【正文】
案設(shè)計(jì)以及施工組織設(shè)計(jì),編制工程概算等。 本工程存在大壩外坡較陡,有滑坡現(xiàn)象,水庫(kù)右壩肩及庫(kù)岸存在滲漏現(xiàn)象,存在放水設(shè)施臥管滲漏嚴(yán)重、涵管管身斷裂、淤塞等問(wèn)題,大壩為三類壩。s eliminating and reinforcement is based on the actual project carrying out the preliminary design. The main elements of design, including review of hydrological design flood, peak flow, as well as review of the flood largest discharge capacity of the spillway ,dam seepage and stability analysis, eliminating and reinforcement design, anized construction design, the engineering budge etc. Hydrological calculation is mainly to work out the flood peak flow of the region for a return period of 20 years and 200 years , than make the calculation for adjusting in accordance with flood peak flow, and calculate the flood level for designing and checking , and finally verify the maximum discharge capacity of the spillway checked by the review is over the spillway Hong ability to meet regulatory requirements. Analysis of the seepage stability of dam is mainly used to determine the phreatic line within the dam and the location of downstream of the spill point, render the dam39。大壩下游控制約 300 口人、 750 畝耕地,是一座以灌溉為主,兼有防洪、養(yǎng)殖等綜合效益的?。?2)型水庫(kù)。 第 2頁(yè) 共 78 頁(yè) 設(shè)計(jì)洪水復(fù)核 本次設(shè)計(jì)根據(jù) 1/1 萬(wàn)地形圖勾繪了水庫(kù)自然集雨范圍及河流走勢(shì),量算復(fù)核了流域面積、集雨范圍干流河道長(zhǎng)度、綜合比降等參數(shù),在此基礎(chǔ)上采用四川省水電廳 1984 年 6月編制的《四川省水文手冊(cè)》及推理公式法進(jìn)行入庫(kù)洪水流量復(fù)核計(jì)算。 XXX 水庫(kù)位于 XX 市東北的云集鎮(zhèn)境內(nèi),按照地質(zhì)成因劃分,地貌類型屬構(gòu)造侵蝕丘陵區(qū)。 XXX 庫(kù)區(qū)位于 XX 市東北部,地質(zhì)構(gòu)造屬北東向擠壓帶與綿陽(yáng)帚狀構(gòu)造帶復(fù)合部位的東南邊緣地帶,位于水根頭—石元壩斷裂東南斷盤(pán)、天井山背斜東南翼。 地震 根據(jù)《中國(guó)地震動(dòng)參數(shù)區(qū)劃圖》 GB183062020 和 2020 年 6 月中國(guó)地震局發(fā)布的《四川、甘肅、陜西部分地區(qū)地震動(dòng)峰值加速度區(qū)劃圖、地震動(dòng)反應(yīng)譜特征周期區(qū)劃圖》,本區(qū)地震動(dòng)峰值加速度為 ,相應(yīng)地震基本烈度為 VII度。但因缺乏管理設(shè)施和維護(hù)資金,水庫(kù)一直存在一定的病險(xiǎn)。 ③ 水庫(kù)無(wú) 管理房,溢洪道上只有簡(jiǎn)易工作便橋,溢洪道底板和側(cè)墻襯砌損壞嚴(yán)重,防汛道路仍為泥土路面,不利于水庫(kù)的管理和維護(hù)。水庫(kù)原有管理房在地震期間全部損毀,無(wú)法居住。 施工組織設(shè)計(jì) 施工條件 XXX 水庫(kù)位于 XX 市云集鄉(xiāng)云豐村 XXX,距云集鄉(xiāng) 2km,距 XX市區(qū) 70km,外購(gòu)材料由 XX 市采購(gòu)到云集鄉(xiāng),再經(jīng) 2km機(jī)耕路運(yùn)至施工現(xiàn)場(chǎng),對(duì)外交通相對(duì)方便,但機(jī)耕路需拓寬整修,并結(jié)合施工修筑為泥結(jié)碎石永久防汛道路。 