freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

中英文對(duì)照裝飾施工合同(存儲(chǔ)版)

  

【正文】 hey shall be dealt with by mutual consultation between the two parties. 十一、附件ANNEX 1. 工程估價(jià)單Annex 1. Single WarrantyAnnex 2. Itemized expenditure list of Party B for the construction (. waste removal fees charged by the property management). Annex 3. Construction drawings and practice notes. Party A (Chop): Party B (Chop): 上海巧點(diǎn)裝飾設(shè)計(jì)有限公司 Corporation: Company Owner (name): 廖娟英Company Owner (name): Company Owner (name):Project Leader: Project Leader: 王開銳Address: Address: 姚虹路299弄12號(hào)1401Post Code: Post Code: 201103Phone: Phone: 54775839Fax: Fax: 54775608 Bank Name: 農(nóng)行上海市長(zhǎng)寧區(qū)古北新區(qū)支行 Account Name: 上海巧點(diǎn)裝飾設(shè)計(jì)有限公司 Account Number: 03382700040002751Date: 年 月 日 Date: 年 月 日 4。凡甲方私自與施工人員商定更改施工內(nèi)容、增加施工項(xiàng)目所引起的一切后果,甲方自負(fù),給乙方造成損失的,甲方應(yīng)予賠償If, during the construction, Party A wishes to propose a change to the design, he should sign a “Change of Project” with Party B and must assume responsibility for resulting delays or increase in costs. If Party A secretly attempts to change to design directly with the construction personnel and this action causes loss to Party B, then Party A must pensate Party B for this loss. 6. 工程驗(yàn)收:乙方負(fù)責(zé)理隱蔽工程和中間工程的檢查與驗(yàn)收手續(xù)。 Completion before: (year) (month) (day)。 in words: 元整. Any changes in this price must be agreed by both parties in writing.8. 工期:自 年 月 日開工,至 年 月 日前竣工,工時(shí)總計(jì) 天,不含國(guó)家法定節(jié)假日,乙方委派現(xiàn)場(chǎng)施工監(jiān)理為 先生,聯(lián)系方式: Period: Start: (year) (month) (day)。s work results in any accidents, the liability for such accidents shall be the responsibility
點(diǎn)擊復(fù)制文檔內(nèi)容
合同協(xié)議相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1