑一道 樓面做法(無水樓面)1. 8mm~10mm厚鋪地磚樓面,干水泥擦縫2. 撒素水泥面(撒適量清水):4干硬性水泥砂漿結(jié)合層4. 20厚1:3水泥砂漿找平層 墻裙做法(油漆、乳膠漆、墻裙)1. 刷無光漆2. 6厚1:,壓實(shí)抹光3. 12厚1:1:6水泥石灰膏砂漿打底(兩邊成活)4. 刷加氣混凝土界面處理劑一道 地面做法(1) 100厚C15混凝土隨打隨抹上撒1:1水泥沙子,壓光抹光(2) (3) 素土夯實(shí)2. 水泥砂漿地面(廚、衛(wèi))(1) 20厚1:2水泥砂漿壓光抹光(2) 刷素水泥漿結(jié)合層一道(3) 60厚C20細(xì)石混凝土向地漏趙坡,最薄處不小于30厚(4) (5) 素土夯實(shí) 頂層做法1. 刷涂料2. 2厚紙筋灰罩面3. 6厚1:1:6水泥石灰砂漿4. 1::3水泥石灰砂漿擠入底灰中(無厚度)5. 3厚1:2:1水泥石灰膏砂漿(擠麻刀)打底(擠入網(wǎng)孔及板條縫內(nèi))鋼筋混凝土框架結(jié)構(gòu)是由梁,柱通過節(jié)點(diǎn)連接組成的承受豎向荷載和水平荷載的結(jié)構(gòu)體系。 第2章 建筑結(jié)構(gòu)方案的確定 建筑方案的確定 建筑特點(diǎn)本題目所設(shè)計(jì)的建筑類型為綜合性建筑。 國內(nèi)外研究現(xiàn)狀綜合性建筑就是把幾種不同的建筑功能有機(jī)的結(jié)合在一起。各種功能除了有自己的特點(diǎn)外一般都要求有使用的獨(dú)立性,同時(shí),彼此之間又相互影響、相互補(bǔ)充、相互聯(lián)系。所謂綜合性建筑,就是把幾種不同的建筑功能有機(jī)的組合在一起。墻體只起圍護(hù)和隔斷作用。3. 豎向荷載作用下的內(nèi)力計(jì)算;4. 風(fēng)荷載作用下的框架內(nèi)力計(jì)算;5. 地震作用計(jì)算;6. 地震作用下的框架內(nèi)力計(jì)算;7. 內(nèi)力組合及截面配筋計(jì)算;8. 現(xiàn)澆板、次梁配筋計(jì)算。 Z2 V42= kN 。m)表36 地震作用下框架的側(cè)向變形驗(yàn)算層次mm(kN)(kN)(kN)511
點(diǎn)擊復(fù)制文檔內(nèi)容
高考資料相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1