壩坡整修需培厚下游壩坡及回填粘土,可在大壩上游右側(cè)山坡 1km外取用,此處粘土質(zhì)量、數(shù)量均滿足要求。溢洪道修建漿砌石底板及側(cè)墻。風(fēng)、水、電、通訊系統(tǒng)的設(shè)置,臨時(shí)生產(chǎn)設(shè)施及生活福利設(shè)施的新建,建筑材料的備料等工作。 由于水泥、鋼筋、汽油、柴油等主材價(jià)格較高,且市場(chǎng)價(jià)格變化波動(dòng)較大,為控制和合理確定工程單價(jià),采用限 價(jià)方式進(jìn)入工程單價(jià),預(yù)算價(jià)超出部分作為價(jià)差,計(jì)入稅金后列入相應(yīng)部分。 總體而言, XX 市氣候溫暖濕潤(rùn),植被良好,土壤植被涵養(yǎng)降雨的能力較強(qiáng),對(duì)暴雨洪水有一定的衰減作用。 根據(jù)水利部頒發(fā)的《水利水電工程等級(jí)劃分及洪水標(biāo)準(zhǔn)》 SL2522020,本工程為?。?2)型水庫(kù),主要、次要建筑物為 5 級(jí),洪水標(biāo)準(zhǔn)為 20 年一遇設(shè)計(jì), 200 年一遇校核。 設(shè)計(jì)洪水復(fù)核 流域特征復(fù)核 根據(jù) 1/1 萬(wàn)地形圖勾繪 XXX 水庫(kù)自然集雨范圍及河流走勢(shì),并量算流域面積、集雨范圍干流河道長(zhǎng)度、綜合比降等參數(shù),并與《 XX 市小型水庫(kù)基本資料登記表》數(shù)據(jù)(簡(jiǎn)稱原數(shù)據(jù))相比較,結(jié)合現(xiàn)場(chǎng)查勘情況綜合分析,最終采用成果見(jiàn)表 ?,F(xiàn)場(chǎng)查勘表明現(xiàn)狀堰頂高程 ,堰寬 ,側(cè)墻及底板均采用漿砌石襯砌,但損毀嚴(yán)重,溢洪水流經(jīng)消能后泄入下游河道。壩址以上主河道長(zhǎng) ,河槽比降 ‰ 。 XXX 水庫(kù)工程特性見(jiàn)表 。主體建筑主要工程量為:土方開(kāi)挖 3286m3,土方回填 5664m3,砌石 2639m3,混凝土 54m3,生產(chǎn)橋梁1 座 33m2等。 防汛道路、管理房等其它工程由專業(yè)部門(mén)施工。干砌石和漿砌石要求塊石最短徑不小于 20cm,立砌并盡可能保持表面平整,干砌石以小石塊填縫塞實(shí),漿砌石要求座漿并保持吃漿飽滿。工程區(qū)附近有 380V動(dòng)力電源,距離約500m,能滿足施工給水、排水、振搗、照明等需要。 總體設(shè)計(jì)方案 根據(jù) XXX 水庫(kù)存在的問(wèn)題,擬定除險(xiǎn)加固總體設(shè)計(jì)方案為: 大壩:結(jié)合壩體防滲措施進(jìn)行內(nèi)坡干砌石防護(hù)處理;外坡培厚整修,清除草皮,修建貼 坡反濾排水體及排水溝,重新護(hù)砌;壩頂以泥結(jié)碎石硬化。但溢洪道的簡(jiǎn)易便橋過(guò)窄不便于工程日常管理維護(hù)及汛期搶險(xiǎn)物資的運(yùn)輸。 第 5頁(yè) 共 78 頁(yè) 應(yīng)急除險(xiǎn)方案 根據(jù)壩體出現(xiàn)的震損問(wèn)題,為確保樞紐安全,原溢洪道底板下挖,挖深后溢洪道采用漿砌石護(hù)砌。 ( 2)根據(jù)《中國(guó)地震動(dòng)參數(shù)區(qū)劃圖》 GB183062020 和 2020 年 6 月中國(guó)地震局發(fā)布的《四川、甘肅、陜西部分地區(qū)地震動(dòng)峰值加速度區(qū)劃圖、地震動(dòng)反應(yīng)譜特征周期區(qū)劃圖》,本區(qū)地震基本烈度為 VII度。上部為棕紅色泥質(zhì)粉砂巖,平行層理發(fā)育。的沖斷裂以及走向北西 50186。 溢洪道最大泄洪能力復(fù)核 經(jīng)壩頂超高計(jì)算, △ h設(shè) = , △ h校 =。現(xiàn)場(chǎng)查勘表明現(xiàn)狀堰頂高程,堰寬 ,側(cè)墻及底板均 采用漿砌石襯砌,但損毀嚴(yán)重,溢洪水流經(jīng)消能后泄入下游河道。具有冬季微寒,春來(lái)較早,夏長(zhǎng)秋短,無(wú)霜期長(zhǎng)以及冬干、春旱、夏洪、秋綿等氣候特點(diǎn)。然后用理正軟件 進(jìn)行 大壩在不同工況 下 滲流穩(wěn)定分析, 經(jīng)分析 大壩的滲流穩(wěn)定不滿足規(guī)范要求。 XXX 水庫(kù)除險(xiǎn)加固初步設(shè)計(jì)是根據(jù)實(shí)際工程進(jìn)行初步設(shè)計(jì), 主要內(nèi)容包括水文 計(jì)算 ,大壩滲流穩(wěn)定分析,除險(xiǎn)加固方案的設(shè)計(jì), 施工組織設(shè)計(jì), 工程概算等幾部分。