freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

2005年上半年信息系統(tǒng)項目管理師上午試卷-文庫吧在線文庫

2025-02-16 13:11上一頁面

下一頁面
  

【正文】 收益,選擇最佳的投資組合     C.組織應(yīng)該持續(xù)地評估和跟蹤項目組合的風(fēng)險和收益情況     D.項目組合管理是把項目合并起來進(jìn)行管理   ● 在項目管理當(dāng)中,下列關(guān)于間接管理的論述中正確的是間接管理___(56)___。 ?。?2)A.基于交換機(jī)端口劃分        B.基于網(wǎng)卡地址劃分     C.基于用戶名劃分          D.基于網(wǎng)絡(luò)曾地址劃分   ● 在距離矢量路由協(xié)議中,防止路由循環(huán)的技術(shù)是___(63)___。 they may also exert influence over the project and its results.  ___(67)___the initiation of the successor activity, depends upon the pletion of the predecessor activity.  ___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity.  (66) A.PDM        B.CPM       C.PERT      D.AOA  (67) A.FS        B.FF       C.SF       D.SS  (68) A.FS        B.FF       C.SF       D.SS   ● estimating schedule activity costs involves developing an ___(69)___ of the cost of the resources needed to plete each schedule activity. Cost estimating includes identifying and considering various costing example,in mostapplication areas,additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of ___(70)___ to facilitate parisons both within and across projects. the ___(71)___ describes important information about prject requirement that is considered duing cost estimating.  (69) A.a(chǎn)ccuracy   B.a(chǎn)pproxination   C.specification  D.summary  (70) A.a(chǎn)ctivity   B.work        C.currency     D.time  (71) A.project scope statement    B.statement of work     C.project management plan    D.project policy   ● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project can be simple or plex. ?。?9)A.信息系統(tǒng)集成項目 B.技術(shù)改造項目 C.管理變更項目 D.作業(yè)流實施項目   ● 當(dāng)以下條件同時滿足時,監(jiān)理方應(yīng)受理___(60)___提出的費(fèi)用索賠申請   1)索賠事件造成了承包單位直接經(jīng)濟(jì)損失   2)索賠事件是由于非承包單位的責(zé)任發(fā)生的   3)承包單位已按照施工合同規(guī)定的期限和程序提出費(fèi)用索賠申請表,并附有索賠憑證材料 ?。?0)A.業(yè)主    B.建設(shè)單位   C.承包單位    D.投資方     (49)A.買方主持的績效評審會議      B.回答潛在賣方的問題     C.確認(rèn)已經(jīng)進(jìn)行了合同變更      D.索賠管理   ● 在招標(biāo)過程中,下列中的___(50)___應(yīng)在開標(biāo)之前完成?!  ?質(zhì)量控制非常重要,但是進(jìn)行質(zhì)量控制也需要一定的成本,___(42)___可以降低質(zhì)量控制的成本。在某些情況下,進(jìn)度延遲變得嚴(yán)重時,為了確保獲得精確的績效衡量信息,項目經(jīng)理應(yīng)該盡快___(36)___。
點(diǎn)擊復(fù)制文檔內(nèi)容
試題試卷相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1