s body and the distribution map of equipotential line within dam foundation, flow work diagram, determine the permeatal gradient of dam39。 XXX 水庫(kù)大壩為均質(zhì)土壩,最大壩高 12m,壩頂高程 ,壩頂寬 3m,大壩全長(zhǎng) 110m。計(jì)算結(jié)果為:Qm5%=, %=;設(shè)由設(shè)計(jì)暴雨推求洪水總量的方法復(fù)核 24 小時(shí)入庫(kù)水量,計(jì)算結(jié)果為: 20 年一遇 WP= 萬(wàn) m3, 200 年一遇 WP= 萬(wàn) m3。 第 3頁(yè) 共 78 頁(yè) XX 市處于新華夏系四川沉降盆地與龍門(mén)山隆起帶的復(fù)合部位,按照構(gòu)造型式分為北東向擠壓帶和綿陽(yáng)帚狀構(gòu)造,兩者呈不整合復(fù)合關(guān)系。 地層巖性 XX 市境內(nèi)地層出 露除元古界和第三系缺失外,古生界到第四系大部分地層均有出露,沉積厚度在 18000m以上。 第 4頁(yè) 共 78 頁(yè) 天然建筑材料 XXX 水庫(kù)工程所需天然建材主要為石料和粗砂,距 周邊地質(zhì)勘察報(bào)告及現(xiàn)場(chǎng)查勘訪問(wèn),選定庫(kù)區(qū)周邊石料場(chǎng),該處石料屬淺紅色層狀石英砂巖,易于開(kāi)采,儲(chǔ)量豐富,抗壓強(qiáng)度較高,可滿足本工程施工所需石料。根據(jù)本所對(duì)本工程所做安全鑒定報(bào)告,本工程存 在大壩外坡較陡,有滑坡現(xiàn)象,水庫(kù)右壩肩及庫(kù)岸存在滲漏現(xiàn)象,存在放水設(shè)施臥管滲漏嚴(yán)重、涵管管身斷裂、淤塞等問(wèn)題,大壩為三類壩。 安全評(píng)價(jià)結(jié)論 根據(jù) XXX 水庫(kù)的病險(xiǎn)、安全鑒定及震損情況綜合評(píng)定,水庫(kù)大壩屬三類壩,即為不安全大壩,亟待進(jìn)行除險(xiǎn)加固。水庫(kù)目前沒(méi)有任何監(jiān)測(cè)設(shè)施。 本區(qū)域氣候具有冬干、春旱、 夏洪、秋綿的特點(diǎn),適宜冬、春季施工。 主體工程施工 壩坡采用人工整理找平,人工夯實(shí),表面清除的土方、雜草人工裝拖拉機(jī)外運(yùn)處理,拆除石料臨時(shí)堆放在兩側(cè)及馬道備用。 放水設(shè)施斜臥管及壩身涵管拆除,壩身涵管拆除時(shí),對(duì)其上壩體部分挖開(kāi)每 3m高預(yù)留 1m寬?cǎi)R道,邊坡采用 1: ,人工開(kāi)挖。 主體工程 3 個(gè)月,安排在 2020 年 12 月至 2020 年 2 月,根據(jù)工程特點(diǎn)及水庫(kù)運(yùn)行管理要求,具體詳 施工進(jìn)度計(jì)劃表。 獨(dú)立費(fèi)用:項(xiàng)目建設(shè)管理費(fèi)按建安工程量的 %計(jì)??;工程建設(shè)監(jiān)理費(fèi)按建安工程量的 3%計(jì)??;勘測(cè)設(shè)計(jì)費(fèi)按建安工程量的 7%計(jì)??;工程定額測(cè)定費(fèi)按建安工程量的%計(jì)??;工程質(zhì)量監(jiān)督費(fèi)和工程質(zhì)量檢測(cè)費(fèi)按建安工程量的 %;招標(biāo)業(yè)務(wù)費(fèi)按一至四部分費(fèi)用合計(jì)的 %計(jì)取。 工程概況 XXX 水庫(kù)位于 XX 市云集鄉(xiāng)云豐村 XXX,水庫(kù)于 1975 年 9 月動(dòng)工修建, 1978 年 11月完工投入使用。 第 12頁(yè) 共 78 頁(yè) 樞紐工程由大壩、溢洪道、放水設(shè)施等部分組成,基本情況如下: 大壩: XXX 水庫(kù)大壩為均質(zhì)土壩,最大壩高 12m,壩頂高程 ,壩頂寬 3m,大壩全長(zhǎng) 110m。 表 XXX 水庫(kù)以上河道特征值表 水庫(kù) 原數(shù)據(jù) 本次量算數(shù)據(jù) 本次采用 面積 km2 河長(zhǎng) km 比降 ‰ 面積 km2 河長(zhǎng) km 比降 ‰ 面積 km2 河長(zhǎng) km 比降 ‰ XXX 第 13頁(yè) 共 78 頁(yè) 洪峰流量計(jì)算 本次采用四川省水電廳 1984 年 6 月編制的《四川省中小流域暴雨洪水計(jì)算手冊(cè)》提供的資料,按設(shè)計(jì)洪水 20 年一遇,校核洪水 200 一遇的標(biāo)準(zhǔn)進(jìn)行洪水計(jì)算。 溢洪道:水庫(kù)溢洪道位于大壩右側(cè),為正堰進(jìn)口溢洪道,據(jù)《四川省 XX 市 XXX 水庫(kù)安全評(píng)價(jià)報(bào)告書(shū)》( XX 市江匯水利電力建筑勘察設(shè)計(jì)所, 2020 年